ESC15-00094
| General Inspection | 10/21/2016 | 10/21/2016 | 10/24/2016 12:48:51 PM | | PASS |
|
|
|
ESC16-00439
| General Inspection | 10/20/2016 | 10/21/2016 | 10/24/2016 11:09:27 AM | A | CANC |
|
|
|
ESC16-00941
| General Inspection | 10/21/2016 | 10/21/2016 | 10/24/2016 8:44:37 AM | P | CANC |
|
|
see 10/24
|
ESC15-01629
| General Inspection | 10/21/2016 | 10/21/2016 | 10/24/2016 8:05:17 AM | | CANC |
|
|
|
ESC13-00707
| General Inspection | 10/21/2016 | 10/21/2016 | 10/24/2016 8:05:09 AM | | CANC |
|
|
|
ESC15-01579
| Tracking Control | 10/21/2016 | 10/21/2016 | 10/21/2016 2:27:13 PM | P | PEND |
|
|
RP called to notify that they have ordered a street sweeper to clean up the trackout to Parkcenter. DI bags have filter bags installed and were in good condition on 10/20
Will check conditions on Monday.
|
ESC15-01004
| Random Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 2:06:02 PM | P | FAIL |
|
|
Uncontained masonry cement mix station next to gutter. Gutter has dirt, mud, and cementitious materials. MS4 inlet does have filter inlet bag; concete washout bins are being utilized.
Onsite inspection and verbal correction request to RP Jim: - clean up gutter, sweep staging lane within fence - install checkdam sand bags to trap materials on the surface for easy maintenance. - coir mat filter on top of inlet in additon to filter bag could add protection. - increase sweepig of the area to 3-4 x a week Jim agreed and started getting crew to make corrections and clean. Will re-inspect early next week
|
ESC15-01552
| General Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 1:43:22 PM | | PASS |
|
|
WIP on interior. Parking lot and drainage complete. No discharges or trackout.
|
ESC14-00983
| General Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 1:15:35 PM | | PASS |
|
|
WIP on interior of west building. No trackout or discharges observed. Trash is contained and parking lot is relatively clean. Approved
|
ESC16-00343
| Site Final | 10/14/2016 | 10/21/2016 | 10/21/2016 12:50:14 PM | P | PEND |
|
|
Home is complete, landscaped and occupied. BLD finaled.
Will leave permit open to monitor the erosion rill forming on the recently hydroseeed slope uphill from home . Runoff from empty parcel currently draining to this area. Working with CC Homes, developer and lot owner to remedy situation.
|
ESC15-01161
| Site Final | 10/14/2016 | 10/21/2016 | 10/21/2016 12:46:36 PM | P | PASS |
|
|
Construction complete, home is lanscaped and loose materials around site have been cleaned. No erosion issues on bank below home observed. ESC conditions satisfied.
|
ESC16-00276
| General Inspection | 10/20/2016 | 10/21/2016 | 10/21/2016 12:40:22 PM | P | CANC |
|
|
|
ESC16-00527
| Aging Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 12:24:18 PM | | PASS |
|
|
Pool installed, work complete and site cleaned/stabilized. No ESC corrections needed.
|
ESC16-00527
| DOC - Permit Finaled | 10/21/2016 | 10/21/2016 | 10/21/2016 12:23:40 PM | P | PASS |
|
|
|
ESC16-00314
| Aging Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 12:00:13 PM | | PASS |
|
|
Home complete, landscaped, and occupied. No disturbed area or construction materials remaining on site. No temp BMP removal
|
ESC16-00313
| Aging Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 11:59:57 AM | | PASS |
|
|
Home complete, landscaped, and occupied. No disturbed area or construction materials remaining on site. No temp BMP removal
|
ESC16-00313
| DOC - Permit Finaled | 10/21/2016 | 10/21/2016 | 10/21/2016 11:59:17 AM | P | PASS |
|
|
|
ESC16-00156
| General Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 11:05:54 AM | P | PART |
|
|
SFHs in progress. Silt fence installed, sediment filter bags. Individual homes permitted seperately by CBH.
Correction request: - pick up windblown trash from construction activity along the 8 mile creek path and silt fence.
Note: Peppermill phase #1 ESC permit ESC13-01159 has been finaled.
|
ESC13-01159
| Site Final | 10/21/2016 | 10/21/2016 | 10/21/2016 11:03:43 AM | A | PASS |
|
|
CBH occupied or active on all Peppermill Estates phase one lots. Storm water retention/infiltration pond is established and draining well. CBH to remove all DI bags upon completion of active SFHs.
No further inspections on this permit. Silt fence and other final corrections/requests to be covered under phase II permit, see ESC16-00156
|
ESC16-00520
| Aging Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 10:48:50 AM | | CANC |
|
|
|
ESC16-01219
| Site Preparation | 10/20/2016 | 10/21/2016 | 10/21/2016 10:47:37 AM | A | PART |
|
|
Brett Phone #: ###-####
Permit sign posted, lined washout facility provided for Peppermill SFHs (all by CBH). Storm drains have sediment protection. Approved for construction.
Verbal Correction Request to Brett with CBH: - have crew walk length of 8 mile creek/ditch path and pick up windblown construction and employee trash that has accumulated along the silt fence and bank vegetation. He agreed and will have crew pick up trash next week. Will check next Friday. Brett said it shall be done.
|
ESC16-00427
| General Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 10:33:52 AM | A | PART |
|
|
Pedestrian bridge is installed and open for use. Pathways connecting Peppermill to Peconic & Gatewood is complete and shoulders have been hydromulched. Silt fence perimeter is still installed along 8 mile creek, which is no longer carrrying irriagtion water. New grass swale is established and perimeter control removed.
Correction request to developer and CBH - pick up windblown trash from construction sites and activity along the creek bank and silt fence.
|
ESC16-00879
| General Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 10:21:14 AM | A | PART |
|
|
Permit sign posted, road widening of Mitchell in progress as well as prep for concrete curbing and connection to storm water facilities.. MS4 on Victory has sediment filter bag installed a. No trackout to Victory or sediment runoff to sidewalk. No fugitive dust observed, water truck onsite.
Due to activity, construction entrance is not in good condition and there is trackout to Mitchell on the south entrance.
Verbal Correction Request to RP-developer Scott to ensure that crews sweep up all trackout to Mitchell to prevent muddy water on road and as courtesy to neighbors south of project. RP agreed to request and stated he will make sure it is swept.
|
ESC15-00031
| General Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 10:01:58 AM | | CANC |
|
|
|
ESC15-00955
| General Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 10:01:39 AM | | PASS |
|
|
Molenaar Park is near completion. Final landscaping and some site work remains. Parking lot is finished and permeable asphalt is installed. No mud or dirt stockpiles in drainage area.
Open space has been planted with grass and trees planted. Permit and SWPPP info posted at entrance. No violations observed.
|
ESC16-01119
| Site Preparation | 10/20/2016 | 10/21/2016 | 10/21/2016 9:09:12 AM | A | PASS |
|
|
Clint Phone #: ###-####
Subdivision BMPs installed. Active projects in compliance. Approved
|
ESC16-00284
| Aging Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 8:08:37 AM | | CANC |
|
|
rescheduled for site final
|
ESC16-00329
| General Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 8:07:36 AM | | CANC |
|
|
|
ESC15-01091
| General Inspection | 10/21/2016 | 10/21/2016 | 10/21/2016 8:07:21 AM | | CANC |
|
|
site inactive. No issues observed 10/20
|