ESC16-00871
| BMP Violation | 10/18/2016 | 10/20/2016 | 10/21/2016 11:23:49 AM | P | PART |
|
|
All trash has been picked up at both sites. No new trackout or issues.
Corrections not complete: - sweep sidewalk and gutter.
|
ESC16-00774
| BMP Violation | 10/18/2016 | 10/20/2016 | 10/21/2016 11:18:17 AM | P | PEND |
|
|
Meet RP contact BIll onsite. Trackout from earlier in the week was swept. Driveway to be poured beginning of week and employees have been told to stay off open dirt.
Some minor trackout and loose sediment remains on street and gutter, Bill stated he will sweep up and that all trash in the full container is scheduled to be hauled away.
Corrections in progress, RP working on full compliance. No new corrections.
|
ESC16-00744
| General Inspection | 10/12/2016 | 10/20/2016 | 10/21/2016 9:47:19 AM | P | PASS |
|
|
Permit sign posted on chain link fence. Entrance to work area is paved. No trackout to Targee, disturbance within self contained industrial yard, wattles on site for stockpile control. No corrections requested
|
ESC16-00696
| Site Preparation | 10/20/2016 | 10/20/2016 | 10/20/2016 2:44:13 PM | P | PASS |
|
|
Colby Phone #: ###-####
Dropzone apartment grading and initial excavation conductied under main site permit ESC16-00696
Four 8-plex apartment buildings to be erected. Site access and parking not yet paved. Asphalt scheduled for 2nd week of November.
Reviewed ESC conditions with RP Colby, requested 4 or more trash containment bins and designated scrap wood and material staging zone with stabilized entrance. Surrounding storm drains have sediment filter bags installed for Dropzone Sub SFHs by CBH
Foundation construciton and vertical construction to start on Monday. Follow up inspection for construction entrance and washout facility on Monday 10/24 PM
|
ESC16-00698
| Site Preparation | 10/20/2016 | 10/20/2016 | 10/20/2016 2:43:56 PM | P | PART |
|
|
Colby Phone #: ###-####
Dropzone apartment grading and initial excavation conductied under main site permit ESC16-00696
Four 8-plex apartment buildings to be erected. Site access and parking not yet paved. Asphalt scheduled for 2nd week of November.
Reviewed ESC conditions with RP Colby, requested 4 or more trash containment bins and designated scrap wood and material staging zone with stabilized entrance. Surrounding storm drains have sediment filter bags installed for Dropzone Sub SFHs by CBH
Foundation construciton and vertical construction to start on Monday. Follow up inspection for construction entrance and washout facility on Monday 10/24 PM
|
ESC16-00699
| Site Preparation | 10/20/2016 | 10/20/2016 | 10/20/2016 2:43:43 PM | P | PASS |
|
|
Colby Phone #: ###-####
Dropzone apartment grading and initial excavation conductied under main site permit ESC16-00696
Four 8-plex apartment buildings to be erected. Site access and parking not yet paved. Asphalt scheduled for 2nd week of November.
Reviewed ESC conditions with RP Colby, requested 4 or more trash containment bins and designated scrap wood and material staging zone with stabilized entrance. Surrounding storm drains have sediment filter bags installed for Dropzone Sub SFHs by CBH
Foundation construciton and vertical construction to start on Monday. Follow up inspection for construction entrance and washout facility on Monday 10/24 PM
|
ESC16-00697
| Site Preparation | 10/20/2016 | 10/20/2016 | 10/20/2016 2:43:31 PM | P | PASS |
|
|
Colby Phone #: ###-####
Dropzone apartment grading and initial excavation conductied under main site permit ESC16-00696
Four 8-plex apartment buildings to be erected. Site access and parking not yet paved. Asphalt scheduled for 2nd week of November.
