ESC16-00178
| Site Final | 10/11/2016 | 10/13/2016 | 10/14/2016 3:31:47 PM | P | NR |
|
|
Home complete and occupied. Permit open to observe stabilization of disturbed perimeter areas that have been hydroseeded. No violation, no corrections needed.
|
ESC16-00343
| General Inspection | 10/13/2016 | 10/13/2016 | 10/14/2016 3:30:40 PM | | PASS |
|
|
Project near completion. Final landscaping in progress. Hillside bank to the northeast side of home has been hydroseeded. Will check for Site Final next week.
|
ESC16-00243
| Site Final | 10/12/2016 | 10/13/2016 | 10/14/2016 3:29:34 PM | P | PASS |
|
|
Home complete, landscaped and perimeter of site including gutter have been cleaned. Temp BMPs in EC#7 and 8 to remain for continued SFH construction. No further actiions required for ESC
|
ESC15-00762
| General Inspection | 10/13/2016 | 10/13/2016 | 10/14/2016 2:28:51 PM | | PASS |
|
|
Receivng storm drains have sediment filter bags. Closed lanes and gutter areas have been cleaned recently, though some loose dirt & gravel remains.. Work occuring on the interior. No trackout or uncontained trash issues observed.
|
ESC15-00871
| General Inspection | 10/13/2016 | 10/13/2016 | 10/14/2016 1:38:13 PM | | CANC |
|
|
|
ESC16-00960
| Site Preparation | 10/13/2016 | 10/13/2016 | 10/13/2016 4:24:32 PM | P | DONE |
|
|
Brett Phone #: ###-####
Note: no inspection. Subdivision BMPs for Peppermill provided. RP for CBH on site supervirsing and site has good record of compliance.. Will inspect next week. Approved to start
|
ESC16-01264
| Site Preparation | 10/13/2016 | 10/13/2016 | 10/13/2016 4:22:36 PM | P | DONE |
|
|
Brent Phone #: ###-####
Note: no inspection. Subdivision BMPs for Peppermill provided. RP for CBH on site supervirsing and site has good record of compliance.. Will inspect next week. Approved to start
|
ESC14-00788
| General Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 4:11:52 PM | P | PASS |
|
|
No activity; BMPs installed. Sediment bags in inlets, hillside wattles and some vegetation has been established. New borrow ditch improved along Warm Springs. No corrections at this time. No SFH activity yet.
|
ESC16-00603
| General Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 4:10:53 PM | P | PASS |
|
|
Hydroseeded areas are continued to be irrigated and some growth appears to be established. All equipment and materials has been removed from site and area fenced off by barbed wire. No issues observed, will continue to monitor.
|
ESC15-00556
| General Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 3:58:22 PM | | PASS |
|
|
Phase II roads are now paved and have curb, gutter, sidewalk. New storm drains have sediment filter bags installed. No perimeter controls installed currenlty, grading of open parcel and catchment troughs seem to direct water inward to retain and allow infiltration.
Large stockpile in northeast corner of sub will need perimeter controls or to be moved.
No construction activity at time of inspection, no violations. SWPPP info posted.
|
ESC16-00456
| Aging Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 3:54:02 PM | | PASS |
|
|
Demo complete. Now covered by ESC16-00365.
|
ESC16-00456
| DOC - Permit Finaled | 10/13/2016 | 10/13/2016 | 10/13/2016 3:52:30 PM | P | PASS |
|
|
|
ESC14-01083
| General Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 3:11:58 PM | P | PART |
|
|
All storm drains fitted with undamaged sediment filter bags. Trash containers provided for materials. Landsaping in progress and not stockpiling on impervious surfaces
Correction request to Erbie and Brighton Corp. - need to have crew pick up all litter and debris along the back path of units by the swale in MAW Park. Lots of litter and chunks of material in grass and swale.
- Clean up loose dust and debris on Homestretch and Front Runner
|
ESC16-01221
| Site Preparation | 10/13/2016 | 10/13/2016 | 10/13/2016 3:07:26 PM | P | PASS |
|
|
Yellow card on site Inspection requested via web by Erby Gonzales
Permit signs posted. Receiving storm drain has full capacity sediment bag. Concrete washout pan located across street. RP on site. Approved.
|
ESC16-01222
| Site Preparation | 10/13/2016 | 10/13/2016 | 10/13/2016 3:07:12 PM | P | PASS |
|
|
Yellow card on site Inspection requested via web by Erby Gonzales
Permit signs posted. Receiving storm drain has full capacity sediment bag. Concrete washout pan located across street. RP on site. Approved.
|
ESC16-01223
| Site Preparation | 10/13/2016 | 10/13/2016 | 10/13/2016 3:07:00 PM | P | PASS |
|
|
Yellow card on site Inspection requested via web by Erby Gonzales
Permit signs posted. Receiving storm drain has full capacity sediment bag. Concrete washout pan located across street. RP on site. Approved.
