Inspections for the day of: Thursday, October 11, 2018.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-01224 General Inspection10/9/201810/11/201810/12/2018 3:47:41 PMPFAIL
follow up

no clean up or maintenance observed on 10/11 PM. Follow up scheduled.
ESC17-01429 Aging Inspection10/11/201810/11/201810/12/2018 1:54:11 PM CANC
ESC17-01317 General Inspection10/11/201810/11/201810/12/2018 1:52:50 PM CANC
ESC17-01406 Aging Inspection10/11/201810/11/201810/12/2018 1:52:39 PM CANC
ESC17-01362 Tracking Control10/10/201810/11/201810/12/2018 1:51:51 PMAPASS
entrance needs refeshing....

Trackout broom swept. RP states that street sweeper coming tomorrow AM. More rock to be added next week.

Follow up scheduled.
ESC18-00177 General Inspection10/9/201810/11/201810/12/2018 1:21:50 PMPPEND
follow up on wattles and trash in DHETH #8 / Parkcenter Blvd
ESC17-01491 General Inspection10/11/201810/11/201810/11/2018 3:51:21 PM PASS
ESC17-01200 General Inspection10/11/201810/11/201810/11/2018 3:45:44 PMPPASS
All 3 buildings are constructed. Some areas of site need stabilization and to monitor areas that have been seeded. Site is paved and stormwater is retained on site. No corrections requested
ESC18-01322 Random Inspection10/11/201810/11/201810/11/2018 3:44:51 PMPFAIL
Lots of trackout and mud in gutter and sidewalk. Will need to clean up once mud dries
ESC17-01662 General Inspection10/11/201810/11/201810/11/2018 1:11:12 PM PASS
Pool house complete, area landscaped. Pool ESC permit still open for corrective actions on slope behind pool and above Barber Dr.

See ESC17-01658, this permit finaled.
ESC17-01662 DOC - Permit Finaled10/11/201810/11/201810/11/2018 1:10:00 PMPPASS
ESC18-01071 General Inspection10/11/201810/11/201810/11/2018 1:08:17 PMPCANC
data entry error
ESC18-01071 General Inspection10/11/201810/11/201810/11/2018 1:02:42 PMPPASS
WIP installing utilities. No trackout, workers parking on pavement, machinery and equipment is stored within the site.
ESC17-01043 Site Final10/11/201810/11/201810/11/2018 12:53:02 PMPPASS
Building complete and occupied. Landscaping and stabilization is in progress, site stormwater system is operational and retains water on site.

See ESC17-01200 for Gowen Industrial Park main site permit for remaining work and monitoring of stabilization and vegetation.
ESC17-01754 Tracking Control10/11/201810/11/201810/11/2018 12:30:38 PMPFAIL
Trackout on Hudson from employee parking and site.Construction entrance should be scraped and turn up this week.

Need to gravel side of road or restrict parking on muddy areas.

No inlet protection installed on Targee @ Federal Way SE as requested last week.
ESC18-01238 BMP Violation10/9/201810/11/201810/11/2018 9:54:37 AMAPASS
Trash container now on site as requested. No trackout or discharges. Approved.