Inspections for the day of: Friday, October 18, 2019.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-01129 Site Preparation10/18/201910/18/201910/22/2019 1:17:17 PMPPASS
Wes Phone #: ###-####

No construction yet. Open pad, previously developed. Need to protect any private storm drains in Pad Thai parking lot. Subdivsion drains on Goldking have sediment protection installed.
ESC19-01166 BMP Violation10/18/201910/18/201910/18/2019 1:42:27 PMPFAIL
Uncontained concrete washout occuring at this site.

Correction:
- install concrete washout by Monday
- site inspection with Inspector on Monday PM.

Caught by BLD inspector
ESC18-01597 General Inspection10/18/201910/18/201910/18/2019 12:40:11 PM CANC
ESC18-01167 Conference10/17/201910/18/201910/18/2019 12:39:20 PMAPASS
WIP on parking garage, the lowest two level have been constructed. Site is excavated around structure with new work occuring on Jefferson to connect the hospital and future shipping and receiving. Stormwater from around perimeter . No trackout from site. Ecopan washouts being used.

Correction:
- keep updated SWPPP inspection reports in binder

ESC18-01168 Conference10/17/201910/18/201910/18/2019 12:33:16 PMAPASS
11 am charlie

No trackout, discharges, or other violations observed. SWPPP onsite and site inspections are every 2 weeks and after rain events.

Site walk around and inspection with SWPPP coordinator Charlie of the 3 St. Luke's project. Site stormwater is retained on site, existing DIs are disconnected and or flow into the excavation of the site. Ecopan concrete washouts are utilizied and in good condition.

Jefferson Street to the north of project will soon be demolished/excavated. Streets directs stormwater into site.

Corrections:
- install gravel/road mix on loading areas and temporary parking spots around perimeter (bannock & 2nd)
- re-grade corner access and stabilize
- need to reinstall wattle along the stockpile/backfill piled up along Bannock. Wattle should be installed at toe of slope, be trenched in 2-3" and staked every 4-5 ft.
- make sure inspection records are up to date. An inspection form should be in binder within 1 week of the inspection date.

Notified Charlie of requests.

ESC18-01620 General Inspection10/18/201910/18/201910/18/2019 8:30:48 AM CANC
ESC18-00956 General Inspection10/18/201910/18/201910/18/2019 8:29:01 AM CANC
ESC18-01471 Aging Inspection10/18/201910/18/201910/18/2019 8:24:32 AM CANC
ESC18-01471 DOC - Permit Finaled10/18/201910/18/201910/18/2019 8:24:27 AMPPASS
ESC18-00358 General Inspection10/18/201910/18/201910/18/2019 8:23:55 AM CANC