MIS19-00341
| ESC-Conference | 10/11/2019 | 10/14/2019 | 10/21/2019 3:23:51 PM | P | DONE |
|
|
follow up with EKC
|
ESC18-00435
| Aging Inspection | 10/14/2019 | 10/14/2019 | 10/17/2019 9:55:59 AM | | PASS |
|
|
|
ESC19-00398
| Complaint Inspection | 10/14/2019 | 10/14/2019 | 10/16/2019 12:36:43 PM | P | PASS |
|
|
trash?
Trash contained. WIP hauling off stockpile of unused backfill.
|
ESC18-01531
| Complaint Inspection | 10/14/2019 | 10/14/2019 | 10/16/2019 12:35:12 PM | P | PASS |
|
|
trash
Trash bin emptied. Trash across street picked up. RP is onsite supervising finishing touches. Slope behind home is to hydroseeded/taciifed tomorrow morning.
|
ESC19-00371
| Complaint Inspection | 10/14/2019 | 10/14/2019 | 10/15/2019 4:56:12 PM | A | PEND |
|
|
dust complaint on lower pond area and sewer acccess road.
Crew and drill rig has completed testing and demobilzed from site. No dust at time of inspection. The road which was formerly gravel has been disturbed and is dusty when vehicles drive over it. Need to install gravel or other stabilization method. Water truck application may also suffice. Will follow up with site to see what plan for this area is.
|
ESC19-00780
| General Inspection | 10/14/2019 | 10/14/2019 | 10/15/2019 4:34:30 PM | P | FAIL |
|
|
No ESC permit sign posted. No perimeter sediment controls on site. Loose dirt in gutter on Sherman and dirt on sidewalks.
Notified RP to schedule conference.
|
ESC18-01002
| General Inspection | 10/14/2019 | 10/14/2019 | 10/15/2019 4:22:50 PM | | CANC |
|
|
|
ESC19-00292
| Site Preparation | 10/11/2019 | 10/14/2019 | 10/15/2019 3:11:34 PM | P | PASS |
|
|
Construction entrance installed, will post permit sign on Myrtle (currently on job trailer). Will use Ecopan for concrete washout. Side walk curb and drainage of site should keep runoff retained on site. Will begin on the east building first and preserve the gravel surface on west side.
Approved for construction.
|
ESC16-00625
| General Inspection | 10/14/2019 | 10/14/2019 | 10/15/2019 11:39:58 AM | | PEND |
|
|
BLD permit appears to be expired....home is landscaped.
|
ESC19-00718
| Site Final | 10/14/2019 | 10/14/2019 | 10/14/2019 4:46:27 PM | P | NR |
|
|
dumped washout on adjacent lot (This activity was added in error so we have changed the case status back to Issued.)
|
ESC19-01432
| Site Preparation | 10/14/2019 | 10/14/2019 | 10/14/2019 4:20:27 PM | P | PASS |
|
|
Rick Phone #: ###-####
Permit posted, lined concrete washout installed, trash contained. No MS4 on street. Site has preserved grassy lot next to site. RP/GC on duty. Approved.
|
ESC19-00760
| General Inspection | 10/14/2019 | 10/14/2019 | 10/14/2019 3:47:39 PM | P | PASS |
|
|
Permit posted, no trackout or dirt leaving site, trash contained. Crew getting ready for pouring driveway. Concrete washout will need to be contained or done offsite.
|
ESC19-01221
| BMP Violation | 10/14/2019 | 10/14/2019 | 10/14/2019 3:33:54 PM | P | FAIL |
|
|
Dumped concrete washout . NO containment BMP. RAM constructionand Brooks excavation has been warned/notified about concrete washout policy.
|
ESC19-00943
| BMP Violation | 10/14/2019 | 10/14/2019 | 10/14/2019 3:31:43 PM | P | FAIL |
|
|
Two areas of dumped (unlined/uncontained) concrete washout on adjacent lot. Dumped stucco material/slurry in front of lot.
Re-inspection fee and parcel hold placed on site till washout is cleaned up. Will need washout for driveway and pathway/patio work.
Contractor has already been warned/notified about concrete washout requirements and enforcement policy.
|
ESC18-01005
| General Inspection | 10/14/2019 | 10/14/2019 | 10/14/2019 2:54:45 PM | | FAIL |
|
|
WIP on pathway along Federal Way.
