ESC15-01584
| General Inspection | 12/31/2015 | 1/5/2016 | 1/6/2016 1:25:12 PM | A | CANC |
|
|
|
ESC15-00726
| Site Final | 12/31/2015 | 1/5/2016 | 1/6/2016 9:58:40 AM | P | PASS |
|
|
WIP. Site contained by structural/decorative wall for patio and ADA ramp structure. Crews sweeping areas around activity to control dirt.
No muddy runoff observed, no trackout or other violations.
|
ESC15-01483
| BMP Violation | 1/5/2016 | 1/5/2016 | 1/6/2016 9:36:11 AM | P | PART |
|
|
Initial site demo started prior to scheduling Site Prep inspection. RP Kent on site and I notified him of the Site Prep requirement.
We discussed BMPs and project. See Site Prep inspection.
|
ESC15-01560
| Complaint Inspection | 1/5/2016 | 1/5/2016 | 1/5/2016 4:48:28 PM | P | FAIL |
|
|
Complaint received about continued excessive trackout...
Both Sherman and 5th Street are dirty from work and appear to have broom swept. Requested that housekeeping improve, employees be trained and asked to limit trackout, and to have a street sweeper come once construciton is complete and to sweep Sherman between 5th and 6th streeet swept and 6th street between Ada and Sherman swept as a condition of the Site Final.
|
ESC13-01323
| Site Final | 12/15/2015 | 1/5/2016 | 1/5/2016 4:44:26 PM | P | CANC |
|
|
rescheduled
|
ESC15-00709
| General Inspection | 1/5/2016 | 1/5/2016 | 1/5/2016 4:43:38 PM | | PART |
|
|
Need to improve street sweeping efforts. No new trackout or discharges.
|
ESC15-00261
| General Inspection | 1/5/2016 | 1/5/2016 | 1/5/2016 2:48:40 PM | | PASS |
|
|
|
ESC15-00562
| General Inspection | 1/5/2016 | 1/5/2016 | 1/5/2016 2:48:28 PM | | PASS |
|
|
|
ESC12-00403
| General Inspection | 1/5/2016 | 1/5/2016 | 1/5/2016 2:04:03 PM | | PASS |
|
|
No trackout issues from site or staging areas observed. WIP on Simplot HQ, JUMP is nearly complete. Temp BMPs (inlet protection) is installed. No corrections at this time.
|
ESC15-01491
| General Inspection | 1/5/2016 | 1/5/2016 | 1/5/2016 2:00:09 PM | P | CANC |
|
|
inspection scheduled 1/6/2016
|
ESC14-01063
| General Inspection | 1/5/2016 | 1/5/2016 | 1/5/2016 1:58:56 PM | | CANC |
|
|
SWO still issued for Eyrie Canyon phases. Case under review and to be inspected later this week
|
ESC15-00860
| Tracking Control | 1/4/2016 | 1/5/2016 | 1/5/2016 1:53:33 PM | P | CANC |
|
|
no trackout at this time due to limited site activity. Will continue to monitor situation but no trackout or turbid runoff occuring yet.
|
ESC15-01320
| DOC - Permit Finaled | 1/5/2016 | 1/5/2016 | 1/5/2016 1:50:36 PM | P | PASS |
|
|
Home demolished and materials haulded away. Parcel is now a parking lot and new project for the downtown YMCA. See ESC14-01132 for details.
|
ESC14-01132
| General Inspection | 1/5/2016 | 1/5/2016 | 1/5/2016 1:49:07 PM | | PASS |
|
|
Parking lot complete and is now in use. Outstanding fees were paid so parcel tag has been removed. Permit open due to being used for adjacent project by same contractor HC Company, see ESC15-01491. No corrections issued at this time.
|
ESC15-00023
| General Inspection | 1/5/2016 | 1/5/2016 | 1/5/2016 11:45:44 AM | | PART |
|
|
Site is now landscaped and building materials and debris have been removed from site. BLD open with some minor work in progress.
Corrections needed to get final: - sweep sidewalk, gutter and street thoroughly once work is complete and conditions allow. - remove DI bag installed and dispose of properly
Will remove parcel hold since outstading fees are now paid.
|
ESC14-00657
| Random Inspection | 1/5/2016 | 1/5/2016 | 1/5/2016 11:36:49 AM | A | PART |
|
|
Corrections needed at site:
- need to inspect and maintain all DI bags since most are now unfrozen and 50% capacity or more. In particular the two inlets at Signal Rock and Warm Springs
- concrete washout at 75% capacity. New lined washout with rock access pad should be installed this week
|
ESC15-01541
| Site Preparation | 1/5/2016 | 1/5/2016 | 1/5/2016 11:34:27 AM | A | PASS |
|
|
Inspection requested via web by Erby Gonzales
BMPs installed. Approved for excavation. See subdivision permit ESC14-00657 for overall site correction needed.
Note: trash and materials blown across Warm Springs were picked up by Brighton Homes RP
|
ESC15-01476
| Site Preparation | 1/5/2016 | 1/5/2016 | 1/5/2016 11:23:30 AM | P | PART |
|
|
Inspection requested via web by Erby Gonzales
New lined and designated concrete washout provided for new set of foundations in Mill District Square. Storm drain inlets on streets have sediment filter bags installed and with good capacity. Trash at active sites is contained.
