ESC18-01735
| General Inspection | 1/7/2019 | 1/7/2019 | 1/11/2019 1:25:28 PM | P | PASS |
|
|
no construction activity yet. Equipment staged in parking lot.
|
ESC14-00788
| General Inspection | 1/7/2019 | 1/7/2019 | 1/8/2019 2:58:20 PM | P | PASS |
|
|
Two SFHs in progress by Bruno Built. No new activity.
Will need to stabilize area on the downhill side of the new retaining wall to prevent sediment runoff to Warm Springs.
|
ESC17-00519
| Aging Inspection | 1/7/2019 | 1/7/2019 | 1/8/2019 11:44:19 AM | | PASS |
|
|
No activity. Infrastructure complete, storm drains already fitted with sediment protection.
|
ESC17-01200
| General Inspection | 1/7/2019 | 1/7/2019 | 1/8/2019 11:05:12 AM | | PEND |
|
|
Former RP has moved companies. Need to find new contact with Layton Construction.
No offsite discharges or trackout. 3 Buildings complete, some open areas still remain within business park.
There is some erosion on the bank at bottom of site near railroad tracks as well as some construction trash that needs to be picked up.
|
ESC18-01266
| BMP Violation | 1/7/2019 | 1/7/2019 | 1/7/2019 4:47:15 PM | P | FAIL |
|
|
Over full trash bin, muddy areas with no stabilized entrance. Trash and debris laying arouund the site.
Correction request to GC-RP George to get a clean up and to implement controls to prevent trackout.
|
ESC18-01315
| BMP Violation | 1/7/2019 | 1/7/2019 | 1/7/2019 4:29:27 PM | P | FAIL |
|
|
Correction request to RP Kyle to do trash pick up and clean up anything that has blown into the adjacent open space.
|
ESC14-00788
| Aging Inspection | 1/7/2019 | 1/7/2019 | 1/7/2019 4:28:27 PM | | CANC |
|
|
|
ESC17-00018
| General Inspection | 1/7/2019 | 1/7/2019 | 1/7/2019 3:47:06 PM | P | PASS |
|
|
Subdivision BMPs are installed. No trackout from subdivision. SFHs permitted seperately. Inspection of stormwater ponds show it is functioning properly, there are new plantings along the banks for the sediment forebay and the stormwater infiltration pond have been.
No corrections for subdivsion.
|
ESC16-01253
| Site Final | 1/7/2019 | 1/7/2019 | 1/7/2019 3:44:19 PM | P | PASS |
|
|
Yard is no landscaped, home is occupied.. Storm water retention basin is fully vegetated. No sediment bags left in storm drains on Millet. Adjacent lot used by both new homes still has some bare spots but the lower end has a vegetative buffer. Should re-seed itself during the Spring.
|
ESC16-01253
| General Inspection | 1/7/2019 | 1/7/2019 | 1/7/2019 3:41:31 PM | | CANC |
|
|
|
ESC18-00028
| DOC - Permit Finaled | 1/7/2019 | 1/7/2019 | 1/7/2019 3:25:47 PM | P | PASS |
|
|
Home complete. Temporary BMPs to remain installed for ongoing construction.
|
ESC18-00297
| Site Final | 1/7/2019 | 1/7/2019 | 1/7/2019 3:23:39 PM | P | PASS |
|
|
Home complete. Temporary BMPs to remain installed for ongoing construction.
|
ESC18-00235
| Site Final | 1/7/2019 | 1/7/2019 | 1/7/2019 3:23:28 PM | P | PASS |
|
|
Home complete. Temporary BMPs to remain installed for ongoing construction.
|
ESC18-00444
| Site Final | 1/7/2019 | 1/7/2019 | 1/7/2019 3:23:03 PM | P | PASS |
|
|
Home complete. Temporary BMPs to remain installed for ongoing construction.
|
ESC18-00252
| Site Final | 1/7/2019 | 1/7/2019 | 1/7/2019 3:22:48 PM | P | PASS |
|
|
Home complete. Temporary BMPs to remain installed for ongoing construction.
|
ESC18-00458
| Site Final | 1/7/2019 | 1/7/2019 | 1/7/2019 3:22:34 PM | P | PASS |
|
|
Home complete. Temporary BMPs to remain installed for ongoing construction.
|
ESC18-00298
| Site Final | 1/7/2019 | 1/7/2019 | 1/7/2019 3:21:58 PM | P | PASS |
|
|
Home complete. Temporary BMPs to remain installed for ongoing construction.
|
ESC18-00278
| DOC - Permit Finaled | 1/7/2019 | 1/7/2019 | 1/7/2019 3:18:47 PM | P | PASS |
|
|
Home complete. Temporary BMPs to remain installed for ongoing construction.
|
ESC18-00160
| Site Final | 1/4/2019 | 1/7/2019 | 1/7/2019 3:17:46 PM | P | PASS |
|
|
Home complete. Temporary BMPs to remain installed for ongoing construction.
|
ESC18-00159
| Site Final | 1/4/2019 | 1/7/2019 | 1/7/2019 3:17:25 PM | P | PASS |
|
|
Home complete. Temporary BMPs to remain installed for ongoing construction.
|
ESC18-00157
| Site Final | 1/4/2019 | 1/7/2019 | 1/7/2019 3:17:05 PM | P | PASS |
|
|
Home complete. Temporary BMPs to remain installed for ongoing construction.
|
ESC18-00603
| Site Final | 1/7/2019 | 1/7/2019 | 1/7/2019 2:56:47 PM | P | PASS |
|
|
Work appears complete. BLD is open. Exterior disturbances stabilized, no construciton materials or temporary BMPs left on site. ESC permit finaled.
|
ESC18-01365
| General Inspection | 1/7/2019 | 1/7/2019 | 1/7/2019 2:54:52 PM | P | PART |
|
|
WIP. Working during muddy conditions, trackout throughout culdesac. Subdivision storm drains have sediment protection installed.
