ESC14-00886
| Tracking Control | 1/7/2016 | 1/7/2016 | 1/11/2016 7:59:51 AM | P | CANC |
|
|
Rob Phone #: ###-####
|
ESC15-00463
| General Inspection | 1/7/2016 | 1/7/2016 | 1/8/2016 3:35:26 PM | | CANC |
|
|
rescheduled
|
ESC15-00968
| Aging Inspection | 1/7/2016 | 1/7/2016 | 1/8/2016 2:08:15 PM | | PASS |
|
|
Pool complete. ESC conditions satisfied.
|
ESC15-00860
| General Inspection | 1/5/2016 | 1/7/2016 | 1/7/2016 3:40:19 PM | P | PEND |
|
|
check for tracking issues
No activity at site, parking area is very muddy but no trackout occuring.
Need to post sign, need to provide stabilized worker parking area.
|
ESC15-00729
| General Inspection | 1/7/2016 | 1/7/2016 | 1/7/2016 3:09:12 PM | P | PASS |
|
|
Council Springs creek inspection...2 pm
Corrections requested at the Council Springs access road and culvert installation for HRN are complete. A large washed rock check dam is settling and filtering the creek water.
To the left of the road abutting the graded hillside, a series of 4 checkdams are installed to treat runoff from the hillside and roadway.
Silt fence along road is trenched in well and vegetative buffer around banks have been maintained.
There is trackout to Council Springs road from the trailhead/staging area but it is being swept at the end of each day with street sweeper, though dirt is pretty sticky & muddy at this point so sweeping performance is not great. Receiving MS4 has inlet protection.
|
ESC14-00588
| General Inspection | 1/7/2016 | 1/7/2016 | 1/7/2016 12:07:07 PM | | PASS |
|
|
WIP on foundations and frames for buildings at the District. BMPs include silt fence perimeter and vegetative buffer between site and Logger's Creek (channel of river), trackout controls (large rock entrance, small rock at intersection, rumble bars), and concrete washouts.
Spill containment area around fuel tank is in good condtion.
No violations observed, SWPPP info posted. No corrections at this time.
|
ESC13-01159
| General Inspection | 1/7/2016 | 1/7/2016 | 1/7/2016 10:57:16 AM | | PART |
|
|
DI bags installed on subdivision and no discharges offsite. Stormwater retention/infiltration pond is draining well.
Corrections:
-Need to do maintenance on concrete washout pit. About to overflow. - very muddy conditions have caused quite a bit of foot trackout. Still wet, but should sweep tomorrow. and work on cleanaing sidewalks in front of active projects.
Verbal correction to CBH to schedule sweeping and new washout installation.
|
ESC15-00842
| Aging Inspection | 1/7/2016 | 1/7/2016 | 1/7/2016 10:46:12 AM | | PASS |
|
|
Construction of accessory structure complete. No activity or disturbed area observed at site. Permit finaled.
|
ESC15-00842
| DOC - Permit Finaled | 1/7/2016 | 1/7/2016 | 1/7/2016 10:45:37 AM | P | PASS |
|
|
|
ESC15-00840
| Aging Inspection | 1/7/2016 | 1/7/2016 | 1/7/2016 10:11:49 AM | | PASS |
|
|
Townhome complete. BLD finaled. BMPs to remain in Park Place/MA Williams townhomes. See ESC14-01083 for main development permit details. This permit finaled.
|
ESC15-00840
| DOC - Permit Finaled | 1/7/2016 | 1/7/2016 | 1/7/2016 10:11:37 AM | P | PASS |
|
|
|
ESC15-00839
| Aging Inspection | 1/7/2016 | 1/7/2016 | 1/7/2016 10:11:03 AM | | PASS |
|
|
Townhome complete. BLD finaled. BMPs to remain in Park Place/MA Williams townhomes. See ESC14-01083 for main development permit details. This permit finaled.
|
ESC15-00839
| DOC - Permit Finaled | 1/7/2016 | 1/7/2016 | 1/7/2016 10:08:23 AM | P | PASS |
|
|
|
ESC14-01151
| General Inspection | 1/7/2016 | 1/7/2016 | 1/7/2016 8:55:30 AM | | PASS |
|
|
Home complete, landscaped, and occupied. Hillside bond issues for revegetation/stabilization. No erosion observed, no sediment leaving parcel.
|
ESC14-01151
| DOC - Permit Finaled | 1/7/2016 | 1/7/2016 | 1/7/2016 8:54:28 AM | P | PASS |
|
|
|