MIS18-00402
| ESC-Conference | 10/19/2018 | 10/23/2018 | 10/24/2018 4:56:52 PM | A | PASS |
|
|
follow up on sweeping and clean up
Road was swept. No further requests at this time.
|
ESC17-01157
| General Inspection | 10/23/2018 | 10/23/2018 | 10/24/2018 3:55:40 PM | | PASS |
|
|
WIP on park development. NO wind blown dust, trackout or discharges observed.
|
ESC17-00426
| Aging Inspection | 10/23/2018 | 10/23/2018 | 10/23/2018 4:01:11 PM | | PASS |
|
|
Some SFHs still in progress. No discharges or trackout outside of sub. Storm drain system retains water onsite.
Will have Wood Bros remove geotextile placed next Spoil Banks canal.
|
ESC18-01121
| General Inspection | 10/19/2018 | 10/23/2018 | 10/23/2018 3:37:33 PM | A | PASS |
|
|
9 AM fish salvage team
Team effort to salvage fish from the section river between cofferdams. Many fish and crawdads found including sculpin, white fish, brown trout, red band trount, suckers. Fish were counted by Water Quality crew. River bypass is operation, culvert to Farmer's Union is open. Mcmillen taking daily water quality samples. Pump dewatering river pool is going into Veteran's Pond and settling behind turbidity curtain.
|
ESC18-01227
| General Inspection | 10/19/2018 | 10/23/2018 | 10/23/2018 3:34:18 PM | P | PEND |
|
|
dewatering plan and implementation follow up.
WIP excavating retention basin area and setting pumps. No dewatering occuring yet. Large settling basin constructed. Retention area overflow still planned to be irrigation ditch which flows north to Spoil Banks canal.
|
ESC17-01692
| Site Final | 10/23/2018 | 10/23/2018 | 10/23/2018 3:01:47 PM | P | PASS |
|
|
Home complete and landscaped. Storm drain sediment protection to removed and monitored under ESC17-00426
|
ESC17-01493
| Site Final | 10/23/2018 | 10/23/2018 | 10/23/2018 3:01:20 PM | P | PASS |
|
|
Home complete and landscaped. Storm drain sediment protection to removed and monitored under ESC17-00426
|
ESC18-00026
| Site Final | 10/23/2018 | 10/23/2018 | 10/23/2018 3:01:00 PM | P | PASS |
|
|
Home complete and landscaped. Storm drain sediment protection to removed and monitored under ESC17-00426
|
ESC17-01645
| Site Final | 10/23/2018 | 10/23/2018 | 10/23/2018 3:00:21 PM | P | PASS |
|
|
Home complete and landscaped. Storm drain sediment protection to removed and monitored under ESC17-00426
|
ESC18-00163
| Site Final | 10/23/2018 | 10/23/2018 | 10/23/2018 3:00:07 PM | P | PASS |
|
|
Home complete and landscaped. Storm drain sediment protection to removed and monitored under ESC17-00426
|
ESC13-01279
| General Inspection | 10/23/2018 | 10/23/2018 | 10/23/2018 7:23:40 AM | | CANC |
|
|
|
ESC17-00455
| General Inspection | 10/23/2018 | 10/23/2018 | 10/23/2018 7:23:20 AM | | CANC |
|
|
|
ESC16-01395
| General Inspection | 10/23/2018 | 10/23/2018 | 10/23/2018 7:23:10 AM | | CANC |
|
|
|