Inspections for the day of: Friday, October 12, 2018.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-01017 Site Final10/10/201810/12/201810/15/2018 3:53:01 PMPPASS
Home complete and occupied. Homeowner to finish landscaping. No further ESC corrections or inspection required.
MIS18-00402 ESC-Conference10/12/201810/12/201810/12/2018 3:52:21 PMPFAIL
Complaint received.

Excessive trackout with no clean up. Request to homeowner and excavator Bulldog Excavation to clean up ASAP. This is reportedly to be completed tomorrow. Follow up scheduled for Monday.

This project will now require a general ESC permit.
ESC18-00020 Conference10/10/201810/12/201810/12/2018 3:50:28 PMPDONE
2 PM site walk through of corrections noted 10/10

Review ESC corrections noted on previous inspection with Hunter Homes and Syman Company personnel. Will address drainage erosion occuring along the back side of sub and install controls to prevent water running off Barber Road and eroding area between curn and drainage channel.

Rock check dams to be installed on upper section in borrow ditch along side the unpaved future road.
ESC17-00078 BMP Violation10/10/201810/12/201810/12/2018 3:46:14 PMAPEND
need more perimeter controls on middle section.

Earthen berm and trench dug to intercpet runoff. DI bags changed out.

STill need to install wattle and clean road from muddy excavations.
ESC17-00869 General Inspection10/12/201810/12/201810/12/2018 1:53:58 PM CANC
no activity
ESC17-00013 General Inspection10/12/201810/12/201810/12/2018 1:21:39 PM PASS
ESC17-01434 Aging Inspection10/12/201810/12/201810/12/2018 1:21:29 PM CANC
rescheduled for site final