Inspections for the day of: Thursday, October 2, 2014.
Number of inspections: 21
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00547 General Inspection10/2/201410/2/201410/2/2014 2:35:31 PM PASS
ESC14-00414 Tracking Control10/2/201410/2/201410/2/2014 2:30:03 PMPPASS
Trackout observed during the backfilling and haul off phase has been swept up. Some dirt remains on sidewalk, but site is performing regular sweeping/clean up duties. No corrections necessary.
ESC14-00526 General Inspection10/2/201410/2/201410/2/2014 2:21:32 PM PASS
No activity at time of inspection but Ore-Pac project is still in progress. DI on Federal Way is protected. SWPPP and permit are posted. Approved.
ESC14-00468 DOC - Permit Finaled10/2/201410/2/201410/2/2014 2:13:37 PMPPASS
Home complete and landscaped. BLD finaled, ESC permit conditions satisfied.
ESC14-00806 Random Inspection10/2/201410/2/201410/2/2014 2:11:05 PMPPASS
Harding home projects in Abode Sub are in good conditions. DI inlet have remaining filter bag capacity. No trackout or uncontained washout observed. Approved.
ESC14-00382 DOC - Permit Finaled10/2/201410/2/201410/2/2014 2:09:34 PMPPASS
House complete, BLD finaled. ESC conditions satisfied.
ESC14-00056 Aging Inspection10/2/201410/2/201410/2/2014 2:06:12 PM PASS
Home in Abode sub is complete, landscaped and occupied. Work is ongoing on adajacent homes so no need to remove temporary BMPs. No violations on other Harding Home projects in subdivision. ESC conditions satisfied.
ESC14-00056 DOC - Permit Finaled10/2/201410/2/201410/2/2014 2:04:59 PMPPASS
ESC14-00139 Aging Inspection10/2/201410/2/201410/2/2014 12:04:45 PM PASS
Finaled.
ESC14-00139 DOC - Permit Finaled10/2/201410/2/201410/2/2014 12:04:29 PMPPASS
Project complete. All disturbed areas stabilzed. ESC conditions satisfied.
ESC14-00657 Random Inspection10/2/201410/2/201410/2/2014 11:44:08 AMPPASS
Grading at RH #6 has been done in such a way that stormwater from upper portion of site is contained by a berm to prevent discharge to Warm Springs.

Construction entrance installed and in use, silt fence along areas of potential runoff on Warm Springs. Permit and SWPPP info clearly posted. Approved.
ESC14-00092 Aging Inspection10/2/201410/2/201410/2/2014 11:38:57 AM PASS
Home complete, landscaped/stabilized, and occupied. Ground FX fixed erosion issue behind the home. ESC conditions satisfied.
ESC14-00092 DOC - Permit Finaled10/2/201410/2/201410/2/2014 11:38:11 AMPPASS
ESC13-01159 Random Inspection10/2/201410/2/201410/2/2014 10:45:16 AMPPASS
Peppermill in good condition. Some minor tracking with neigborhood due to work on the infiltration swales. No sediment runoff issues evident from the recent rain events. No corrections necessary, site is in good condition. No activity at time of inspection.
ESC14-00200 Random Inspection10/2/201410/2/201410/2/2014 10:33:58 AMAPASS
No trackout or dust issues observed at Involta Data Center site. Permits are posted, utility trench is in progress along the future entrance/construction access. Soon it will be paved, if not new rock will be required.

No corrections at this time.
ESC14-00530 General Inspection10/2/201410/2/201410/2/2014 10:22:21 AM PASS
ESI project with 3 buildings on one large parcel off Victory is in progress with foundations just starting to be poured.

RP/Project Super Kevin is onsite with SWPPP. SWPPP site map has been updated with new inlet protection on Victory for offsite utility/water work to connect the site.

New heavy grade rock provided for entrance is keeping trackout in control. Irrigation drain work is complete and culverts installed. No flow at time of inspection.

Permit posted. Approved.
ESC14-00529 General Inspection10/2/201410/2/201410/2/2014 10:22:06 AM PASS
ESI project with 3 buildings on one large parcel off Victory is in progress with foundations just starting to be poured.

RP/Project Super Kevin is onsite with SWPPP. SWPPP site map has been updated with new inlet protection on Victory for offsite utility/water work to connect the site.

New heavy grade rock provided for entrance is keeping trackout in control. Irrigation drain work is complete and culverts installed. No flow at time of inspection.

Permit posted. Approved.
ESC14-00528 General Inspection10/2/201410/2/201410/2/2014 10:21:48 AM PASS
ESI project with 3 buildings on one large parcel off Victory is in progress with foundations just starting to be poured.

RP/Project Super Kevin is onsite with SWPPP. SWPPP site map has been updated with new inlet protection on Victory for offsite utility/water work to connect the site.

New heavy grade rock provided for entrance is keeping trackout in control. Irrigation drain work is complete and culverts installed. No flow at time of inspection.

Permit posted. Approved.
ESC13-00449 Tracking Control10/2/201410/2/201410/2/2014 10:08:24 AMPPASS
Trackout issue on Phillipi and Malad has been resolved by repeated sweeping. No new trackout.

Site is well contained, Ecopan washout being used for the light post foundatins. No dust or discharges observed.
ESC14-00128 Aging Inspection10/2/201410/2/201410/2/2014 9:34:57 AM PASS
Landscaping materials, stockpiles of vegetated dirt, and some cement chunks are on the parcel. Landscaping is being controlled by the HOA not Prestige Homes.

Materials are stored on flat lot well away from road and stormwater conveyances. Will continue to monitor for issues, but lots will soon be cleared for building and landscapers will collect their items.
ESC13-01178 Aging Inspection10/2/201410/2/201410/2/2014 8:33:23 AM PASS
Utilitiy trench has been dug through berm and parking lot of River Valley Church. Stockpiles is being kept in center of parking lot which retains stormwater onsite. Parking lot DI has protection. No trackout or other issues. Approved.