PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, October 31, 2017
.
Number of inspections:
24
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC17-00842
General Inspection
10/31/2017
10/31/2017
11/2/2017 3:10:56 PM
P
PEND
NO construction entrance or onsite stormwater retention system in place. Site at considerable ESC risk.
More corrections and inspections scheduled. Inspected 11/1 by MPZ. No discharges or fugitive dust noted. Crews working on permanent stormwater pond/infiltration basin.
ESC12-00403
General Inspection
10/31/2017
10/31/2017
11/1/2017 2:52:26 PM
CANC
ESC17-00426
General Inspection
10/31/2017
10/31/2017
10/31/2017 4:56:34 PM
P
PEND
Dewatering follow up inspection. In the morning 10/31 construction activity was halted as crews worked to plug irrigation piping to halt turbid water from discharging into Spoil Banks Canal.
Discharge has now stopped and water has not yet backed up in manholes to overflow to barrow ditch. Once entering the ditch there is approximately 100 M of vegetated channel. Water should infiltrate before reaching the creek.
Flow to continue through tomorrow. Will need follow up inspection tomorrow.
Turbidity sample at discharge point to canal was 166 NTU. Upstream, the canal at Pierce Park is 10 NTU. Downstream , approximately half mile from site at Gillis Street bridge was between 10 -11 NTU. A debris dam just below the discharge point in the creek has created a deeper pool where turbid water is trapped and is settling out.
ESC17-00426
General Inspection
10/31/2017
10/31/2017
10/31/2017 4:46:21 PM
A
PEND
Construction halted to improve dewatering system to prevent turbid discharge.
Discharge this morning to Spoil Banks Canal was turbid.
ESC16-01265
Aging Inspection
10/31/2017
10/31/2017
10/31/2017 12:45:42 PM
CANC
ESC16-01352
Aging Inspection
10/31/2017
10/31/2017
10/31/2017 12:45:26 PM
CANC
ESC16-01434
General Inspection
10/31/2017
10/31/2017
10/31/2017 12:45:17 PM
CANC
ESC16-01268
Aging Inspection
10/31/2017
10/31/2017
10/31/2017 12:45:06 PM
PASS
ESC17-00526
General Inspection
10/31/2017
10/31/2017
10/31/2017 12:43:37 PM
P
PASS
WIP on new bathroom facility foundation. Permit sign posted, utilizing Ecopan concrete washout.
No trackout from site, perimeter controls install between project and Quinn's Pond. No corrections needed.
ESC17-01146
BMP Violation
10/31/2017
10/31/2017
10/31/2017 12:27:03 PM
A
PEND
Each site to provide own washout facility or have hauled offsite. Asbury Construction on notice for multiple violations and lack of housekeeping at projects in Millwell.
ESC17-01034
Conference
10/31/2017
10/31/2017
10/31/2017 12:25:59 PM
A
PASS
Pre-construction conference call. Approved to begin activities at site, will post ESC permit, protect inlets on Enterprise, and provide concrete washout.
RP aware of ESC permit requirements. Approved.
ESC17-01016
BMP Violation
10/31/2017
10/31/2017
10/31/2017 12:05:51 PM
A
FAIL
No permit sign posted
No regular clean up or containment of backfill
No washout provided
Further enforcement pending. VM left to RP Andrina
ESC17-00390
BMP Violation
10/31/2017
10/31/2017
10/31/2017 11:48:09 AM
A
FAIL
Correction notice posted:
- sweep up sidewalk and gutter
- pick up uncontained trash
- get valid RP on permit sign
NO correction by end of day 11/1/2017 will result in re-inspection fee/SWO
ESC17-00389
BMP Violation
10/30/2017
10/31/2017
10/31/2017 11:39:52 AM
A
FAIL
Correction request issued to remove uncontained trash pile at site before end of week.
ESC17-00044
Site Final
10/31/2017
10/31/2017
10/31/2017 10:43:44 AM
P
NR
DI bags left behind after stabilization of projects in Belmar. Need to remove DI bags to final ESC permits still open.
ESC16-01243
Site Final
10/31/2017
10/31/2017
10/31/2017 10:43:26 AM
P
NR
DI bags left behind after stabilization of projects in Belmar. Need to remove DI bags to final ESC permits still open.
ESC16-01243
Aging Inspection
10/31/2017
10/31/2017
10/31/2017 10:42:34 AM
FAIL
Project complete and stabilized. No removal of temporary BMP storm drain inlet at the south end of streeet.
Correction to Downey and/or ZEC to remove DI bags in Belmar.
ESC17-00642
DOC - Permit Finaled
10/31/2017
10/31/2017
10/31/2017 10:37:04 AM
P
PASS
ESC17-01479
General Inspection
10/31/2017
10/31/2017
10/31/2017 10:31:19 AM
A
PASS
Dewatering follow up.
Water from trenching is remaining onsite for infiltration. A ditch has been extended along the west and north site perimeter.
Will need to continue to extend ditch for more capacity.
No offsite discharges or trackout.
ESC17-00426
Stop Work Order
10/31/2017
10/31/2017
10/31/2017 9:17:10 AM
A
FAIL
Dewatering project with turbid discharge into Spoil Banks Canal. Corrective actions in place since 10/27 not settling or removing sediment and turbidity plume.
Issued verbal SWO to Wood Bros. RP to get new dewatering plan and setup and have inspected with proof of treated discharge. Working to re-direct water to Millwell Pond for infiltration.
ESC16-01379
Aging Inspection
10/31/2017
10/31/2017
10/31/2017 8:49:24 AM
CANC
ESC02-00671
DOC - Permit Finaled
10/31/2017
10/31/2017
10/31/2017 8:02:15 AM
P
PASS
old expired permit closed from database
ESC16-01421
General Inspection
10/31/2017
10/31/2017
10/31/2017 8:00:17 AM
CANC
ESC16-01719
General Inspection
10/31/2017
10/31/2017
10/31/2017 7:56:20 AM
CANC