ESC18-00164
| General Inspection | 10/11/2019 | 10/11/2019 | 10/14/2019 2:24:35 PM | | PASS |
|
|
No trackout. Cut slopes at grade have been tracked. No wind blown dust observed, site inactive at time of inspection.
Reminder of stockpile stabilization and/or removal
|
ESC17-00895
| General Inspection | 10/11/2019 | 10/11/2019 | 10/14/2019 1:41:38 PM | | PASS |
|
|
All homes are complete in sub, common areas stabilized/landsacepd. Once DI bags are removed the ESC permit may be finaled. RP notified.
|
ESC17-01754
| General Inspection | 10/11/2019 | 10/11/2019 | 10/14/2019 1:25:16 PM | | PASS |
|
|
Some minor interior work occuring. All areas stabilized, on site drainage and Hudson Ave improvements are complete.
Request to remove all storm drain inlet sediment controls on Hudson, Targee, and Federal Way in order to close permit.
|
ESC15-00853
| General Inspection | 10/11/2019 | 10/11/2019 | 10/11/2019 1:52:54 PM | | PASS |
|
|
|
MIS19-00341
| ESC-Conference | 10/10/2019 | 10/11/2019 | 10/11/2019 1:52:48 PM | A | PEND |
|
|
"Re: BLD19-02225 (1774 State), it appears that a painting or drywall contractor dumped a substantial amount of white liquid onto the ground (enough that it flowed about 5'' to the sidewalk) behind this address (i.e., on the 18th St. side of the building). Photo available if you''d like it." Phone #: ###-####
Notified EKC project manager Dale to clean up the dumped material. 208.869.0387
|
ESC19-00506
| General Inspection | 10/11/2019 | 10/11/2019 | 10/11/2019 12:44:47 PM | P | PASS |
|
|
No activity. No trackout. Permit posted, construction entrance installed.
|
ESC16-00225
| General Inspection | 10/11/2019 | 10/11/2019 | 10/11/2019 12:17:04 PM | | CANC |
|
|
|
ESC18-00020
| General Inspection | 10/11/2019 | 10/11/2019 | 10/11/2019 12:11:57 PM | P | PEND |
|
|
Inspection completed 10/9
Site BMPs are installed. No new slope erosion or other issues identified. Dry conditions, no runoff or discharges observed. No dust issues at time of inspection.
Correction requests
- make sure storm drain grates along Barber Drive hill with sediment protection are installed in correct direction to receive runoff. - upper area (unfinished section at top) does not have any stabilization measures implemented and there are no stormwater volume and velocity controls. Concerned this is a source of potential erosion and runoff to subdivsion stormwater facilities. - schedule site walk through and fall preparation with ESC inspectors. - update project RPs listed (ie Andy Hoch/Rollo Bird no longer on project)
|
ESC19-01049
| Site Preparation | 10/10/2019 | 10/11/2019 | 10/11/2019 11:53:08 AM | A | PASS |
|
|
Phone #: 2085591460 >> Inspection requested via mobile web by Aaron Carroll
Permit sign posted, perimter sediment controls installed, heavy duty construction entrance installed, MS4 inlet protection installed. Water truck onsite for dust control.
Approved.
|
ESC18-01568
| Aging Inspection | 10/11/2019 | 10/11/2019 | 10/11/2019 8:54:12 AM | | CANC |
|
|
|
ESC18-01568
| DOC - Permit Finaled | 10/11/2019 | 10/11/2019 | 10/11/2019 8:54:08 AM | P | PASS |
|
|
|
ESC18-01567
| Aging Inspection | 10/11/2019 | 10/11/2019 | 10/11/2019 8:53:32 AM | | CANC |
|
|
|
ESC18-01567
| DOC - Permit Finaled | 10/11/2019 | 10/11/2019 | 10/11/2019 8:53:26 AM | P | PASS |
|
|
|
ESC18-01220
| Aging Inspection | 10/11/2019 | 10/11/2019 | 10/11/2019 8:53:03 AM | | CANC |
|
|
rescheduled for site final
|
ESC18-01422
| Aging Inspection | 10/11/2019 | 10/11/2019 | 10/11/2019 8:51:45 AM | | CANC |
|
|
|
ESC18-00467
| General Inspection | 10/11/2019 | 10/11/2019 | 10/11/2019 8:51:13 AM | | CANC |
|
|
|
ESC18-01430
| General Inspection | 10/11/2019 | 10/11/2019 | 10/11/2019 8:50:56 AM | | CANC |
|
|
|
ESC16-01395
| General Inspection | 10/11/2019 | 10/11/2019 | 10/11/2019 8:50:41 AM | | CANC |
|
|
|
ESC18-01439
| Aging Inspection | 10/11/2019 | 10/11/2019 | 10/11/2019 8:50:32 AM | | CANC |
|
|
|
ESC18-01227
| General Inspection | 10/11/2019 | 10/11/2019 | 10/11/2019 8:46:03 AM | | CANC |
|
|
|