ESC16-00406
| General Inspection | 10/26/2016 | 10/28/2016 | 11/2/2016 8:02:24 AM | A | CANC |
|
|
|
ESC16-01219
| General Inspection | 10/21/2016 | 10/28/2016 | 10/31/2016 11:35:47 AM | P | CANC |
|
|
rescheduled
|
ESC16-00572
| General Inspection | 10/28/2016 | 10/28/2016 | 10/31/2016 8:54:58 AM | | PASS |
|
|
Pre-existing asphalt entrance used for staging and to prevent trackout. Site is very muddy within, however stormwaater retained onsite. No offsite discharge
|
ESC16-00553
| Aging Inspection | 10/28/2016 | 10/28/2016 | 10/28/2016 4:25:55 PM | | PASS |
|
|
All permits finaled. No ESC issues
|
ESC16-00553
| DOC - Permit Finaled | 10/28/2016 | 10/28/2016 | 10/28/2016 4:25:41 PM | P | PASS |
|
|
|
ESC16-01398
| General Inspection | 10/27/2016 | 10/28/2016 | 10/28/2016 4:20:58 PM | P | PASS |
|
|
WIP on foundation. NO trackout to street, access drive for the 4 new SFHs is paved. Trash container onsite, permit posted. Approved.
|
ESC16-00945
| General Inspection | 10/27/2016 | 10/28/2016 | 10/28/2016 4:06:14 PM | P | PART |
|
|
Need to re-install construction entrance.
No activity at time of inspection, no crew on site. Silt fence remains installed and in good condition.
Will re-inspect Monday
|
ESC15-00509
| General Inspection | 10/28/2016 | 10/28/2016 | 10/28/2016 3:58:17 PM | P | FAIL |
|
|
follow up inspection
No materials removed from site as discussed.
Final warning to Visser Building, re-inspection fees will start to be applied.
Rick w/ Visser will order removal again and update with schedule
|
ESC16-00349
| General Inspection | 10/28/2016 | 10/28/2016 | 10/28/2016 3:23:08 PM | | PASS |
|
|
|
ESC15-00817
| General Inspection | 10/28/2016 | 10/28/2016 | 10/28/2016 3:15:56 PM | | CANC |
|
|
|
ESC16-00485
| Aging Inspection | 10/28/2016 | 10/28/2016 | 10/28/2016 2:04:08 PM | | PASS |
|
|
|
ESC16-00055
| Aging Inspection | 10/28/2016 | 10/28/2016 | 10/28/2016 2:04:01 PM | | PASS |
|
|
|
ESC15-01395
| General Inspection | 10/28/2016 | 10/28/2016 | 10/28/2016 1:33:54 PM | | PASS |
|
|
See also ESC15-00762 for Fowler project. Streets have been recently swept, with only minor accumulation of loose dirt. Vertical construction and wood framing in progress. No discharges spills, or trackout from work area
|
ESC15-00762
| General Inspection | 10/28/2016 | 10/28/2016 | 10/28/2016 1:33:29 PM | | PASS |
|
|
See also ESC15-1395 for Fowler project. Streets have been recently swept, with only minor accumulation of loose dirt. Vertical construction and wood framing in progress. No discharges spills, or trackout from work area.
|
ESC15-01184
| General Inspection | 10/28/2016 | 10/28/2016 | 10/28/2016 1:33:29 PM | | PASS |
|
|
WIP. NO trackout. DI bags and construction entrance maintained and in good condition. No corrections requested.
|
ESC15-00556
| General Inspection | 10/28/2016 | 10/28/2016 | 10/28/2016 10:20:12 AM | | CANC |
|
|
rescheduled for 10/31. No issues observed yesterday in East Valley
|
ESC16-00235
| Aging Inspection | 10/28/2016 | 10/28/2016 | 10/28/2016 10:14:41 AM | | PASS |
|
|
|
ESC16-00236
| Aging Inspection | 10/28/2016 | 10/28/2016 | 10/28/2016 10:14:30 AM | | PASS |
|
|
|
ESC14-01083
| General Inspection | 10/28/2016 | 10/28/2016 | 10/28/2016 9:14:50 AM | | PASS |
|
|
WIP on finishing lanscaping within the completed central phase as well as foundation and frames on the west end of project.
No trackout to Barber Valley, employee parking on pavement provided. Adequate trash containment. BMPs include designated washout facility and sediment filter bags on Park Place storm drains.
Trash picked up along swale as requested.
|
ESC16-00178
| General Inspection | 10/28/2016 | 10/28/2016 | 10/28/2016 8:25:27 AM | | CANC |
|
|
revegetation phase, home occupied. no inspection
|