Reviewed ESC conditions with RP Colby, requested 4 or more trash containment bins and designated scrap wood and material staging zone with stabilized entrance. Surrounding storm drains have sediment filter bags installed for Dropzone Sub SFHs by CBH
Foundation construciton and vertical construction to start on Monday. Follow up inspection for construction entrance and washout facility on Monday 10/24 PM
|
ESC16-01400
| Site Preparation | 10/19/2016 | 10/20/2016 | 10/20/2016 2:08:27 PM | P | PASS |
|
|
Jason Phone #: ###-####
Low risk project with long gravel access to location of new garage. No MS4 protection required. Main BMP is housekeeping and permit signage. Approved.
|
ESC16-00414
| General Inspection | 10/20/2016 | 10/20/2016 | 10/20/2016 1:18:02 PM | | CANC |
|
|
|
ESC16-00500
| Aging Inspection | 10/20/2016 | 10/20/2016 | 10/20/2016 1:10:42 PM | | PASS |
|
|
|
ESC16-00495
| Aging Inspection | 10/20/2016 | 10/20/2016 | 10/20/2016 12:29:17 PM | | PASS |
|
|
Construction complete, BLD finaled. No disturbed area or loose materials on or around site. ESC conditions satisfied.
|
ESC16-00495
| DOC - Permit Finaled | 10/20/2016 | 10/20/2016 | 10/20/2016 12:28:30 PM | P | PASS |
|
|
|
ESC16-00288
| General Inspection | 10/20/2016 | 10/20/2016 | 10/20/2016 12:13:02 PM | | PASS |
|
|
WIP on foundation and backfill. Perimeter wattle installed, permit sign posted, MS4 inlet protection. Site was shut down during rains earlier in the week to prevent trackout and other isssues.
|
ESC15-01579
| General Inspection | 10/20/2016 | 10/20/2016 | 10/20/2016 11:52:21 AM | P | PASS |
|
|
Vertical construction in progress at Arboretum project. 3 seperate buildings with 3 ESC permits, and the main site ESC permit issued for grading and utilitiy installation. See ESC16-00435, 436, 437.
Silt fence perimeter is in tact, no breaches or sediment runoff to Greenbelt path. No trackout from site, designated parking for the 60+ employees is across street to limit traffic. MS4 inlets on both sides of road have filter bags installed with good capacity remaining. Trash and materials contained on site. Concrete washout bins in several locations provided.
Observed pollution prevention on site with secondary containment storage for concrete form oils, diesal gas containers, and spill pans under neath porta-pots.
Approved.
|
ESC16-00447
| Aging Inspection | 10/20/2016 | 10/20/2016 | 10/20/2016 11:49:31 AM | | CANC |
|
|
rescheduled for site final
|
ESC16-00437
| General Inspection | 10/20/2016 | 10/20/2016 | 10/20/2016 11:47:05 AM | | PASS |
|
|
Vertical construction in progress at Arboretum project. 3 seperate buildings with 3 ESC permits, and one main site ESC permit issued for grading and utilitiy installation, see ESC15-01579.
Silt fence perimeter is in tact, no breaches or sediment runoff to Greenbelt path. No trackout from site, designated parking for the 60+ employees is across street to limit traffic. MS4 inlets on both sides of road have filter bags installed with good capacity remaining. Trash and materials contained on site. Concrete washout bins in several locations provided.
Observed pollution prevention on site with secondary containment storage for concrete form oils, diesal gas containers, and spill pans under neath porta-pots.
Approved.
|
ESC16-00436
| General Inspection | 10/20/2016 | 10/20/2016 | 10/20/2016 11:46:45 AM | | PASS |
|
|
Vertical construction in progress at Arboretum project. 3 seperate buildings with 3 ESC permits, and one main site ESC permit issued for grading and utilitiy installation, see ESC15-01579.
Silt fence perimeter is in tact, no breaches or sediment runoff to Greenbelt path. No trackout from site, designated parking for the 60+ employees is across street to limit traffic. MS4 inlets on both sides of road have filter bags installed with good capacity remaining. Trash and materials contained on site. Concrete washout bins in several locations provided.
Observed pollution prevention on site with secondary containment storage for concrete form oils, diesal gas containers, and spill pans under neath porta-pots.
Approved.
|
ESC16-00435
| General Inspection | 10/20/2016 | 10/20/2016 | 10/20/2016 11:46:31 AM | | PASS |
|
|
Vertical construction in progress at Arboretum project. 3 seperate buildings with 3 ESC permits, and one main site ESC permit issued for grading and utilitiy installation, see ESC15-01579.
