Inspections for the day of: Thursday, October 13, 2016.
Number of inspections: 39
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00178 Site Final10/11/201610/13/201610/14/2016 3:31:47 PMPNR
Home complete and occupied. Permit open to observe stabilization of disturbed perimeter areas that have been hydroseeded. No violation, no corrections needed.
ESC16-00343 General Inspection10/13/201610/13/201610/14/2016 3:30:40 PM PASS
Project near completion. Final landscaping in progress. Hillside bank to the northeast side of home has been hydroseeded. Will check for Site Final next week.
ESC16-00243 Site Final10/12/201610/13/201610/14/2016 3:29:34 PMPPASS
Home complete, landscaped and perimeter of site including gutter have been cleaned. Temp BMPs in EC#7 and 8 to remain for continued SFH construction. No further actiions required for ESC
ESC15-00762 General Inspection10/13/201610/13/201610/14/2016 2:28:51 PM PASS
Receivng storm drains have sediment filter bags. Closed lanes and gutter areas have been cleaned recently, though some loose dirt & gravel remains.. Work occuring on the interior. No trackout or uncontained trash issues observed.
ESC15-00871 General Inspection10/13/201610/13/201610/14/2016 1:38:13 PM CANC
ESC16-00960 Site Preparation10/13/201610/13/201610/13/2016 4:24:32 PMPDONE
Brett Phone #: ###-####


Note: no inspection. Subdivision BMPs for Peppermill provided. RP for CBH on site supervirsing and site has good record of compliance.. Will inspect next week. Approved to start
ESC16-01264 Site Preparation10/13/201610/13/201610/13/2016 4:22:36 PMPDONE
Brent Phone #: ###-####

Note: no inspection. Subdivision BMPs for Peppermill provided. RP for CBH on site supervirsing and site has good record of compliance.. Will inspect next week. Approved to start
ESC14-00788 General Inspection10/13/201610/13/201610/13/2016 4:11:52 PMPPASS
No activity; BMPs installed. Sediment bags in inlets, hillside wattles and some vegetation has been established. New borrow ditch improved along Warm Springs. No corrections at this time. No SFH activity yet.
ESC16-00603 General Inspection10/13/201610/13/201610/13/2016 4:10:53 PMPPASS
Hydroseeded areas are continued to be irrigated and some growth appears to be established. All equipment and materials has been removed from site and area fenced off by barbed wire. No issues observed, will continue to monitor.
ESC15-00556 General Inspection10/13/201610/13/201610/13/2016 3:58:22 PM PASS
Phase II roads are now paved and have curb, gutter, sidewalk. New storm drains have sediment filter bags installed. No perimeter controls installed currenlty, grading of open parcel and catchment troughs seem to direct water inward to retain and allow infiltration.

Large stockpile in northeast corner of sub will need perimeter controls or to be moved.

No construction activity at time of inspection, no violations. SWPPP info posted.
ESC16-00456 Aging Inspection10/13/201610/13/201610/13/2016 3:54:02 PM PASS
Demo complete. Now covered by ESC16-00365.
ESC16-00456 DOC - Permit Finaled10/13/201610/13/201610/13/2016 3:52:30 PMPPASS
ESC14-01083 General Inspection10/13/201610/13/201610/13/2016 3:11:58 PMPPART
All storm drains fitted with undamaged sediment filter bags. Trash containers provided for materials. Landsaping in progress and not stockpiling on impervious surfaces

Correction request to Erbie and Brighton Corp.
- need to have crew pick up all litter and debris along the back path of units by the swale in MAW Park. Lots of litter and chunks of material in grass and swale.

- Clean up loose dust and debris on Homestretch and Front Runner
ESC16-01221 Site Preparation10/13/201610/13/201610/13/2016 3:07:26 PMPPASS
Yellow card on site Inspection requested via web by Erby Gonzales


Permit signs posted. Receiving storm drain has full capacity sediment bag. Concrete washout pan located across street. RP on site. Approved.
ESC16-01222 Site Preparation10/13/201610/13/201610/13/2016 3:07:12 PMPPASS
Yellow card on site Inspection requested via web by Erby Gonzales


Permit signs posted. Receiving storm drain has full capacity sediment bag. Concrete washout pan located across street. RP on site. Approved.
ESC16-01223 Site Preparation10/13/201610/13/201610/13/2016 3:07:00 PMPPASS
Yellow card on site Inspection requested via web by Erby Gonzales


Permit signs posted. Receiving storm drain has full capacity sediment bag. Concrete washout pan located across street. RP on site. Approved.
ESC16-01224 Site Preparation10/13/201610/13/201610/13/2016 3:06:47 PMPPASS
Yellow card on site Inspection requested via web by Erby Gonzales

