ESC19-00371
| General Inspection | 10/22/2019 | 10/22/2019 | 10/23/2019 9:05:36 AM | P | PASS |
|
|
Inpspection 10/25 PM
No trackout at either the upper or lower entrance. No muddy discharges or consistent fugitive dust issues observed.
Areas that are at grade have stabilization measures implemented, including tracking, slope interupting wattles, and hydroseeding. There are not many signs of growth yet in hydroseeded areas.
Lots in the finished areas have been terraced and have earthen berm containments to retain water on site. Roadway bases have been compacted but do not yet have pit run due to some pending ACHD approvals. To slow any water that may be flowing down the roads, 1.5 ft check dam/water bars have been installed. Areas that have been tracked will be hydoseeded this week, including above the new outlet pipe from the lower pond.
The site will continue winterization and installation of pipes and is hoping to begin work on the lower stormwater dams but they have not yet been approved by ACHD. If not approved, will need to consider additional temporary retention ponds and volume and velocity controls.
The sewer access road and area where drill rig did test holes will need stabilization measures if the ponds are not approved prior to the 1st week of November.
Follow up scheduled
|
ESC19-00156
| BMP Violation | 10/22/2019 | 10/22/2019 | 10/22/2019 2:34:22 PM | P | PASS |
|
|
call Carl to schedule
Dumped concrete washout cleaned. Site walk through conducted with RP-GC Carl. Site already has sand window swales installed on the south side of development behind the new townhomes, they are covered with geotextile from protection.
Storm drain at corner of Crestwood & Glenwood has sediment protection.
RP to install new washout for upcoming flat work, which is to occur after backfill is put back around the foundations.
|
ESC18-01273
| Site Final | 10/22/2019 | 10/22/2019 | 10/22/2019 1:36:42 PM | P | NR |
|
|
Large stockpile from site is still on adjacnet lot. No material leaving site. Will leave open to figure out management of stockpile.
|
ESC19-00289
| General Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 1:19:02 PM | P | PASS |
|
|
Subdivision infrastructure installed and complete. Lots are prepped for construction. Storm drains in sub have been fitted with DI bags. No muddy runoff or issues observed. Will keep open for when new SFHs begin. Approved.
|
ESC19-01049
| General Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 1:06:24 PM | P | PASS |
|
|
BMPs installed, permit posted at entrance. No trackout or discharges. Minimal activity at site at time of inspection.
|
ESC19-00695
| General Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 12:58:18 PM | P | PASS |
|
|
WIP on carwash structure and loading in subgrade for parking lot. Perimter sediment control, construction entrance, lined concrete washout are all installed andi in acceptable condition. RP onsite, requested that end of day sweeping of Bird occur due to the minor trackout and wet conditions.
Permit sign posted. Approved.
|
ESC18-01304
| General Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 12:35:57 PM | P | PASS |
|
|
Home near completion. Not yet landscaped. No muddy runoff or trackout observed.
|
ESC19-00814
| Site Preparation | 10/21/2019 | 10/22/2019 | 10/22/2019 12:23:42 PM | A | PASS |
|
|
mIKE Phone #: ###-####
Building on site has been demolished and hole filled in with pit run. RP states that existing asphalt around the pit run area will be preserved other than any trenching for utilities that may be required.
Will need to have concrete washout pan, spill kit, and other pollution control measures. Drainage appears to stay onsite draining to the NE corner of parcel. Construction has not yet started.
|
ESC18-01636
| General Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 12:21:02 PM | | PEND |
|
|
Warm Springs bypass to be closed and excavated for sewer connections. Special dewatering system with lined basin has been set up to receive the potentially contaminated ground water from the work. There is no discharge allowed for this dewatering operation. Stockpile on site has been tested and is approved for re-use. Any new excavated soil will need to be stored and tested on site until approval.
Notified engineer to have Knife River notify the SWPPP inspector to be aware of the operation and update the dewaterinfg plan in SWPPP.
Follow up inspection scheduled
|
ESC18-01273
| General Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 11:51:17 AM | | CANC |
|
|
reschedule for site final
|
ESC07-00733
| Aging Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 9:22:22 AM | | PASS |
|
|
|
ESC18-01128
| General Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 8:12:25 AM | | CANC |
|
|
|
ESC16-01472
| General Inspection | 10/22/2019 | 10/22/2019 | 10/22/2019 8:09:20 AM | | PEND |
|
|
Home complete. Case open to check with resolution on the orange silt fence installed during work on the alley.
|