ESC17-01473
| General Inspection | 10/19/2018 | 10/22/2018 | 10/24/2018 3:20:09 PM | A | CANC |
|
|
rescheduled
|
ESC18-01121
| General Inspection | 10/19/2018 | 10/22/2018 | 10/22/2018 4:30:00 PM | A | PASS |
|
|
check coffer dam installation
WIP on cofferdam frames. River is still flowing. No plumes or issues observed. Will be on site tomorrow AM
|
ESC17-00599
| Aging Inspection | 10/22/2018 | 10/22/2018 | 10/22/2018 3:39:57 PM | | PASS |
|
|
?WIP on remodel. No trackout or discharges. Trash contained.
|
ESC18-00957
| Site Final | 10/22/2018 | 10/22/2018 | 10/22/2018 3:24:03 PM | P | PASS |
|
|
Garage complete. Area of consruction access has revegetated. ESC permit conditions satisfied.
|
ESC16-00877
| Aging Inspection | 10/22/2018 | 10/22/2018 | 10/22/2018 3:22:47 PM | | PASS |
|
|
No disturbed area of construction observed at site. No ESC issues, no activity on BLD since Nov. 2017. ESC permit finaled
|
ESC16-00877
| DOC - Permit Finaled | 10/22/2018 | 10/22/2018 | 10/22/2018 3:20:41 PM | P | PASS |
|
|
|
ESC18-00319
| Site Final | 10/22/2018 | 10/22/2018 | 10/22/2018 3:04:15 PM | P | PASS |
|
|
Home complete and landscaped. No loose materials around site, no temp. BMPs remaining.
|
ESC17-01430
| Site Final | 10/19/2018 | 10/22/2018 | 10/22/2018 2:58:05 PM | P | PASS |
|
|
Home complete and landscaped. No ESC requests.
|
ESC17-01640
| DOC - Permit Finaled | 10/22/2018 | 10/22/2018 | 10/22/2018 2:35:26 PM | P | PASS |
|
|
|
ESC18-00635
| Random Inspection | 10/22/2018 | 10/22/2018 | 10/22/2018 2:16:22 PM | P | PASS |
|
|
Project near completion. Landscaping complete. No loose dirt leaving site. No loose trash or disturbed area. ESC Site Final scheduled for 2 weeks out.
|
ESC18-00671
| Random Inspection | 10/22/2018 | 10/22/2018 | 10/22/2018 2:15:04 PM | P | PASS |
|
|
Project near completion. Landscaping complete. No loose dirt leaving site. No loose trash or disturbed area. ESC Site Final scheduled for 2 weeks out.
|
ESC18-00885
| General Inspection | 10/22/2018 | 10/22/2018 | 10/22/2018 12:35:50 PM | P | PASS |
|
|
Sidewalk and road installed. No loose dirt leaving site , no trackout. Landscaping of sidewalk medians is in progress. Lots have volunteer vegetation sprouting. No corrections.
|
ESC18-00503
| General Inspection | 10/22/2018 | 10/22/2018 | 10/22/2018 12:03:49 PM | P | PASS |
|
|
Permit posted. No trackout. Broom on site at entrance for sidewalk sweeping or construciton rock. Approved.
|
ESC13-00524
| General Inspection | 10/22/2018 | 10/22/2018 | 10/22/2018 11:36:21 AM | | PASS |
|
|
No new activity. WIll keep open to monitor the sparsely vegetated slope above Paso Fino. Some areas are bare, others have low lying vegetation. Slope interupting wattles are installed and are decomposing. No rills or sediment runof observed to street
|
ESC18-00099
| General Inspection | 10/22/2018 | 10/22/2018 | 10/22/2018 10:50:52 AM | | PASS |
|
|
Framing in progress. Trash contained. Workers parking on pavement. No corrections requested.
|
ESC18-01145
| General Inspection | 10/22/2018 | 10/22/2018 | 10/22/2018 10:28:11 AM | P | PASS |
|
|
WIP on parking lot grading. ESC permit pulled for demolition is now closed. No trackout. Permit sign posted with ESCP information. Perimeter vegetation and curbing preserved. Road base entrance already prepped, no traffic in and out of site.
Approved.
|
ESC18-01394
| Site Final | 10/22/2018 | 10/22/2018 | 10/22/2018 10:26:12 AM | P | PASS |
|
|
Demolition complete. Area now in process of becoming a parking lot and covered seperately, see ESC18-01145. No violations.
|