Permit signs posted. Receiving storm drain has full capacity sediment bag. Concrete washout pan located across street. RP on site. Approved.
ESC16-00007 DOC - Permit Finaled10/13/201610/13/201610/13/2016 3:04:32 PMPPASS
ESC16-00010 DOC - Permit Finaled10/13/201610/13/201610/13/2016 3:04:10 PMPPASS
ESC16-00009 DOC - Permit Finaled10/13/201610/13/201610/13/2016 3:03:51 PMPPASS
ESC16-00004 DOC - Permit Finaled10/13/201610/13/201610/13/2016 3:02:01 PMPPASS
ESC16-00470 Aging Inspection10/13/201610/13/201610/13/2016 2:46:32 PM PASS
Project near completion. Exterior stabilized and cleaned. No loose dirt or materials on site. No further ESC inspection necessary; BLD still open
ESC16-00470 DOC - Permit Finaled10/13/201610/13/201610/13/2016 2:45:39 PMPPASS
ESC16-01310 General Inspection10/4/201610/13/201610/13/2016 2:40:45 PMPFAIL
WIP on foundation. Concrete truck caused some trackout and then did washout on empty lot (developer owns lot).

Corrections:
- sweep sidewalk and gutter
- Clea up washout pile
ESC15-01184 General Inspection10/13/201610/13/201610/13/2016 1:26:45 PM PASS
Vertical construction in progress. No trackout to 9th or River, stabilized construction entrances installed. No trash issues on 8th street, no discharges. MS4 inlets have filter bag protection. All other ESC permits for Afton have been closed and deferred to this permit.
ESC16-00168 General Inspection10/13/201610/13/201610/13/2016 12:45:00 PM CANC
ESC16-01072 Random Inspection10/13/201610/13/201610/13/2016 12:44:43 PMPPASS
WIP on frame. Vegetative strip around project area has remained intact. No trackout, sediment runoff or spills observed. Permit sign posted in alley where staging is occuring. Approved.
ESC16-00449 Aging Inspection10/13/201610/13/201610/13/2016 12:43:32 PM PASS
Construction activity complete, BLD finaled. No loose dirt or disturbed area at site. Storm gutter and ROW are clean.
ESC16-00449 DOC - Permit Finaled10/13/201610/13/201610/13/2016 12:43:00 PMPPASS
ESC15-00976 General Inspection10/13/201610/13/201610/13/2016 12:29:49 PM PASS
No activity at Idaho Street townhomes. Permits for SFHs/townhomes have been submitted to City for review. No corrections requested at this time.
ESC15-00745 General Inspection10/13/201610/13/201610/13/2016 12:28:27 PMAPASS
Permit sign and SWPPP info posted at construction entrance. Building frame has now been erected but no site improvements or landscaping. Perimeter silt fence is installed around site, no trackout or fugitive dust issues. Approved.
ESC16-00423 Aging Inspection10/13/201610/13/201610/13/2016 12:17:24 PM PASS
WIP. Exterior finish and landscaping remaining. No materials in sidewalk, gutter or street. Trash containment provided. No complaints received. Approved.
ESC16-00843 General Inspection10/13/201610/13/201610/13/2016 10:46:55 AMAPASS
WIP on foundation on Beechcraft buidling. Silt fence perimeter is installed on the north and west side of site. Receiving DI has sediment bag protection with good capacity.

RP onsite, stated today they will be installing wattle today in between the two sections of silt fence. I also requested they shovel accumulated silt trapped outside of DI bag.

No trackout, fugitive dust or discharges. Permit sign and SWPPP info posted.
ESC16-00349 General Inspection10/13/201610/13/201610/13/2016 10:15:26 AM CANC
No issues observed at Somerset Village during inspections on 10/12. No precipitation received in the meanwhile.
ESC15-01417 Aging Inspection10/13/201610/13/201610/13/2016 10:14:25 AM PASS
No disturbd area or construction activity at site. Cellular tower upgrade project complete.
ESC15-01417 DOC - Permit Finaled10/13/201610/13/201610/13/2016 10:13:36 AMPPASS
ESC15-00221 DOC - Permit Finaled10/13/201610/13/201610/13/2016 10:03:52 AMPPASS
ESC15-00339 Site Final10/13/201610/13/201610/13/2016 9:59:29 AMANR
Construction complete pending some interior work and BLD permit requirements. Parking lot and onsite storm water system installed.

Correction request:
- Remove temporary DI bag installed on MS4 on Gage Street. Correction issued to Petra
ESC15-00817 General Inspection10/13/201610/13/201610/13/2016 8:49:22 AM CANC