ESC16-00319
| General Inspection | 10/12/2016 | 10/12/2016 | 10/14/2016 4:02:36 PM | | PASS |
|
|
Silt fence installation in place and containing dirt on site. Permit posted. Approved.
|
ESC16-00737
| General Inspection | 10/12/2016 | 10/12/2016 | 10/14/2016 10:09:19 AM | P | PASS |
|
|
|
ESC16-00338
| General Inspection | 10/12/2016 | 10/12/2016 | 10/13/2016 3:39:48 PM | | PASS |
|
|
|
ESC16-00007
| Aging Inspection | 10/12/2016 | 10/12/2016 | 10/13/2016 3:04:43 PM | | PASS |
|
|
Park Place unit complete; BLD finaled. Subdivsion BMPs to remain during active construction of remaining units. See also main permit ESC14-01083
|
ESC16-00010
| Aging Inspection | 10/12/2016 | 10/12/2016 | 10/13/2016 3:04:18 PM | | PASS |
|
|
Park Place unit complete; BLD finaled. Subdivsion BMPs to remain during active construction of remaining units. See also main permit ESC14-01083
|
ESC16-00009
| Aging Inspection | 10/12/2016 | 10/12/2016 | 10/13/2016 3:04:00 PM | | PASS |
|
|
Park Place unit complete; BLD finaled. Subdivsion BMPs to remain during active construction of remaining units. See also main permit ESC14-01083
|
ESC16-00004
| Aging Inspection | 10/12/2016 | 10/12/2016 | 10/13/2016 3:03:41 PM | | PASS |
|
|
Park Place unit complete; BLD finaled. Subdivsion BMPs to remain during active construction of remaining units. See also main permit ESC14-01083
|
ESC15-00221
| General Inspection | 10/12/2016 | 10/12/2016 | 10/13/2016 10:04:48 AM | | PASS |
|
|
Home and landscaping project complete. Driveway installed and road free of loose dirt or construction materials. Hillside bond issued. Disturbed area stabilized. ESC permit conditions satisfied.
|
ESC16-00311
| General Inspection | 10/12/2016 | 10/12/2016 | 10/13/2016 9:53:00 AM | | CANC |
|
|
|
ESC16-00312
| General Inspection | 10/12/2016 | 10/12/2016 | 10/13/2016 9:52:38 AM | | CANC |
|
|
|
ESC16-00995
| Site Final | 10/11/2016 | 10/12/2016 | 10/13/2016 8:50:59 AM | A | PASS |
|
|
Phone #: 2087240402 >> Inspection requested via mobile web by Mike Schreiber
Project complete, disturbed area stabilized. Located within vegetated schoolyard. ESC permit conditons satisfied.
|
ESC16-00208
| General Inspection | 10/12/2016 | 10/12/2016 | 10/12/2016 2:01:51 PM | | PASS |
|
|
Plaza grading and brick laying between the Grove and Main Street is complete and open to public. DI on Main has inlet bag installed for multiple projects in final stages. No fugitive dust issues, discharges or trackout from construction area. Working in the center of the Grove now for Welcome building and fountain improvements.
|
ESC16-00796
| Random Inspection | 10/12/2016 | 10/12/2016 | 10/12/2016 1:59:13 PM | P | PASS |
|
|
WIP on Rhodes Park roadside improvments. MS4 inlets have sediment filter bags installed. No trackout from work areas. No spills or discharges observed.
|
ESC16-00468
| Aging Inspection | 10/12/2016 | 10/12/2016 | 10/12/2016 12:27:11 PM | | PASS |
|
|
BLD for home addition finaled. No disturbed area or loose materials on site. ESC permit conditions satisfied.
|
ESC16-00468
| DOC - Permit Finaled | 10/12/2016 | 10/12/2016 | 10/12/2016 12:26:32 PM | P | PASS |
|
|
|
ESC16-00849
| General Inspection | 10/12/2016 | 10/12/2016 | 10/12/2016 12:17:32 PM | P | PASS |
|
|
WIP on foundation. Permit sign is posted, no trackout or discharges. Silt fence perimeter is trenched in and undisturbed. Concrete washout Eco-Pan utilized for containment. Site is currently in compliance.
|
ESC15-00731
| General Inspection | 10/12/2016 | 10/12/2016 | 10/12/2016 12:13:04 PM | | PASS |
|
|
WIP on interior and roofing. No new hillside work beyond large retaining walls. No trackout to Promontory. No erosion issues or new risks observed.
|
ESC16-00353
| General Inspection | 10/12/2016 | 10/12/2016 | 10/12/2016 11:44:35 AM | P | PASS |
|
|
No recent activity, no construction materials or stockpiles on site. Hillside BMPs installed. Entrances to parcels have gator guard wattles and have berms installed to contain and direct runoff away from sloped banks between terraced lots. Storm drain has sediment filter bag, hillsides have some vegetation. No corrections at this time.
|
ESC16-00243
| General Inspection | 10/12/2016 | 10/12/2016 | 10/12/2016 11:42:26 AM | | CANC |
|
|
rescheduled for site final
|
ESC16-00744
| Site Preparation | 10/11/2016 | 10/12/2016 | 10/12/2016 11:15:58 AM | A | PASS |
|
|
Bill Phone #: ###-####
Approved via phone conference. Project confined with industrial staging yard that is recycled asphalt. Concrete apron to road will be swept regularly to control trackout as necessary. Follow up inspection scheduled for next week to check on progress/conditions.
|
ESC16-00175
| Site Final | 10/7/2016 | 10/12/2016 | 10/12/2016 11:13:52 AM | A | PASS |
|
|
10:30 AM with Shane and Jesse
Scope of project complete. Temp BMPs (DI bag on Clubview) and wattles removed. ESC permit conditions satisfied. No further inspections required.
Note: some ongoing work by landscaping crews and interior park path installment remains. Boise Parks n Rec will continue to supervise. Temp construction fence and project sign will be removed before park opening in November.
|
ESC16-00298
| Site Final | 10/11/2016 | 10/12/2016 | 10/12/2016 10:27:24 AM | A | PASS |
|
|
9:30 with Jason JEC and Dave with Inland
Final site walk through conducted. No work or BMPs offsite or in ROW. Staging yard area has been extended by grading pit run of geotextile for extended equipment and material storage.
Drainage ditch has been constructed and stormwater retention/infiltration pond excavated. No vegetation in pond due to potential fire danger and risk to construction yard.
No futher ESC inspections required, permit conditions satisfied. If yard expansion continues in future, new permits will be filed.
|
ESC16-01341
| Site Preparation | 10/11/2016 | 10/12/2016 | 10/12/2016 9:25:39 AM | A | PASS |
|
|
Matt Phone #: ###-####
Belmar BMPs installed and active projects complying with ESC conditions and requests. Lined concrete washout pit provided for foundation work, located on Bagley. RP stated he will allow Downey construction to use washout as well.
|
ESC16-00209
| General Inspection | 10/12/2016 | 10/12/2016 | 10/12/2016 8:55:59 AM | | PASS |
|
|
Watercooler project in progress. Perimeter sediment controls and DI protection installed properly per ESC plan. No trackout, entrance to site through parking lot off Main Street. Staging area and parking area also in good condition. No corrections at this time.
|