Inspections for the day of: Friday, October 11, 2019.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00164 General Inspection10/11/201910/11/201910/14/2019 2:24:35 PM PASS
No trackout. Cut slopes at grade have been tracked. No wind blown dust observed, site inactive at time of inspection.

Reminder of stockpile stabilization and/or removal
ESC17-00895 General Inspection10/11/201910/11/201910/14/2019 1:41:38 PM PASS
All homes are complete in sub, common areas stabilized/landsacepd. Once DI bags are removed the ESC permit may be finaled. RP notified.

ESC17-01754 General Inspection10/11/201910/11/201910/14/2019 1:25:16 PM PASS
Some minor interior work occuring. All areas stabilized, on site drainage and Hudson Ave improvements are complete.

Request to remove all storm drain inlet sediment controls on Hudson, Targee, and Federal Way in order to close permit.
ESC15-00853 General Inspection10/11/201910/11/201910/11/2019 1:52:54 PM PASS
MIS19-00341 ESC-Conference10/10/201910/11/201910/11/2019 1:52:48 PMAPEND
"Re: BLD19-02225 (1774 State), it appears that a painting or drywall contractor dumped a substantial amount of white liquid onto the ground (enough that it flowed about 5'' to the sidewalk) behind this address (i.e., on the 18th St. side of the building). Photo available if you''d like it." Phone #: ###-####

Notified EKC project manager Dale to clean up the dumped material. 208.869.0387
ESC19-00506 General Inspection10/11/201910/11/201910/11/2019 12:44:47 PMPPASS
No activity. No trackout. Permit posted, construction entrance installed.
ESC16-00225 General Inspection10/11/201910/11/201910/11/2019 12:17:04 PM CANC
ESC18-00020 General Inspection10/11/201910/11/201910/11/2019 12:11:57 PMPPEND
Inspection completed 10/9

Site BMPs are installed. No new slope erosion or other issues identified. Dry conditions, no runoff or discharges observed. No dust issues at time of inspection.

Correction requests

- make sure storm drain grates along Barber Drive hill with sediment protection are installed in correct direction to receive runoff.
- upper area (unfinished section at top) does not have any stabilization measures implemented and there are no stormwater volume and velocity controls. Concerned this is a source of potential erosion and runoff to subdivsion stormwater facilities.
- schedule site walk through and fall preparation with ESC inspectors.
- update project RPs listed (ie Andy Hoch/Rollo Bird no longer on project)
ESC19-01049 Site Preparation10/10/201910/11/201910/11/2019 11:53:08 AMAPASS
Phone #: 2085591460 >> Inspection requested via mobile web by Aaron Carroll

Permit sign posted, perimter sediment controls installed, heavy duty construction entrance installed, MS4 inlet protection installed. Water truck onsite for dust control.

Approved.
ESC18-01568 Aging Inspection10/11/201910/11/201910/11/2019 8:54:12 AM CANC
ESC18-01568 DOC - Permit Finaled10/11/201910/11/201910/11/2019 8:54:08 AMPPASS
ESC18-01567 Aging Inspection10/11/201910/11/201910/11/2019 8:53:32 AM CANC
ESC18-01567 DOC - Permit Finaled10/11/201910/11/201910/11/2019 8:53:26 AMPPASS
ESC18-01220 Aging Inspection10/11/201910/11/201910/11/2019 8:53:03 AM CANC
rescheduled for site final
ESC18-01422 Aging Inspection10/11/201910/11/201910/11/2019 8:51:45 AM CANC
ESC18-00467 General Inspection10/11/201910/11/201910/11/2019 8:51:13 AM CANC
ESC18-01430 General Inspection10/11/201910/11/201910/11/2019 8:50:56 AM CANC
ESC16-01395 General Inspection10/11/201910/11/201910/11/2019 8:50:41 AM CANC
ESC18-01439 Aging Inspection10/11/201910/11/201910/11/2019 8:50:32 AM CANC
ESC18-01227 General Inspection10/11/201910/11/201910/11/2019 8:46:03 AM CANC