Inspections for the day of: Wednesday, October 3, 2018.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC18-00440 General Inspection9/28/201810/3/201810/5/2018 4:33:02 PMAPEND
follow up with RP about stabilization of disturbed slopes
ESC16-00741 BMP Violation10/2/201810/3/201810/5/2018 11:45:07 AMPFAIL
No new inlet protection as requested. No dicharges from site, but need to protect that inlet on Main @ 5th ASAP
ESC18-00171 General Inspection10/2/201810/3/201810/4/2018 1:43:33 PMAPASS
Silt fence perimeter installed. Slopes are bare but tracked and compacted. No runoff down Sherman during rainfall. No corrections requested.
ESC18-00264 General Inspection10/2/201810/3/201810/4/2018 1:41:19 PMAPASS
No sediment runoff down Sherman observed during rainfall inspection. Some of driveway is now paved and landscaping. No corrections at this time.
ESC18-00946 BMP Violation10/3/201810/3/201810/3/2018 3:26:11 PMPFAIL
Road shoulder and gutter was swept as requested, wattles are still not trenched in and there is no other controls. Gravel bag check dam needs cleanup and replacement since it has been driven over.

Compliance extended to correct. Will meet on site with RP-GC this week to discuss additional controls and proper installation.
ESC18-00946 Conference10/1/201810/3/201810/3/2018 3:13:30 PMACANC
ESC18-01022 General Inspection10/3/201810/3/201810/3/2018 2:46:53 PMPPASS
WIP on grading and moving fill from ridge to lower areas of subdivsion phase. Water wagons circulating with belly scrapers, no fugitive dust clouds leaving site. NO trackout from site access points. A water diversion trench has been installed at botton of canyon and Eyrie Way to direct any runoff coming down into the stormwater/sediment retention pond.

Ridge work is being conducted per protocol, 2-3 foot shelf left to prevent and rockfall or clods from rolling down hill. Safety fence appears in good condition, area of slope disturbance from water truck misfire has had ECBs and slope interupting wattles installed.

Approved, site is in compliance.
ESC18-00885 Random Inspection10/3/201810/3/201810/3/2018 1:51:35 PMPFAIL
Significant amount of dust clouds floating offsite. Landscape crew speeding around kicking up dust while re-distributing the stockpile. No water truck or other control onsite.

Verbal correction over phone to RP Eric. Will put landscape foreman on warning to.
ESC17-01287 General Inspection10/3/201810/3/201810/3/2018 1:49:50 PM FAIL
No trackout, discharges, or sediment running down hill. Permit posted.

Corrections needed:
- re-install and maintain wattles on slopes
- pick up loose trash and foam insulation blocks on site and around the perimeter and in adajent properties. Contain or haul off trash pile.
- sweep loose dirt on road surface below the silt fence on Twilight.

Verbal correction request to RP Tim. He stated they will begin clean up this evening. Follow up scheduled for next Tuesday.
ESC17-01002 General Inspection10/2/201810/3/201810/3/2018 11:21:16 AMAPASS
dewatering inspection.

dewatering pit installed. Water discharging into pit is 1.7 NTU. Dishcharge out of wattle is overflowing through a straw wattle and bankside vegetation. No plume visible. Water upstream in creek is approx. 6 NTU.

Approved.
ESC18-01360 General Inspection10/2/201810/3/201810/3/2018 11:21:01 AMAPASS
dewatering inspection.

dewatering pit installed. Water discharging into pit is 1.7 NTU. Dishcharge out of wattle is overflowing through a straw wattle and bankside vegetation. No plume visible. Water upstream in creek is approx. 6 NTU.

Approved.
ESC16-00225 General Inspection10/3/201810/3/201810/3/2018 8:08:57 AM PASS
Inspected 10/2 PM.

No new subdivision acivity. Dry weather conditions during inspection. No trackout, spills, or other issues observed. 2 SFHs in progress
ESC17-01158 General Inspection10/3/201810/3/201810/3/2018 8:05:25 AM CANC