Inspections for the day of: Thursday, January 31, 2019.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00020 General Inspection1/24/20191/31/20192/4/2019 4:49:12 PMPCANC
ESC16-01560 General Inspection1/31/20191/31/20192/1/2019 3:38:33 PM CANC
ESC17-01754 Tracking Control1/30/20191/31/20192/1/2019 3:06:05 PMPPEND
Some of the dirt on Federal Way has been swept. Still need to send more sweeper trucks along Federal.
ESC18-01636 Site Preparation1/31/20191/31/20192/1/2019 2:44:33 PMPPASS
Permit posted. Initial BMPs installed per first phase. Site will be built out in phases as stabilization is accomplished.

Approved for construction. Follow up next week for completion of construction entrances.
ESC18-00528 Site Final1/31/20191/31/20192/1/2019 11:26:25 AMPPASS
Project complete, stabilized and clean. No DI bag in MS4. Business open. ESC permit finaled.
ESC19-00086 Site Preparation1/31/20191/31/20192/1/2019 8:10:00 AMPCANC
to be rescheduled
ESC18-00236 Aging Inspection1/31/20191/31/20191/31/2019 3:59:08 PM CANC
ESC17-01632 Tracking Control1/30/20191/31/20191/31/2019 3:58:32 PMAPASS
Trackout on sidewalk and right lane northbound to Fairview has been cleaned. Sand and dirt in gutter has been cleaned up.
ESC18-00976 Site Final1/31/20191/31/20191/31/2019 3:57:16 PMPPASS
Concrete washout dumped has been cleaned up as requested. No temporary BMPs remaining. Area is stabilized as temporary parking lot.

ESC permit finaled.
ESC18-00528 General Inspection1/31/20191/31/20191/31/2019 10:46:25 AM CANC
ESC19-00085 Site Preparation1/31/20191/31/20191/31/2019 9:56:07 AMAPASS
930 Matthew Falvey

Staging area setup. Two sites east and west of staging area. East site is out of water. End beam/cap to be installed, fill placed, and capped with sandstone steps.

West site is in water for end beam. Crew has turbidity curtain to surround work area. No fill, will place steps on existing material.

Track pads placed over grass to provide equipment access to Greenbelt.
RP and project manager onsite. Permit posted.
ESC17-01676 Aging Inspection1/31/20191/31/20191/31/2019 8:17:58 AM CANC
ESC18-00540 General Inspection1/31/20191/31/20191/31/2019 8:12:11 AM PASS
inpspected 1/30. Subdivision bmps installed. No trackout.
ESC18-00537 General Inspection1/31/20191/31/20191/31/2019 8:08:50 AM CANC