PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Monday, October 10, 2016
.
Number of inspections:
30
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC15-01004
General Inspection
10/10/2016
10/10/2016
10/14/2016 10:14:28 AM
PEND
Request issued to check inlet sediment control at Capitol and Myrtle
ESC14-00206
General Inspection
10/10/2016
10/10/2016
10/13/2016 10:50:53 AM
CANC
ESC15-00745
General Inspection
10/10/2016
10/10/2016
10/13/2016 10:50:31 AM
CANC
ESC15-01027
General Inspection
10/10/2016
10/10/2016
10/12/2016 10:40:10 AM
PASS
ESC16-00788
General Inspection
10/10/2016
10/10/2016
10/11/2016 3:12:35 PM
P
PASS
Foundation work in progress. All ESC BMPs from ESC plan are now installed. No trackout or discharges. Builder and adjacent lot owner under agreement for stockpile and lot management, no further issues at this time.
No corrections requested at this time.
ESC15-00951
General Inspection
10/10/2016
10/10/2016
10/11/2016 1:08:24 PM
P
FAIL
Need to install designated lined washout for SFH builders. Currently no washout. Dumping on open lots, no containment and creating trackout issue.
Correction request issued to subdivision devlopment, Guy H. ###-####
ESC15-00509
Complaint Inspection
10/10/2016
10/10/2016
10/11/2016 11:24:14 AM
P
CANC
ESC15-01188
General Inspection
10/10/2016
10/10/2016
10/11/2016 11:20:30 AM
PASS
Near completion. Grading for yard hydroseeding and landscaping has been completed. Inlets at Windsong have filter mats installed. No trackout or discharges.
ESC15-01519
General Inspection
10/10/2016
10/10/2016
10/10/2016 4:36:55 PM
PASS
Project covered under main ESC permit for Afton, see ESC15-01184
ESC15-01519
DOC - Permit Finaled
10/10/2016
10/10/2016
10/10/2016 4:36:19 PM
P
PASS
ESC16-00356
Site Final
10/10/2016
10/10/2016
10/10/2016 4:13:00 PM
P
PASS
Construction complete. Street and construction site have been cleaned. SFH now landscaped and occupied. ESC permit conditions satisfied.
ESC15-01579
General Inspection
10/10/2016
10/10/2016
10/10/2016 4:08:07 PM
PASS
Silt fence perimeter is installed. No trackout to Parkcenter. No spills or dischareges observed. Trash and materials contained. Permit & SWPPP information posted at entrance. Approved.
ESC14-00989
General Inspection
10/10/2016
10/10/2016
10/10/2016 4:00:40 PM
PASS
WIP. No discharges or trackout from work area. Trash and materials contained on site. Approved.
ESC16-01163
Site Preparation
10/10/2016
10/10/2016
10/10/2016 3:55:49 PM
P
PASS
Joey Phone #: ###-####
Permit sign(s) posted. Active projects are clean with trash contained. Area storm drains have sediment filter bags installed. Lined designated concrete washout provided and south end of Trailwood. Approved for construction.
ESC16-01162
Site Preparation
10/10/2016
10/10/2016
10/10/2016 3:55:32 PM
P
PASS
Joey Phone #: ###-####
Permit sign(s) posted. Active projects are clean with trash contained. Area storm drains have sediment filter bags installed. Lined designated concrete washout provided and south end of Trailwood. Approved for construction.
ESC16-01161
Site Preparation
10/10/2016
10/10/2016
10/10/2016 3:55:19 PM
P
PASS
Joey Phone #: ###-####
Permit sign(s) posted. Active projects are clean with trash contained. Area storm drains have sediment filter bags installed. Lined designated concrete washout provided and south end of Trailwood. Approved for construction.
ESC16-01160
Site Preparation
10/10/2016
10/10/2016
10/10/2016 3:55:04 PM
P
PASS
Joey Phone #: ###-####
Permit sign(s) posted. Active projects are clean with trash contained. Area storm drains have sediment filter bags installed. Lined designated concrete washout provided and south end of Trailwood. Approved for construction.
ESC16-01265
Site Preparation
10/10/2016
10/10/2016
10/10/2016 3:43:16 PM
P
PASS
Brett Phone #: ###-####
Active projects in compliance. Designated lined washout on Hiawatha. RP calling in site preps. Approved.
ESC15-00860
Aging Inspection
10/10/2016
10/10/2016
10/10/2016 3:39:16 PM
PASS
Home restoration in progress. No violations at site.
ESC13-00690
Aging Inspection
10/10/2016
10/10/2016
10/10/2016 3:37:11 PM
CANC
ESC15-00746
Aging Inspection
10/10/2016
10/10/2016
10/10/2016 11:47:26 AM
PASS
WIP. No ESC violations observed.
ESC15-01473
Aging Inspection
10/10/2016
10/10/2016
10/10/2016 11:39:08 AM
PASS
ESC16-00430
General Inspection
10/10/2016
10/10/2016
10/10/2016 11:25:29 AM
P
PASS
Permit sign posted. Construction entrance and perimeter sediment controls installed. No trackout or discharges. Approved.
ESC15-01067
Aging Inspection
10/10/2016
10/10/2016
10/10/2016 11:24:22 AM
PASS
Minor activity. Slow project. Parking lot undisturbed and no materials or loose dirt onsite. No correcitons needed.
ESC16-00997
General Inspection
10/10/2016
10/10/2016
10/10/2016 11:06:54 AM
P
PASS
WIP on interiior. Permit sign posted, no significant trackout. Site Final scheduled for 10/26
TKO homes to sweep up gutter and clean around inlets before removing DI bags on west end of Woodland. Evergreen Homes has been requested to remove temp DI bags on east end of Woodland.
ESC16-01148
General Inspection
10/6/2016
10/10/2016
10/10/2016 11:03:48 AM
A
PART
Permit sign posted. Concrete foundation crew onsite.
Concete truck washing out on adjacent lot. No pit or other containment in Chaucer sub. Requested that RP clean up washout and reviewed washout BMPs and allowable practices.
Need to have subdivsion developer provide lined washout for new SFH construction. See also ESC15-00951
ESC16-00333
Site Final
10/10/2016
10/10/2016
10/10/2016 10:39:56 AM
A
NR
Home is complete and landscaped. No sediment or other material leaving site.
Ready for ESC final when 2 x DI bags on Woodland are removed. Only two open ESC permits on Woodland now, only 1 remaining lot.
Request issued to Chris with Evergreen
ESC16-00091
General Inspection
10/10/2016
10/10/2016
10/10/2016 8:47:33 AM
PASS
Carports for apartment complex are complete and surrounding area landscaped/cleaned. Apartments now under control of property management company. ESC permit closed.
ESC16-00091
DOC - Permit Finaled
10/10/2016
10/10/2016
10/10/2016 8:46:30 AM
P
PASS
ESC16-00458
DOC - Permit Finaled
10/10/2016
10/10/2016
10/10/2016 7:57:28 AM
P
PASS