Concrete washout pan is leaking all the liquid waste out onto the ground. Appears to be a pan malfunction.
Clean up and replacement is requested. Notified Warner RP Craig.
|
ESC19-00880
| General Inspection | 10/14/2019 | 10/14/2019 | 10/14/2019 2:42:36 PM | P | PASS |
|
|
Demo of tank and natural gas station is complete. Site graded and has crushed asphalt/gravel surface. Will keep permit open for monitoring for future issues if not stabilized or built upon.
|
ESC19-01125
| Site Preparation | 10/14/2019 | 10/14/2019 | 10/14/2019 2:40:03 PM | P | PASS |
|
|
ESC permit sign posted, two quality rock construction entrances, silt fence perimeter instaslled, run-on diversion berm created at southeast end of site. RP Corey on site.
Approved.
|
ESC18-01366
| Site Final | 10/11/2019 | 10/14/2019 | 10/14/2019 2:01:48 PM | A | PASS |
|
|
See subdivision permit ESC17-00895 for DI bag removal. Home complete and landscaped.
|
ESC19-00027
| Site Final | 10/14/2019 | 10/14/2019 | 10/14/2019 1:51:59 PM | P | PASS |
|
|
See subdivision permit ESC17-00895 for DI bag removal. Home complete and landscaped.
|
ESC19-00673
| Site Final | 10/14/2019 | 10/14/2019 | 10/14/2019 1:51:45 PM | P | PASS |
|
|
See subdivision permit ESC17-00895 for DI bag removal. Home complete and landscaped.
|
ESC19-00395
| Site Final | 10/14/2019 | 10/14/2019 | 10/14/2019 1:51:12 PM | P | PASS |
|
|
See subdivision permit ESC17-00895 for DI bag removal. Home complete and landscaped.
|
ESC19-00393
| Site Final | 10/14/2019 | 10/14/2019 | 10/14/2019 1:50:57 PM | P | PASS |
|
|
See subdivision permit ESC17-00895 for DI bag removal. Home complete and landscaped.
|
ESC19-00392
| Site Final | 10/14/2019 | 10/14/2019 | 10/14/2019 1:50:43 PM | P | PASS |
|
|
See subdivision permit ESC17-00895 for DI bag removal. Home complete and landscaped.
|
ESC19-00314
| Site Final | 10/14/2019 | 10/14/2019 | 10/14/2019 1:50:26 PM | P | PASS |
|
|
See subdivision permit ESC17-00895 for DI bag removal. Home complete and landscaped.
|
ESC19-00323
| Site Final | 10/14/2019 | 10/14/2019 | 10/14/2019 1:50:11 PM | P | PASS |
|
|
See subdivision permit ESC17-00895 for DI bag removal. Home complete and landscaped.
|
ESC19-00326
| Site Final | 10/14/2019 | 10/14/2019 | 10/14/2019 1:49:56 PM | P | PASS |
|
|
See subdivision permit ESC17-00895 for DI bag removal. Home complete and landscaped.
|
ESC19-00325
| Site Final | 10/14/2019 | 10/14/2019 | 10/14/2019 1:49:43 PM | P | PASS |
|
|
See subdivision permit ESC17-00895 for DI bag removal. Home complete and landscaped.
|
ESC19-00550
| Site Final | 10/14/2019 | 10/14/2019 | 10/14/2019 1:38:43 PM | P | PASS |
|
|
Carports complete. ESC permit for main site open for DI bag removal on Hudson and Federal Way.
|
ESC19-00771
| General Inspection | 10/14/2019 | 10/14/2019 | 10/14/2019 1:38:04 PM | P | PASS |
|
|
No dirt leaving site. Not stabilzed, could become a muddy lot in winter if not managed or stabilzed. Will continue to monitor. No corrections requested at this time.
|
ESC18-00778
| General Inspection | 10/14/2019 | 10/14/2019 | 10/14/2019 1:22:46 PM | | PASS |
|
|
Work confined to basement. Some minor excavation and stagin in alley. No corrections at this time.
|
ESC17-00925
| Aging Inspection | 10/14/2019 | 10/14/2019 | 10/14/2019 8:06:42 AM | | CANC |
|
|
|