Inspections for the day of: Monday, October 22, 2018.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-01473 General Inspection10/19/201810/22/201810/24/2018 3:20:09 PMACANC
rescheduled
ESC18-01121 General Inspection10/19/201810/22/201810/22/2018 4:30:00 PMAPASS
check coffer dam installation

WIP on cofferdam frames. River is still flowing. No plumes or issues observed. Will be on site tomorrow AM
ESC17-00599 Aging Inspection10/22/201810/22/201810/22/2018 3:39:57 PM PASS
?WIP on remodel. No trackout or discharges. Trash contained.
ESC18-00957 Site Final10/22/201810/22/201810/22/2018 3:24:03 PMPPASS
Garage complete. Area of consruction access has revegetated. ESC permit conditions satisfied.
ESC16-00877 Aging Inspection10/22/201810/22/201810/22/2018 3:22:47 PM PASS
No disturbed area of construction observed at site. No ESC issues, no activity on BLD since Nov. 2017. ESC permit finaled
ESC16-00877 DOC - Permit Finaled10/22/201810/22/201810/22/2018 3:20:41 PMPPASS
ESC18-00319 Site Final10/22/201810/22/201810/22/2018 3:04:15 PMPPASS
Home complete and landscaped. No loose materials around site, no temp. BMPs remaining.
ESC17-01430 Site Final10/19/201810/22/201810/22/2018 2:58:05 PMPPASS
Home complete and landscaped. No ESC requests.
ESC17-01640 DOC - Permit Finaled10/22/201810/22/201810/22/2018 2:35:26 PMPPASS
ESC18-00635 Random Inspection10/22/201810/22/201810/22/2018 2:16:22 PMPPASS
Project near completion. Landscaping complete. No loose dirt leaving site. No loose trash or disturbed area. ESC Site Final scheduled for 2 weeks out.
ESC18-00671 Random Inspection10/22/201810/22/201810/22/2018 2:15:04 PMPPASS
Project near completion. Landscaping complete. No loose dirt leaving site. No loose trash or disturbed area. ESC Site Final scheduled for 2 weeks out.
ESC18-00885 General Inspection10/22/201810/22/201810/22/2018 12:35:50 PMPPASS
Sidewalk and road installed. No loose dirt leaving site , no trackout. Landscaping of sidewalk medians is in progress. Lots have volunteer vegetation sprouting. No corrections.
ESC18-00503 General Inspection10/22/201810/22/201810/22/2018 12:03:49 PMPPASS
Permit posted. No trackout. Broom on site at entrance for sidewalk sweeping or construciton rock. Approved.
ESC13-00524 General Inspection10/22/201810/22/201810/22/2018 11:36:21 AM PASS
No new activity. WIll keep open to monitor the sparsely vegetated slope above Paso Fino. Some areas are bare, others have low lying vegetation. Slope interupting wattles are installed and are decomposing. No rills or sediment runof observed to street
ESC18-00099 General Inspection10/22/201810/22/201810/22/2018 10:50:52 AM PASS
Framing in progress. Trash contained. Workers parking on pavement. No corrections requested.
ESC18-01145 General Inspection10/22/201810/22/201810/22/2018 10:28:11 AMPPASS
WIP on parking lot grading. ESC permit pulled for demolition is now closed. No trackout. Permit sign posted with ESCP information. Perimeter vegetation and curbing preserved. Road base entrance already prepped, no traffic in and out of site.

Approved.
ESC18-01394 Site Final10/22/201810/22/201810/22/2018 10:26:12 AMPPASS
Demolition complete. Area now in process of becoming a parking lot and covered seperately, see ESC18-01145. No violations.