ESC15-00556
| Site Final | 10/2/2018 | 10/2/2018 | 10/9/2018 12:41:27 PM | P | NR |
|
|
DI bags still installed @ Taboo. WIP on homes on Highland Valley.
|
ESC17-00837
| General Inspection | 10/2/2018 | 10/2/2018 | 10/3/2018 2:43:04 PM | | PASS |
|
|
Home complete and landscaped. BLD still open. Wattles installed below disturbed area above and below home. NO discharges or sediment runoff. Approved.
|
ESC14-01063
| General Inspection | 10/2/2018 | 10/2/2018 | 10/3/2018 2:12:10 PM | | PASS |
|
|
WIP on HOA hillside path. All parcels on Goshawk are now occupied. Cement washout has been removed and cleaned up, storm drains stilll have sediment filter bags installed.
|
ESC17-01125
| General Inspection | 10/2/2018 | 10/2/2018 | 10/3/2018 2:08:13 PM | | PASS |
|
|
Home is complete and landscaped. Portion of yard has been hydroseeded but is not yet established. DI bag left in inlet just below home. Will need to remove, will request next inspection. No corrections at this time.
|
ESC18-00107
| General Inspection | 10/2/2018 | 10/2/2018 | 10/2/2018 3:36:50 PM | P | FAIL |
|
|
Home near completion, yard not yet landscaped. No hillside erosion issues.
Corrections needed:
Loose dirt and debris on sidewalk and in culdesdac in front of home, some with potential to flow directly to storm drain. No storm drain sediment protection installed. Unlined concrete washout used, not per ESC plan construction details. Washouts should be lined leakproof containers.
|
ESC18-00845
| General Inspection | 10/2/2018 | 10/2/2018 | 10/2/2018 3:26:59 PM | P | FAIL |
|
|
Corrections needed:
- no construction entrance, trackout across sidewalk and in gutter of culdesac. Need to sweep up sidewalk and gutter. - forklift leaked oil in various spots of culdesac. Absorbent should be applied on any wet spots. - trash has either been blown or thrown down into vegetation below homesite. Needs to be picked up.
|
ESC18-01266
| BMP Violation | 10/2/2018 | 10/2/2018 | 10/2/2018 1:48:07 PM | P | FAIL |
|
|
Corrections needed: - provide trash container for loose trash pile - protect storm drain in front of home on Emerald - be prepared to prevent and/or clean up trackout after wet weather due to current parking access - post ESC permit sign in visible spot
|
ESC18-00027
| Site Final | 10/2/2018 | 10/2/2018 | 10/2/2018 12:33:22 PM | P | NR |
|
|
need to pick up trash. Install wattle and/or berm on lots adjacent to Warm Springs creek
|
ESC18-00179
| General Inspection | 10/2/2018 | 10/2/2018 | 10/2/2018 12:22:02 PM | P | PART |
|
|
Grading, road, and infrastructure installed. No SFHs in progress yet. Need to landscape sidewalk medians. May need to install additional perimeter controls on south side of blocks to prevent turbid sheet flow to storm drains in the alleys.
Correction needed: - install sediment protection on alley way storm drains - pick up trash is Warm Springs creek north of Parkcenter BLVD
|
ESC18-00177
| General Inspection | 10/2/2018 | 10/2/2018 | 10/2/2018 12:08:09 PM | P | PASS |
|
|
WIP on foundations and some framing. Trash contained. Storm drains fitted with DI bags, lined concrete washout is onsite.
|
ESC17-01002
| Complaint Inspection | 10/2/2018 | 10/2/2018 | 10/2/2018 11:56:03 AM | A | PEND |
|
|
potential dewatering of turbid water reported.
No turbid water discharge occuring at time of inspection. Settling structure constrcuted but full of turbid water and is not discharging. Submersible portable pump is placed perforated pipe and is discharging clear water to bank side vegetation intermittingly.
Reviewed dewatering requirements with homowner/GC Rick and Premier Pools project manager Scott. Explained receiving water is Logger's Creek and returns to Boise River downstream. No visible plume in receiving water is allowed.
Will construct new settling trench and allow infiltration and settling with outfall to existing grass and vegetation.
Follow up inspection scheduled for tomorrow AM.
|
ESC18-01360
| Complaint Inspection | 10/2/2018 | 10/2/2018 | 10/2/2018 11:55:51 AM | A | PEND |
|
|
potential dewatering of turbid water reported.
No turbid water discharge occuring at time of inspection. Settling structure constrcuted but full of turbid water and is not discharging. Submersible portable pump is placed perforated pipe and is discharging clear water to bank side vegetation intermittingly.
Reviewed dewatering requirements with homowner/GC Rick and Premier Pools project manager Scott. Explained receiving water is Logger's Creek and returns to Boise River downstream. No visible plume in receiving water is allowed.
Will construct new settling trench and allow infiltration and settling with outfall to existing grass and vegetation.
Follow up inspection scheduled for tomorrow AM.
|
ESC15-01579
| Site Final | 10/1/2018 | 10/2/2018 | 10/2/2018 11:45:19 AM | A | NR |
|
|
Pile of wattles and silt fence from project left in bushes behind Barber lift station. Final request t remove issued to Brighton Corp.
|
ESC15-00556
| General Inspection | 10/2/2018 | 10/2/2018 | 10/2/2018 9:53:35 AM | | PEND |
|
|
will check for DI bag removal
|