Inspections for the day of: Thursday, January 9, 2020.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-01341 Conference1/6/20201/9/20201/9/2020 1:54:04 PMADONE
Meet with RP Bill to review changes at site. No violations observed during inspection/conference

Main objective till the backfill is placed is to provide leakproof concrete washout and prevent trackout. The frontage perimeter is vegetated and no runoff issues occuring.

Backfill is to occur within the next two weeks. New grading plan and landscaping plan is being submitted to PW hillside. After backfill and new grade for the back slope, a top of slope diversion berm, slope interupting wattles and implementation of stabilization.
ESC19-00311 General Inspection1/9/20201/9/20201/9/2020 1:42:44 PM PASS
ESC18-01687 General Inspection1/9/20201/9/20201/9/2020 8:31:50 AM CANC
ESC18-01171 General Inspection1/9/20201/9/20201/9/2020 8:31:42 AM CANC
ESC16-00935 Conference1/7/20201/9/20201/8/2020 8:33:39 AMPCANC