Correction to RP to sweep up once conditions are dry and change out DI bags.
|
ESC18-01366
| General Inspection | 1/7/2019 | 1/7/2019 | 1/7/2019 2:52:01 PM | P | FAIL |
|
|
Trackout to Ormund from construction access to backyard.
Correction: - install fencing to prevent access through mud - clean up the mud clods on Ormund.
Post updated ESC permit signs for homes.
Verbal correction to RP Jason.
|
ESC18-01470
| Tracking Control | 1/7/2019 | 1/7/2019 | 1/7/2019 2:12:37 PM | P | FAIL |
|
|
Workers and deliveries driving accross parking lot east of site instead of using the gravel alley. This is causing some trackout to Helen Street.
Correction request: - clean up minor trackout with broom & shovel - instruct workers and deliveries to not use the parking lot for access - sweep up after backfill of townhomes is complete.
Verbal correction request to RP/GC Jason. Follow up to check conditions later in week
|
ESC18-01473
| Tracking Control | 1/7/2019 | 1/7/2019 | 1/7/2019 2:12:19 PM | P | FAIL |
|
|
Workers and deliveries driving accross parking lot east of site instead of using the gravel alley. This is causing some trackout to Helen Street.
Correction request: - clean up minor trackout with broom & shovel - instruct workers and deliveries to not use the parking lot for access - sweep up after backfill of townhomes is complete.
Verbal correction request to RP/GC Jason. Follow up to check conditions later in week
|
ESC18-00939
| BMP Violation | 1/2/2019 | 1/7/2019 | 1/7/2019 2:02:47 PM | P | PASS |
|
|
follow up to correction request
Sidewalk has been swept as requested. Trash mostly contained. Receiving storm drain has sediment protection. Approved.
|
ESC17-01754
| Tracking Control | 1/2/2019 | 1/7/2019 | 1/7/2019 2:00:47 PM | A | FAIL |
|
|
follow up
Trackout to Hudson continues. Workers still parking in the mud along the road. Lots of mud on top of construction entrance.
No new rock installed for parking areas that are muddy. Street sweeper did Targee @ Hudson,but there is still lots of dirt SE bound on Federal Way.
Final correction request until escalated enforcement enforcement
Request: - finish installing rock for employee parking - clean up construciton entrance; limit in site traffic from tracking mud onto entrance. - install more rock as necessary
|
ESC18-00507
| General Inspection | 1/7/2019 | 1/7/2019 | 1/7/2019 11:18:30 AM | P | PASS |
|
|
Home near completion. Permit posted, no loose trash, debris, or sediment on or around site. Some landscaping remains.
|
ESC18-00737
| BMP Violation | 1/3/2019 | 1/7/2019 | 1/7/2019 11:13:26 AM | P | PASS |
|
|
trash patrol
Trash picked up and trash bin has been constructed. No trackout or discharges from site.
No new corrections.
|
ESC18-01285
| BMP Violation | 1/3/2019 | 1/7/2019 | 1/7/2019 11:12:25 AM | P | CANC |
|
|
duplicate entry, see Tracking Control inspection
|
ESC18-01792
| Site Preparation | 1/4/2019 | 1/7/2019 | 1/7/2019 11:10:08 AM | A | PASS |
|
|
10:30 AM with Josh
Reviewed ESC permit conditions with RP and crew. Permit sign posted.
Plan is to preserve existing vegetation around garage addition footprint. There is a 30 ft flat grassy buffer in backyard, no additional sediment control needed.
Regular housekeeping, permit signage, concrete washout and using existing access will be main BMPs.
Approved for construction.
|
ESC18-00496
| BMP Violation | 1/4/2019 | 1/7/2019 | 1/7/2019 10:31:15 AM | A | PASS |
|
|
Corrections completed:
- Trash pile removed. - Trash around lots picked up - Common driveway, Eagleson sidewalk and gutter swept. - Storm drain sediment protection installed on receiving inlet south of site.
Approved
|
ESC18-00592
| General Inspection | 1/4/2019 | 1/7/2019 | 1/7/2019 10:30:50 AM | A | PASS |
|
|
Corrections completed:
- Trash pile removed. - Trash around lots picked up - Common driveway, Eagleson sidewalk and gutter swept. - Storm drain sediment protection installed on receiving inlet south of site.
Approved
|
ESC17-00146
| Aging Inspection | 1/7/2019 | 1/7/2019 | 1/7/2019 8:16:28 AM | | CANC |
|
|
|