Silt fence perimeter is in tact, no breaches or sediment runoff to Greenbelt path. No trackout from site, designated parking for the 60+ employees is across street to limit traffic. MS4 inlets on both sides of road have filter bags installed with good capacity remaining. Trash and materials contained on site. Concrete washout bins in several locations provided.
Observed pollution prevention on site with secondary containment storage for concrete form oils, diesal gas containers, and spill pans under neath porta-pots.
Approved.
|
ESC15-01288
| Random Inspection | 10/20/2016 | 10/20/2016 | 10/20/2016 11:19:38 AM | P | PEND |
|
|
Concentrated flow in RH#7 has caused some erosion along Warm Springs road within the drainage route and below road shoulder . No offisite discharges or sheet flow of muddy water into storm water system observed; water flowing in drainage collects in large infiltration depression.
10/19 inspection report in SWPPP. No mention of erosion or stabilization /revegetation schedule.
Discussed with RP, stated issue was not observed during inspection and could have been potentially caused from fire flow activity (fire hydrant water pressure testing) discharge. Stated Syman has not yet installed geotextile matting and other channel stabilization methods.
Awaiting report from Brighton inspector Zach
|
ESC16-00496
| Aging Inspection | 10/20/2016 | 10/20/2016 | 10/20/2016 10:36:09 AM | | CANC |
|
|
|
ESC16-00496
| DOC - Permit Finaled | 10/20/2016 | 10/20/2016 | 10/20/2016 10:36:04 AM | P | PASS |
|
|
|
ESC16-00439
| General Inspection | 10/20/2016 | 10/20/2016 | 10/20/2016 10:31:26 AM | | CANC |
|
|
rescheduled 10/21
|
ESC16-00110
| DOC - Permit Finaled | 10/20/2016 | 10/20/2016 | 10/20/2016 10:24:39 AM | P | PASS |
|
|
Home complete, landscaped, and ready to be occupied. Temp BMPs in East Valley to remain installed during active SFH construction on Ghost Bar.
|
ESC16-00111
| DOC - Permit Finaled | 10/20/2016 | 10/20/2016 | 10/20/2016 10:24:30 AM | P | PASS |
|
|
Home complete, landscaped, and ready to be occupied. Temp BMPs in East Valley to remain installed during active SFH construction on Ghost Bar.
|
ESC16-00119
| DOC - Permit Finaled | 10/20/2016 | 10/20/2016 | 10/20/2016 10:24:12 AM | P | PASS |
|
|
Home complete, landscaped, and ready to be occupied. Temp BMPs in East Valley to remain installed during active SFH construction on Ghost Bar.
|
ESC16-00262
| DOC - Permit Finaled | 10/20/2016 | 10/20/2016 | 10/20/2016 10:16:14 AM | P | PASS |
|
|
Home complete, landscaped, and is being used as a model home. Temp BMPs in East Valley to remain installed during active SFH construction on Ghost Bar.
|
ESC13-01279
| General Inspection | 10/20/2016 | 10/20/2016 | 10/20/2016 10:09:04 AM | | PASS |
|
|
WIP on central area townhomes at Harris Crossing. BMPs installed including concrete washout container, adequate trash containment for multiple units, DI protection, silt fence along downslope end of site near power lines and Eckart, and periodic street sweeping.
No trackout to roads, no sediment or mud in gutters.
Correction request/notification concrete washout is over 50% full and a service call should be made
|
ESC16-01396
| Site Preparation | 10/19/2016 | 10/20/2016 | 10/20/2016 9:27:53 AM | A | PASS |
|
|
Project has started. I will be out of town but call me if you have any problems. Phone #: ###-#### Inspection requested via web by Eldon Oyadomari
Permit sign posted. Direct bury of underground powerline in progress at Kendall Center. Dump truck on site next to digging to contain dirt. No trackout from work area or discharges. Approved.
|
ESC16-00276
| General Inspection | 10/20/2016 | 10/20/2016 | 10/20/2016 8:29:21 AM | | CANC |
|
|
rescheduled 10/21
|
ESC16-00427
| General Inspection | 10/20/2016 | 10/20/2016 | 10/20/2016 8:27:19 AM | | CANC |
|
|
|