Inspections for the day of: Tuesday, January 9, 2018.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00133 Site Final1/9/20181/9/20181/11/2018 11:54:40 AMPPASS
Demo complete, lot vegetated along perimeter, no loose dirt or other materials leaving site. ESC permit finaled.
ESC16-01561 BMP Violation1/5/20181/9/20181/10/2018 2:13:01 PMACANC
ESC17-01112 General Inspection1/5/20181/9/20181/10/2018 1:35:48 PMPPEND
check with PW engineering on rip rap & culverts
ESC16-01139 Aging Inspection1/9/20181/9/20181/10/2018 1:27:39 PM PASS
No disturbed area at site. BLD still open, but earth disturbing phase of project is complete. ESC permit finaled.
ESC17-00190 General Inspection1/9/20181/9/20181/9/2018 4:43:17 PMPCANC
ESC17-00954 Tracking Control1/9/20181/9/20181/9/2018 4:18:17 PMPPEND
RP called back stating that crews have started clean up of street and gathering BMPs for installation.
ESC16-01617 General Inspection1/9/20181/9/20181/9/2018 10:55:53 AM CANC
ESC17-00102 BMP Violation1/8/20181/9/20181/9/2018 10:55:29 AMPPEND
Summit Development and Granite working on corrections issued 1/8. Follow up to check on trash and road cleaning for 1/11 AM
ESC17-00904 BMP Violation1/8/20181/9/20181/9/2018 10:55:17 AMPPEND
Summit Development and Granite working on corrections issued 1/8. Follow up to check on trash and road cleaning for 1/11 AM
ESC17-00954 BMP Violation1/9/20181/9/20181/9/2018 10:41:37 AMAFAIL
Turbid discharge occuring after precipitation. Source of muddy water is from rinsing is from trackout on Winsome at site entrance. Site appears to be retaining runoff.

Trackout observed 12/18 does not appear to have been swept. Significant violation, immediate corrections required.

Corrections:
- sweep up street and scrape mud stuck on road at entrance
- install gutter check dams within 50 m of entrance.
- inlet protection should be installed on the two basin drains on Winsome @ Bogus. Clean up any remaining mud around inlets.
ESC17-00133 General Inspection1/9/20181/9/20181/9/2018 8:03:39 AM CANC
ESC16-00767 Aging Inspection1/9/20181/9/20181/9/2018 8:03:15 AM CANC