ESC18-01739
| Tracking Control | 1/8/2019 | 1/8/2019 | 1/11/2019 3:06:12 PM | P | PEND |
|
|
need to send letter of notice to all builders in Bonneville Point.
|
ESC18-01329
| BMP Violation | 1/4/2019 | 1/8/2019 | 1/11/2019 2:56:49 PM | P | CANC |
|
|
|
ESC18-00020
| General Inspection | 1/8/2019 | 1/8/2019 | 1/8/2019 3:53:11 PM | P | FAIL |
|
|
Corrections needed:
- construction entrance at upper staging and stockpile area and the concrete washout on Hootowl needs more construction rock and to turn up the existing rock compacted with mud. There is trackout at both areas.
Install new rock, make sure there is adequate length, width, depth and type of rock per SWPPP construction details for construction entrances.
Schedule follow up inspection.
|
ESC16-00489
| General Inspection | 1/7/2019 | 1/8/2019 | 1/8/2019 3:19:07 PM | P | PASS |
|
|
SFHs in progress. Subdivision near full. Need to have WR Gann and Seidl homes pull the DI bags that are still installed where all parcels are stabilized.
|
ESC18-01626
| General Inspection | 1/8/2019 | 1/8/2019 | 1/8/2019 3:18:07 PM | P | PASS |
|
|
Concrete washout containement utilized. Permit signs posted. No trackout or discharges.
|
ESC18-00005
| Site Final | 1/8/2019 | 1/8/2019 | 1/8/2019 3:15:56 PM | P | PASS |
|
|
Home complete and landscaped. Storm drain sediment protection installed for ongoing construction in DHE #15-16
|
ESC18-00355
| Site Final | 1/8/2019 | 1/8/2019 | 1/8/2019 3:15:00 PM | P | PASS |
|
|
Home complete and landscaped. Storm drain sediment protection installed for ongoing construction in DHE #15-16
|
ESC17-00013
| General Inspection | 1/8/2019 | 1/8/2019 | 1/8/2019 3:12:40 PM | P | PASS |
|
|
Homes now in progress and permitted seperately. Contractor is Walt Gann. Lined concrete washout provided, permit signs posted. No trackout or discharges. No trash issues.
|
ESC17-01680
| Aging Inspection | 1/8/2019 | 1/8/2019 | 1/8/2019 3:00:00 PM | | PASS |
|
|
|
ESC18-01568
| Complaint Inspection | 1/8/2019 | 1/8/2019 | 1/8/2019 2:57:02 PM | P | PEND |
|
|
No permit sign posted. Some mud and debris from site on sidewalk and gutter in front of home.
Posted ESC permit sign.
Corrections needed: - pick up loose trash just outside of trash bin - sweep sidewalk regularly; install boards or gravel for workers to walk on to prevent muddying trackout. - do not park on grassy median between curb and sidewalk to preserve the vegetation
|
ESC18-01534
| Site Final | 1/8/2019 | 1/8/2019 | 1/8/2019 2:42:52 PM | P | DONE |
|
|
See ESC18-01534 for rest of project
|
ESC17-01687
| BMP Violation | 1/8/2019 | 1/8/2019 | 1/8/2019 2:08:40 PM | P | FAIL |
|
|
Corrections needed: - pick up all loose trash around site - get a dumpster or trash container built - maintain construciton entrances. Close gate for River Street access.
Follow up Friday 1/11
|
ESC16-01706
| General Inspection | 1/8/2019 | 1/8/2019 | 1/8/2019 12:22:54 PM | | PASS |
|
|
Warehouse now complete. Parking lot paved and frontage along Irving has been sodded. Large stockpile of dirt and disturbed area are still onsite. Will continue to monitor. No trackout or discharges occuring.
|
ESC18-01289
| General Inspection | 1/7/2019 | 1/8/2019 | 1/8/2019 12:04:53 PM | P | PASS |
|
|
No trackout to Federal Way or Summersweet. Construction entrances and storm drains sediment protection are installed.
|
ESC17-01360
| General Inspection | 1/8/2019 | 1/8/2019 | 1/8/2019 11:49:13 AM | P | FAIL |
|
|
Corrections needed:
- concrete washout area needs new construction rock entrance and/or maintenance of existing entrance to prevent further trackout. Some minor trackout already occuring. - one container is full to brim, spilling over. A new containment is needed. The other bin does not have a ramp(?) - need to work with SFH homebuilders to do a trash pick up in the open areas. Lots of wind blown trash and debris in all open spaces between homes.
No trackout or discharges offsite. Stormdrains have sediment protection.
|
ESC18-01071
| General Inspection | 1/8/2019 | 1/8/2019 | 1/8/2019 11:38:41 AM | P | PASS |
|
|
No activity at time of inspection. Roads have been cut and sewer installed. Need to get paving, curb, and sidewalks. No trackout from site, no loose trash. Permit and SWPPP info posted at end of Snow Bird.
|
ESC18-01253
| General Inspection | 1/8/2019 | 1/8/2019 | 1/8/2019 11:15:49 AM | P | PASS |
|
|
Temporary parking lot complete, compacted road mix surface. Will keep permit open to monitor runoff . Sheeet flow to surrounding vegetation.
Lots of trash dumped in the area.
|
ESC18-01411
| General Inspection | 1/8/2019 | 1/8/2019 | 1/8/2019 10:34:38 AM | A | PASS |
|
|
Permit sign posted. Storm drain on McGregor has and sediment protection. No activity at site, grading for building footprint looks complete.
No significant trackout, but once work resumes the construction entrance will need to scraped and more rock added.
|
ESC16-00938
| General Inspection | 1/8/2019 | 1/8/2019 | 1/8/2019 8:17:09 AM | | CANC |
|
|
|
ESC17-01762
| General Inspection | 1/8/2019 | 1/8/2019 | 1/8/2019 8:15:04 AM | | FAIL |
|
|
Ongoing trackout issues. See ESC17-01754 for inspection reports and enforcement
|
ESC17-01761
| General Inspection | 1/8/2019 | 1/8/2019 | 1/8/2019 8:14:39 AM | | FAIL |
|
|
Ongoing trackout issues. See ESC17-01754 for inspection reports and enforcement
|
ESC17-01760
| General Inspection | 1/8/2019 | 1/8/2019 | 1/8/2019 8:14:22 AM | | FAIL |
|
|
Ongoing trackout issues. See ESC17-01754 for inspection reports and enforcement
|
ESC17-01759
| General Inspection | 1/8/2019 | 1/8/2019 | 1/8/2019 8:13:57 AM | | FAIL |
|
|
Ongoing trackout issues. See ESC17-01754 for inspection reports and enforcement
|
ESC17-01758
| General Inspection | 1/8/2019 | 1/8/2019 | 1/8/2019 8:13:38 AM | | FAIL |
|
|
Ongoing trackout issues. See ESC17-01754 for inspection reports and enforcement
|