Inspections for the day of: Tuesday, October 11, 2016.
Number of inspections: 34
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00159 General Inspection10/11/201610/11/201610/17/2016 10:52:09 AM CANC
ESC15-01175 General Inspection10/11/201610/11/201610/14/2016 12:48:10 PM CANC
ESC15-00180 Site Final10/10/201610/11/201610/13/2016 11:12:36 AMPPASS
All temporary BMPs have been removed. NO filter bags left on MS4 on Sunrise Rim or Shosone. Site is landscaped, stabilized, and perimeter gutters were swept. ESC permit conditions satisfied.
ESC11-00879 General Inspection10/11/201610/11/201610/12/2016 11:54:10 AM PASS
Subdivision BMPS installed and still inspected & maintained by Jayo ESC crew. No issues or violations observed. 3 active projects occuring, permitted seperately. Only 2 lots remaining open and have perimeter sediment control wattles installed.
ESC13-00806 General Inspection10/11/201610/11/201610/12/2016 11:41:36 AM PASS
Foreman Todd on site. Informed me crew will be in process of removing silt fence over the next 2 weeks. Also he will spread some seed over disturbed slope area where irrigation line was installed. Construction entrance installed, no hillside erosion issues observed and onsite storm water drainage and infiltration is installed so runoff should be limited. No immediate corrections, will check on silt fence next inspection.
ESC04-01582 DOC - Permit Finaled10/11/201610/11/201610/11/2016 4:11:44 PMPPASS
old expired permit in system. No inspection.
ESC04-00111 DOC - Permit Finaled10/11/201610/11/201610/11/2016 4:11:34 PMPPASS
old expired permit in system. No inspection.
ESC03-00894 DOC - Permit Finaled10/11/201610/11/201610/11/2016 4:11:23 PMPPASS
old expired permit in system. No inspection.
ESC04-00235 DOC - Permit Finaled10/11/201610/11/201610/11/2016 4:11:11 PMPPASS
old expired permit in system. No inspection.
ESC04-01346 DOC - Permit Finaled10/11/201610/11/201610/11/2016 4:11:02 PMPPASS
old expired permit in system. No inspection.
ESC16-01075 DOC - Permit Finaled10/11/201610/11/201610/11/2016 4:10:35 PMPPASS
Demo complete. New SFH in progress and covered under ESC16-01131. No corrections needed at site. This permit is finaled.
ESC12-00403 General Inspection10/11/201610/11/201610/11/2016 3:56:10 PM CANC
ESC14-00296 General Inspection10/11/201610/11/201610/11/2016 3:55:52 PM CANC
ESC16-01188 Site Preparation10/11/201610/11/201610/11/2016 3:55:11 PMPPASS
Bob ###-####

Permit sign posted. Lot has been previously cleared. Wattle installed along curb on 24th, access to site will be through the alley. Approved for construction.
ESC16-01225 DOC - Permit Finaled10/11/201610/11/201610/11/2016 3:53:44 PMPPASS
Demolition complete. New SFH project ready to begin and covered under ESC16-01188
ESC16-00674 DOC - Permit Finaled10/11/201610/11/201610/11/2016 3:53:04 PMPPASS
Demo complete. SFH now covered by ESC16-00745
ESC16-00948 General Inspection10/11/201610/11/201610/11/2016 3:49:06 PMPPASS
WIP preparing subgrade for road installation. No trackout, fugitive dust or discharges observed. Permit sign is posted.
ESC15-01345 Aging Inspection10/11/201610/11/201610/11/2016 3:47:37 PM PASS
Home complete and is occupied. BLD finaled. Homeowner working on landscaping and stabilization. No MS4 on ths section of 26th, driveway paved, and lot is below grade or road so no runoff potential. No further ESC inspections required, ESC permit finaled.
ESC15-01345 DOC - Permit Finaled10/11/201610/11/201610/11/2016 3:46:00 PMPPASS
ESC16-00186 Aging Inspection10/11/201610/11/201610/11/2016 3:31:51 PM PASS
WIP. NO violations. Homeowner remodel.
ESC15-01492 Aging Inspection10/11/201610/11/201610/11/2016 2:57:17 PM PASS
WIP. NO trackout or discharges. Access drive not yet paved/stabilized.
ESC16-00905 General Inspection10/11/201610/11/201610/11/2016 2:42:56 PMPCANC
data entry error
ESC16-00905 Site Preparation10/10/201610/11/201610/11/2016 2:42:27 PMPPASS
would like call ahead; Mike Phone #: ###-####

MS4 protection on Pocono and Bogart installed. City of Boise permit & SWPPP information and site maps located at site entrance on Pocono. Syman Co. to conduct SWPPP inspections. eNOI for CGP is filed, #IDR12AO60. All surrounding storm drain inlets have sediment filters now installed.

Approved for construction next week. 1st phase will be sewer installation. RP to call me next week for dewatering plan implementation inspection. Plan calls for use of detention/infiltration settling ponds and discharge in the Valley Canal (irrigation district). Will check discharge for turbidity and flow rate.
Currently bringing in dump trucks of dirt,
ESC16-01168 Site Preparation10/11/201610/11/201610/11/2016 1:38:19 PMPCANC
data entry error
ESC15-00660 General Inspection10/11/201610/11/201610/11/2016 12:07:05 PM PASS
Home complete and occupied. Lanscaping and rear hilliside stabilized. Hillside bond issued. No further ESC conditions. DI bag on Windsong to remain due to active construction in area.
ESC15-00660 DOC - Permit Finaled10/11/201610/11/201610/11/2016 12:05:43 PMPPASS
ESC16-00457 Site Final10/11/201610/11/201610/11/2016 12:04:40 PMPPASS
Garage addition complete and disturbed area has been stabilized. No temp BMP removal required. ESC conditions satisfied.
ESC16-00225 General Inspection10/6/201610/11/201610/11/2016 11:49:13 AMAPEND
Significant activity and linear construction on surrounding roadways. Regular sweeping has occured to deal with trackout and loose dirt. Receiving storm drains have sediment protection. Will need to focus on perimeter controls if rainfall forecasted at end of week materializes.

ESC15-00509 Complaint Inspection10/11/201610/11/201610/11/2016 11:36:45 AMPPEND
Complaint for HOA that construction debris left on adjacent proper was not removed...

Roadmix stockpile, concrete chunks and road need to be removed. Hillside bond has been issued.

Informed Visser Building Co. about the stockpile and road created to install fence. VBC to contact me with follow up on stockpile removal. Case pending. Inspeciton/conference rescheduled for Friday.
ESC15-01628 Aging Inspection10/11/201610/11/201610/11/2016 10:59:31 AM PASS
Home complete and occupied. Yard landscaping/stabilization is now acheived. No temp DI bag in MS4 on Coston/Jefferson. ESC condtions satisfied.
ESC15-01628 DOC - Permit Finaled10/11/201610/11/201610/11/2016 9:03:53 AMPPASS
ESC16-00178 General Inspection10/11/201610/11/201610/11/2016 8:10:30 AM CANC
rescheduled for site final 10/13
ESC15-01474 General Inspection10/10/201610/11/201610/10/2016 4:19:45 PMPPASS
Frame of building complete. Parking lot and onsite storm water drainage installed. Drop inlet has sediment filter material covering grate.
Concrete washout pan utilized. No trackout, no fugitive dust. No corrections at this time.
ESC15-01474 Site Preparation10/10/201610/11/201610/10/2016 3:47:44 PMPCANC
data entry error