Approved to start but correction needed this week:
- install DI bag in storm drain in the alley at the soutn end of Woodcraft. Will sheet flow from an area with loose dirt and by the framing carpenters so lots of sawdust.
|
ESC15-01478
| Site Preparation | 1/5/2016 | 1/5/2016 | 1/5/2016 11:23:12 AM | P | PART |
|
|
Inspection requested via web by Erby Gonzales
New lined and designated concrete washout provided for new set of foundations in Mill District Square. Storm drain inlets on streets have sediment filter bags installed and with good capacity. Trash at active sites is contained.
Approved to start but correction needed this week:
- install DI bag in storm drain in the alley at the soutn end of Woodcraft. Will sheet flow from an area with loose dirt and by the framing carpenters so lots of sawdust.
|
ESC14-00989
| General Inspection | 1/5/2016 | 1/5/2016 | 1/5/2016 11:18:24 AM | | PASS |
|
|
No activity at site. No runoff issues or trackout. Clean site with BMPs implemented.
|
ESC15-01501
| Site Preparation | 1/5/2016 | 1/5/2016 | 1/5/2016 11:11:32 AM | A | PART |
|
|
Inspection requested via web by Erby Gonzales
Approved to start but no concrete work until new leakproof washout pit or container is provided for the new round of projects and pool work.
Need to install construction entrances or designated stucco sand stockpiles off of open muddy areas to prevent trackout as site thaws.
Correction request issued verbally to RP Erby
|
ESC15-01500
| Site Preparation | 1/5/2016 | 1/5/2016 | 1/5/2016 11:11:09 AM | A | PART |
|
|
Inspection requested via web by Erby Gonzales
Approved to start but no concrete work until new leakproof washout pit or container is provided for the new round of projects and pool work.
Need to install construction entrances or designated stucco sand stockpiles off of open muddy areas to prevent trackout as site thaws.
Correction request issued verbally to RP Erby
|
ESC15-01507
| Site Preparation | 1/5/2016 | 1/5/2016 | 1/5/2016 11:10:49 AM | A | PART |
|
|
Inspection requested via web by Erby Gonzales
Approved to start but no concrete work until new leakproof washout pit or container is provided for the new round of projects and pool work.
Need to install construction entrances or designated stucco sand stockpiles off of open muddy areas to prevent trackout as site thaws.
Correction request issued verbally to RP Erby
|
ESC15-01506
| Site Preparation | 1/5/2016 | 1/5/2016 | 1/5/2016 11:10:25 AM | A | PART |
|
|
Inspection requested via web by Erby Gonzales
Approved to start but no concrete work until new leakproof washout pit or container is provided for the new round of projects and pool work.
Need to install construction entrances or designated stucco sand stockpiles off of open muddy areas to prevent trackout as site thaws.
Correction request issued verbally to RP Erby
|
ESC15-01503
| Site Preparation | 1/5/2016 | 1/5/2016 | 1/5/2016 11:10:01 AM | A | PART |
|
|
Inspection requested via web by Erby Gonzales
Approved to start but no concrete work until new leakproof washout pit or container is provided for the new round of projects and pool work.
Need to install construction entrances or designated stucco sand stockpiles off of open muddy areas to prevent trackout as site thaws.
Correction request issued verbally to RP Erby
|
ESC14-01083
| General Inspection | 1/5/2016 | 1/5/2016 | 1/5/2016 11:06:35 AM | | PASS |
|
|
WIP on townhomes. DI bags installed, site perimeter of wattles and fencing is keeping sediment and debris from entering swale. Trash is contained, streets are relatively clean considering the activity.
New round of townhomes with seperate ESC about to begin, RP for Brighton Homes issued correction to provide new concrete washout and have site meeting with workers (stucco guys with bobcat tractors) to prevent trackout as site thaws.
|
ESC14-00597
| Aging Inspection | 1/5/2016 | 1/5/2016 | 1/5/2016 9:19:38 AM | | PASS |
|
|
See ESC14-00588 for main ESC permit details for the District complex. No violations at this time.
|
ESC14-00596
| Aging Inspection | 1/5/2016 | 1/5/2016 | 1/5/2016 9:19:22 AM | | PASS |
|
|
See ESC14-00588 for main ESC permit details for the District complex. No violations at this time.
|
ESC14-00595
| Aging Inspection | 1/5/2016 | 1/5/2016 | 1/5/2016 9:19:09 AM | | PASS |
|
|
See ESC14-00588 for main ESC permit details for the District complex. No violations at this time.
|
ESC14-00594
| Aging Inspection | 1/5/2016 | 1/5/2016 | 1/5/2016 9:18:57 AM | | PASS |
|
|
See ESC14-00588 for main ESC permit details for the District complex. No violations at this time.
|
ESC14-00593
| Aging Inspection | 1/5/2016 | 1/5/2016 | 1/5/2016 9:18:43 AM | | PASS |
|
|
See ESC14-00588 for main ESC permit details for the District complex. No violations at this time.
|