PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Friday, January 5, 2018
.
Number of inspections:
12
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC16-01602
General Inspection
1/5/2018
1/5/2018
1/5/2018 2:27:59 PM
CANC
ESC17-01112
General Inspection
1/5/2018
1/5/2018
1/5/2018 1:52:30 PM
P
PEND
Need to check on creek bed stabilization. Rip rap installed. No lining or seeding evident. Currently snow covered. Pathway is complete between Barber Drive and Millbrook now.
ESC17-00334
Aging Inspection
1/5/2018
1/5/2018
1/5/2018 11:47:58 AM
CANC
ESC16-00159
General Inspection
1/5/2018
1/5/2018
1/5/2018 11:47:49 AM
PASS
All parcels in DHE phase #14 are complete. DHE phase #15 is still active (see ESC16-00489). Storm drain inlets will be audited this spring and shall be removed if remaining.
ESC permit for this phase is finaled.
ESC16-00159
DOC - Permit Finaled
1/5/2018
1/5/2018
1/5/2018 11:45:55 AM
P
PASS
ESC16-00437
General Inspection
1/5/2018
1/5/2018
1/5/2018 11:42:30 AM
PASS
WIP on interior. 2 of 3 buildings are mostly complete. Some apartments now occupied. Perimeter fence still installed, disturbed area between buildings and Greenbelt is frozen snow covered. No trackout or mud on Greenbelt or to Parkcenter. Trash contained.
ESC16-01560
General Inspection
1/5/2018
1/5/2018
1/5/2018 11:32:01 AM
P
PASS
No trackout on Barber Valley Drive. DIs have sediment bags. Joint trench operation occuring on north side of road is not related to upcoming Veranda project (permits under review).
Parking lot across Parkcenter is still in use by Arboretum project employees.
No corrections requested.
ESC14-01083
General Inspection
1/5/2018
1/5/2018
1/5/2018 11:30:24 AM
PASS
WIP on final units on west end of phase. No trackout, discharge, or uncontained trash. Concrete washout located to west of project, also used for new phase across the street. No corrections requested.
ESC17-01491
Random Inspection
1/5/2018
1/5/2018
1/5/2018 11:29:02 AM
P
PASS
WIP on bridge pylon footings. No trackout or discharge from staging area. No spills observed. Dewatering operation is running, water going into settling basin is clear. No plumes observed downstream. Approved.
ESC16-01561
General Inspection
1/5/2018
1/5/2018
1/5/2018 11:11:58 AM
FAIL
Corrections needed:
- trash pick up
- provide trash containment
- clean mud and dirt out of gutters in front of active projects
No trackout to Barber Valley, DIs within sub have sediment protection. No dirt or runoff crossing Greenbelt towards Walling Creek.
Follow up inspection Tuesday Jan 9th
Verbal corrections issued to Zach with Brighton Corp and Erbie with Brighton Homes.
ESC15-00306
General Inspection
1/5/2018
1/5/2018
1/5/2018 11:09:07 AM
CANC
ESC17-00981
BMP Violation
1/5/2018
1/5/2018
1/5/2018 11:08:44 AM
A
FAIL
No trash containment for set of townhomes on corner of Trifecta. WIP on framing and foundations throughout. Streets are dirty, but also frozen with ice and sand chunks.
Correction request to clean up trash pile, install trash containment for all site (1 for every 2 due to space).
Request for perimeter silt fence and/or chain link fence to contain wind blown trash and preserve clearing limits.