Inspections for the day of: Monday, October 30, 2017.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00786 BMP Violation10/27/201710/30/201711/1/2017 12:51:20 PMAFAIL
check for dumped washout clean up and a new washout facility provided.

No new washout provided on site, pile of washout and material was not cleaned thoroughly. Loose dirt, cement dust, and other debris in gutter and moving in gutter westward. Need to sweep up ASAP.

2nd Correction request at site.
ESC17-00426 BMP Violation10/30/201710/30/201710/30/2017 5:06:13 PMPFAIL
Turbid discharge to Spoil Banks canal, flows to Boise River.

Dewatering ponds and current setup are not adequate for treatment.
ESC17-01140 Complaint Inspection10/30/201710/30/201710/30/2017 4:59:43 PMPPEND
Correction request to move stockpile placed on adjacent lot in Odom Estates.

Stated excavator was supposed to move it today but did not go to the site.
ESC17-01146 General Inspection10/27/201710/30/201710/30/2017 3:18:14 PMPFAIL
No clean up or change at site.

Millwell new phase, still no washout facilities.
ESC17-00002 DOC - Permit Finaled10/30/201710/30/201710/30/2017 2:59:16 PMPPASS
Home complete and landscaped. BLD finaled.
ESC17-00244 DOC - Permit Finaled10/30/201710/30/201710/30/2017 2:58:44 PMPPASS
Project complete & stabilized. BLD finaled.
ESC16-01721 DOC - Permit Finaled10/30/201710/30/201710/30/2017 2:57:35 PMPPASS
ESC16-01090 Aging Inspection10/30/201710/30/201710/30/2017 2:52:08 PM PASS
No activity. BLD permit extended till end of 2017, looks like project has not yet started.
ESC13-00524 General Inspection10/30/201710/30/201710/30/2017 2:04:06 PM CANC
ESC15-00863 DOC - Permit Finaled10/30/201710/30/201710/30/2017 2:03:14 PMPPASS
ESC17-00426 General Inspection10/27/201710/30/201710/30/2017 1:58:18 PMAPEND
Dewatering water still turbid at discharge point into Spoil Banks Canal at time of inspection. Was reportedly clear this morning but is picking up sediment within ditch and settling area, potentially due to unwashed gravel check dams.

Additional filter material placed in irrigation box.

Grassy pond at Millwell phase II has not been approved by ACHD as an alternative discharge point.
ESC17-01479 BMP Violation10/27/201710/30/201710/30/2017 1:55:02 PMAPEND
SWO removed. Onsite retention and infiltration pond set up instead of discharging offsite to irrigation ditch. No discharge offsite is allowed.
ESC15-00234 Aging Inspection10/30/201710/30/201710/30/2017 8:09:47 AM CANC
NO activity or operator at project. No runoff issues at site. No futher inspections.
ESC15-00234 DOC - Permit Finaled10/30/201710/30/201710/30/2017 8:09:10 AMPPASS
ESC16-01213 Site Final10/16/201710/30/201710/30/2017 8:08:54 AMADONE
If DI bags still in, issue re-inspection fee.

DI bag removed; permit finaled.