Inspections for the day of: Thursday, January 7, 2016.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00886 Tracking Control1/7/20161/7/20161/11/2016 7:59:51 AMPCANC
Rob Phone #: ###-####
ESC15-00463 General Inspection1/7/20161/7/20161/8/2016 3:35:26 PM CANC
rescheduled
ESC15-00968 Aging Inspection1/7/20161/7/20161/8/2016 2:08:15 PM PASS
Pool complete. ESC conditions satisfied.
ESC15-00860 General Inspection1/5/20161/7/20161/7/2016 3:40:19 PMPPEND
check for tracking issues

No activity at site, parking area is very muddy but no trackout occuring.

Need to post sign, need to provide stabilized worker parking area.
ESC15-00729 General Inspection1/7/20161/7/20161/7/2016 3:09:12 PMPPASS
Council Springs creek inspection...2 pm

Corrections requested at the Council Springs access road and culvert installation for HRN are complete. A large washed rock check dam is settling and filtering the creek water.

To the left of the road abutting the graded hillside, a series of 4 checkdams are installed to treat runoff from the hillside and roadway.

Silt fence along road is trenched in well and vegetative buffer around banks have been maintained.

There is trackout to Council Springs road from the trailhead/staging area but it is being swept at the end of each day with street sweeper, though dirt is pretty sticky & muddy at this point so sweeping performance is not great. Receiving MS4 has inlet protection.
ESC14-00588 General Inspection1/7/20161/7/20161/7/2016 12:07:07 PM PASS
WIP on foundations and frames for buildings at the District. BMPs include silt fence perimeter and vegetative buffer between site and Logger's Creek (channel of river), trackout controls (large rock entrance, small rock at intersection, rumble bars), and concrete washouts.

Spill containment area around fuel tank is in good condtion.

No violations observed, SWPPP info posted. No corrections at this time.
ESC13-01159 General Inspection1/7/20161/7/20161/7/2016 10:57:16 AM PART
DI bags installed on subdivision and no discharges offsite. Stormwater retention/infiltration pond is draining well.

Corrections:

-Need to do maintenance on concrete washout pit. About to overflow.
- very muddy conditions have caused quite a bit of foot trackout. Still wet, but should sweep tomorrow. and work on cleanaing sidewalks in front of active projects.

Verbal correction to CBH to schedule sweeping and new washout installation.

ESC15-00842 Aging Inspection1/7/20161/7/20161/7/2016 10:46:12 AM PASS
Construction of accessory structure complete. No activity or disturbed area observed at site. Permit finaled.
ESC15-00842 DOC - Permit Finaled1/7/20161/7/20161/7/2016 10:45:37 AMPPASS
ESC15-00840 Aging Inspection1/7/20161/7/20161/7/2016 10:11:49 AM PASS
Townhome complete. BLD finaled. BMPs to remain in Park Place/MA Williams townhomes. See ESC14-01083 for main development permit details. This permit finaled.
ESC15-00840 DOC - Permit Finaled1/7/20161/7/20161/7/2016 10:11:37 AMPPASS
ESC15-00839 Aging Inspection1/7/20161/7/20161/7/2016 10:11:03 AM PASS
Townhome complete. BLD finaled. BMPs to remain in Park Place/MA Williams townhomes. See ESC14-01083 for main development permit details. This permit finaled.
ESC15-00839 DOC - Permit Finaled1/7/20161/7/20161/7/2016 10:08:23 AMPPASS
ESC14-01151 General Inspection1/7/20161/7/20161/7/2016 8:55:30 AM PASS
Home complete, landscaped, and occupied. Hillside bond issues for revegetation/stabilization. No erosion observed, no sediment leaving parcel.
ESC14-01151 DOC - Permit Finaled1/7/20161/7/20161/7/2016 8:54:28 AMPPASS