Inspections for the day of: Friday, October 25, 2019.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-01104 General Inspection10/25/201910/25/201910/29/2019 3:08:08 PM CANC
ESC19-00780 General Inspection10/25/201910/25/201910/25/2019 12:18:14 PMPPEND
Met with RP-GC Ken.

Corrective actions to occur:
- install wattle around stockpiles along 5th street sidewalk. Will need to be weighed down in areas where staking is not possible.
- install wattle at low point between sidewalk and alley (NW corner of lot) to treat runoff flowing to the Sherman street gutter
- install snake bag check dam on Sherman gutter
- clean Sherman gutter
- if stockpiles can not be backfill by end on November, will need to cover with tarps.
ESC19-00444 General Inspection10/25/201910/25/201910/25/2019 12:14:55 PMPPEND
No washout on site for pump truck at site. Request to RP to have a washout built. RP had on site foreman begin to build a washout containment as I was on site. Will follow up Monday.
ESC19-00372 General Inspection10/25/201910/25/201910/25/2019 12:13:28 PMPPASS
ESC19-01120 General Inspection10/25/201910/25/201910/25/2019 12:13:12 PMPPASS
No activity. Permit posted, BMPs installed. No dirt on street/gutter
ESC18-00164 Complaint Inspection10/25/201910/25/201910/25/2019 11:28:45 AMPPASS
dust complaint

No dust at time of inspection. Spoke with onsite crew manager Alfredo about keeping dust down. Water truck is coming to site so work can continue on the lower swale adjacent to homes below. No major activity, finishing up sewer work,

No trackout or discharges.Silt fence BMP installed at bottom of site. Graded slope has been tracked:

Corrections:
- stockpile has been on site for over a month, much of it is inactive and past stabillization deadline.
- need to have graded areas hydroseeded before end of November

ESC18-01238 Site Final10/24/201910/25/201910/25/2019 9:55:39 AMAPASS
Construction complete. No disturbed area, no temporary BMPs left on site.
ESC17-01196 General Inspection10/25/201910/25/201910/25/2019 9:51:20 AM CANC
rescheduled for site final
ESC18-01645 Aging Inspection10/25/201910/25/201910/25/2019 9:47:13 AM CANC
ESC18-01178 Site Final10/24/201910/25/201910/25/2019 8:30:38 AMPNR
need to pull storm drain sediment bags downhill from site
ESC18-00171 General Inspection10/25/201910/25/201910/25/2019 8:22:39 AM CANC
rescheduled