Inspections for the day of: Friday, October 28, 2016.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00406 General Inspection10/26/201610/28/201611/2/2016 8:02:24 AMACANC
ESC16-01219 General Inspection10/21/201610/28/201610/31/2016 11:35:47 AMPCANC
rescheduled
ESC16-00572 General Inspection10/28/201610/28/201610/31/2016 8:54:58 AM PASS
Pre-existing asphalt entrance used for staging and to prevent trackout. Site is very muddy within, however stormwaater retained onsite. No offsite discharge
ESC16-00553 Aging Inspection10/28/201610/28/201610/28/2016 4:25:55 PM PASS
All permits finaled. No ESC issues
ESC16-00553 DOC - Permit Finaled10/28/201610/28/201610/28/2016 4:25:41 PMPPASS
ESC16-01398 General Inspection10/27/201610/28/201610/28/2016 4:20:58 PMPPASS
WIP on foundation. NO trackout to street, access drive for the 4 new SFHs is paved. Trash container onsite, permit posted. Approved.
ESC16-00945 General Inspection10/27/201610/28/201610/28/2016 4:06:14 PMPPART
Need to re-install construction entrance.

No activity at time of inspection, no crew on site. Silt fence remains installed and in good condition.

Will re-inspect Monday
ESC15-00509 General Inspection10/28/201610/28/201610/28/2016 3:58:17 PMPFAIL
follow up inspection

No materials removed from site as discussed.

Final warning to Visser Building, re-inspection fees will start to be applied.

Rick w/ Visser will order removal again and update with schedule
ESC16-00349 General Inspection10/28/201610/28/201610/28/2016 3:23:08 PM PASS
ESC15-00817 General Inspection10/28/201610/28/201610/28/2016 3:15:56 PM CANC
ESC16-00485 Aging Inspection10/28/201610/28/201610/28/2016 2:04:08 PM PASS
ESC16-00055 Aging Inspection10/28/201610/28/201610/28/2016 2:04:01 PM PASS
ESC15-01395 General Inspection10/28/201610/28/201610/28/2016 1:33:54 PM PASS
See also ESC15-00762 for Fowler project. Streets have been recently swept, with only minor accumulation of loose dirt. Vertical construction and wood framing in progress. No discharges spills, or trackout from work area
ESC15-00762 General Inspection10/28/201610/28/201610/28/2016 1:33:29 PM PASS
See also ESC15-1395 for Fowler project. Streets have been recently swept, with only minor accumulation of loose dirt. Vertical construction and wood framing in progress. No discharges spills, or trackout from work area.
ESC15-01184 General Inspection10/28/201610/28/201610/28/2016 1:33:29 PM PASS
WIP. NO trackout. DI bags and construction entrance maintained and in good condition. No corrections requested.
ESC15-00556 General Inspection10/28/201610/28/201610/28/2016 10:20:12 AM CANC
rescheduled for 10/31. No issues observed yesterday in East Valley
ESC16-00235 Aging Inspection10/28/201610/28/201610/28/2016 10:14:41 AM PASS
ESC16-00236 Aging Inspection10/28/201610/28/201610/28/2016 10:14:30 AM PASS
ESC14-01083 General Inspection10/28/201610/28/201610/28/2016 9:14:50 AM PASS
WIP on finishing lanscaping within the completed central phase as well as foundation and frames on the west end of project.

No trackout to Barber Valley, employee parking on pavement provided. Adequate trash containment. BMPs include designated washout facility and sediment filter bags on Park Place storm drains.

Trash picked up along swale as requested.
ESC16-00178 General Inspection10/28/201610/28/201610/28/2016 8:25:27 AM CANC
revegetation phase, home occupied. no inspection