|
ESC16-01224
| Site Preparation | 10/13/2016 | 10/13/2016 | 10/13/2016 3:06:47 PM | P | PASS |
|
|
Yellow card on site Inspection requested via web by Erby Gonzales
Permit signs posted. Receiving storm drain has full capacity sediment bag. Concrete washout pan located across street. RP on site. Approved.
|
ESC16-00007
| DOC - Permit Finaled | 10/13/2016 | 10/13/2016 | 10/13/2016 3:04:32 PM | P | PASS |
|
|
|
ESC16-00010
| DOC - Permit Finaled | 10/13/2016 | 10/13/2016 | 10/13/2016 3:04:10 PM | P | PASS |
|
|
|
ESC16-00009
| DOC - Permit Finaled | 10/13/2016 | 10/13/2016 | 10/13/2016 3:03:51 PM | P | PASS |
|
|
|
ESC16-00004
| DOC - Permit Finaled | 10/13/2016 | 10/13/2016 | 10/13/2016 3:02:01 PM | P | PASS |
|
|
|
ESC16-00470
| Aging Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 2:46:32 PM | | PASS |
|
|
Project near completion. Exterior stabilized and cleaned. No loose dirt or materials on site. No further ESC inspection necessary; BLD still open
|
ESC16-00470
| DOC - Permit Finaled | 10/13/2016 | 10/13/2016 | 10/13/2016 2:45:39 PM | P | PASS |
|
|
|
ESC16-01310
| General Inspection | 10/4/2016 | 10/13/2016 | 10/13/2016 2:40:45 PM | P | FAIL |
|
|
WIP on foundation. Concrete truck caused some trackout and then did washout on empty lot (developer owns lot).
Corrections: - sweep sidewalk and gutter - Clea up washout pile
|
ESC15-01184
| General Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 1:26:45 PM | | PASS |
|
|
Vertical construction in progress. No trackout to 9th or River, stabilized construction entrances installed. No trash issues on 8th street, no discharges. MS4 inlets have filter bag protection. All other ESC permits for Afton have been closed and deferred to this permit.
|
ESC16-00168
| General Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 12:45:00 PM | | CANC |
|
|
|
ESC16-01072
| Random Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 12:44:43 PM | P | PASS |
|
|
WIP on frame. Vegetative strip around project area has remained intact. No trackout, sediment runoff or spills observed. Permit sign posted in alley where staging is occuring. Approved.
|
ESC16-00449
| Aging Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 12:43:32 PM | | PASS |
|
|
Construction activity complete, BLD finaled. No loose dirt or disturbed area at site. Storm gutter and ROW are clean.
|
ESC16-00449
| DOC - Permit Finaled | 10/13/2016 | 10/13/2016 | 10/13/2016 12:43:00 PM | P | PASS |
|
|
|
ESC15-00976
| General Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 12:29:49 PM | | PASS |
|
|
No activity at Idaho Street townhomes. Permits for SFHs/townhomes have been submitted to City for review. No corrections requested at this time.
|
ESC15-00745
| General Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 12:28:27 PM | A | PASS |
|
|
Permit sign and SWPPP info posted at construction entrance. Building frame has now been erected but no site improvements or landscaping. Perimeter silt fence is installed around site, no trackout or fugitive dust issues. Approved.
|
ESC16-00423
| Aging Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 12:17:24 PM | | PASS |
|
|
WIP. Exterior finish and landscaping remaining. No materials in sidewalk, gutter or street. Trash containment provided. No complaints received. Approved.
|
ESC16-00843
| General Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 10:46:55 AM | A | PASS |
|
|
WIP on foundation on Beechcraft buidling. Silt fence perimeter is installed on the north and west side of site. Receiving DI has sediment bag protection with good capacity.
RP onsite, stated today they will be installing wattle today in between the two sections of silt fence. I also requested they shovel accumulated silt trapped outside of DI bag.
No trackout, fugitive dust or discharges. Permit sign and SWPPP info posted.
|
ESC16-00349
| General Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 10:15:26 AM | | CANC |
|
|
No issues observed at Somerset Village during inspections on 10/12. No precipitation received in the meanwhile.
|
ESC15-01417
| Aging Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 10:14:25 AM | | PASS |
|
|
No disturbd area or construction activity at site. Cellular tower upgrade project complete.
|
ESC15-01417
| DOC - Permit Finaled | 10/13/2016 | 10/13/2016 | 10/13/2016 10:13:36 AM | P | PASS |
|
|
|
ESC15-00221
| DOC - Permit Finaled | 10/13/2016 | 10/13/2016 | 10/13/2016 10:03:52 AM | P | PASS |
|
|
|
ESC15-00339
| Site Final | 10/13/2016 | 10/13/2016 | 10/13/2016 9:59:29 AM | A | NR |
|
|
Construction complete pending some interior work and BLD permit requirements. Parking lot and onsite storm water system installed.
Correction request: - Remove temporary DI bag installed on MS4 on Gage Street. Correction issued to Petra
|
ESC15-00817
| General Inspection | 10/13/2016 | 10/13/2016 | 10/13/2016 8:49:22 AM | | CANC |
|
|
|