Inspections for the day of: Monday, October 16, 2017.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-01446 General Inspection10/16/201710/16/201710/23/2017 8:00:11 AM CANC
ESC16-00935 BMP Violation10/16/201710/16/201710/19/2017 11:30:15 AMPPEND
crew has cleaned up uncontained washout per RP Cleve. Road also being swept on 10/18. Will follow up at site and post new ESC permits.

Earthwork to occur this week and next and schedule is set to have erosion control blankets installed within 2-3 weeks.
ESC16-00936 BMP Violation10/16/201710/16/201710/19/2017 11:30:06 AMPPEND
crew has cleaned up uncontained washout per RP Cleve. Road also being swept on 10/18. Will follow up at site and post new ESC permits.

Earthwork to occur this week and next and schedule is set to have erosion control blankets installed within 2-3 weeks.
ESC16-00691 Aging Inspection10/16/201710/16/201710/18/2017 11:03:23 AM CANC
ESC15-00863 Aging Inspection10/16/201710/16/201710/18/2017 11:03:13 AM CANC
ESC16-01434 General Inspection10/16/201710/16/201710/18/2017 11:03:05 AM CANC
ESC12-00403 General Inspection10/16/201710/16/201710/18/2017 11:02:58 AM CANC
ESC17-00954 Conference10/16/201710/16/201710/16/2017 5:04:22 PMPPEND
Construction entrance installed last week. Further earthwork to resume as well as utilities.

Notified RP of stabilization requirements.
ESC16-01494 General Inspection10/16/201710/16/201710/16/2017 12:49:09 PM CANC
ESC17-01003 Site Preparation10/16/201710/16/201710/16/2017 12:41:32 PMPPASS
Rick ###-####

Onsite pre-construction conference. Subdivision has designated lined washout and storm drain inlet protection already installed.

Work to begin Wednesday, excavator to install rock construction entrance and perimeter wattle. Reviewed regular housekeeping, dust control, and trash containment rules.

Approved for construction
ESC16-01213 Conference10/13/201710/16/201710/16/2017 11:58:59 AMPDONE
tell Herb to get DI bags

sent email and left VM. Will check back in 2 weeks. If no action, issue re-inspection fee.
ESC16-01457 General Inspection10/16/201710/16/201710/16/2017 10:11:20 AM PEND
no final stabilization of driveway yet. Temporary slope drain installed. No recent activity by parcel owner. Need to assess runoff issues & other permits for driveway.
ESC16-01232 Site Preparation10/13/201710/16/201710/16/2017 10:06:01 AMAPEND
9:30 Am
Mark Berkley Builders ###-####

Permit sign posted, no trackout/discharges; trash container onsite and trash picked up.

Corrections:
- re-install silt fence properly at bottom of lot at Shaw Mountain.
- install slope interupting wattles (two rows) along south side of house.
*check out retaining wall/stair project next door (656 San Felipe)

Will check back in one week (silt fence should be installed )
ESC16-00843 General Inspection10/16/201710/16/201710/16/2017 8:24:05 AM CANC