Inspections for the day of: Thursday, October 4, 2018.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS18-00346 ESC-Conference9/27/201810/4/201810/12/2018 3:48:08 PMACANC
contact parcel owner or realtor
ESC17-01488 Tracking Control10/4/201810/4/201810/8/2018 4:09:41 PMPCANC
ESC18-00659 Tracking Control10/3/201810/4/201810/5/2018 11:45:33 AMPPEND
ESC17-00771 Aging Inspection10/4/201810/4/201810/5/2018 11:45:21 AM CANC
ESC17-01157 General Inspection10/4/201810/4/201810/4/2018 3:41:18 PM CANC
rescheduled
ESC17-01759 General Inspection10/4/201810/4/201810/4/2018 3:32:44 PM CANC
ESC17-01342 Aging Inspection10/4/201810/4/201810/4/2018 3:04:30 PM CANC
ESC17-01758 General Inspection10/4/201810/4/201810/4/2018 3:04:19 PM CANC
ESC18-01012 General Inspection10/4/201810/4/201810/4/2018 2:48:39 PMPPASS
WIP on foundation. No sediment runoff from site. Trash contained. Permit posted. Will follow up for inlet protection on receiving storm drain.
ESC18-01266 General Inspection10/2/201810/4/201810/4/2018 2:23:06 PMPPASS
follow up inspection

Trash picked up and placed in new trash bin as requested. No inlet protection yet on Emerald, site is below grade of sidewalk and Harding, no muddy runoff occuring during rain. No crew on site today.
ESC17-00227 General Inspection10/4/201810/4/201810/4/2018 1:44:05 PM CANC
rescheduled for site final
ESC18-01005 General Inspection10/2/201810/4/201810/4/2018 1:08:00 PMAPASS
9 AM wth Brian Terry and Susan Beesley, Micron environmental compliance division. Inspection conducted by ESC Inspectors Long and Zawacki

Micron SWPPP inspection of all construction projects with earth disturbance and use of staging and laydown areas. The CUP, Nitrogen plant, and B37 are under construction. B37 parking lots should be paved before end of month. Interior work is still occuring on Fab 51. Pathway is in progress around perimeter of site. Parking lot expansion at the MASK building on Columbia.

SWPPP inspections are conducted weekly by Micron stormwater team as well as contractors (Air Products, ESI, Stock, Warner) . SWPPP binders, site maps, and inspection reports were available for review and are well organized and complete.

Light rain and wind at time of inspection.

BMPs installed:
- construction trackout control with rock and rumble bars for both access points (B37 and laydown/employee parking)
- parking and laydown area access route has certain areas with rock and geotextile berms to prevent runoff from leaving the construction area into Micron employee parking.
- storm drain inlet protection on all receiving inlets. Stormwater is retained onsite at Micron.
- lined concrete washouts
- large covered dumpsters
- containers for material and equipment storage prevent exposure to rain
- spill kits located in various locations around site.
- water trucks onsite to keep down dust.

No violations observed. Site is clean, BMPs are installed correctly, site is inpsected regularly. No correction requests at this time, Micron projects are currently in compliance.
ESC16-00242 General Inspection10/2/201810/4/201810/4/2018 1:07:42 PMAPASS
9 AM wth Brian Terry and Susan Beesley, Micron environmental compliance division. Inspection conducted by ESC Inspectors Long and Zawacki

Micron SWPPP inspection of all construction projects with earth disturbance and use of staging and laydown areas. The CUP, Nitrogen plant, and B37 are under construction. B37 parking lots should be paved before end of month. Interior work is still occuring on Fab 51. Pathway is in progress around perimeter of site. Parking lot expansion at the MASK building on Columbia.

SWPPP inspections are conducted weekly by Micron stormwater team as well as contractors (Air Products, ESI, Stock, Warner) . SWPPP binders, site maps, and inspection reports were available for review and are well organized and complete.

Light rain and wind at time of inspection.

BMPs installed:
- construction trackout control with rock and rumble bars for both access points (B37 and laydown/employee parking)
- parking and laydown area access route has certain areas with rock and geotextile berms to prevent runoff from leaving the construction area into Micron employee parking.
- storm drain inlet protection on all receiving inlets. Stormwater is retained onsite at Micron.
- lined concrete washouts
- large covered dumpsters
- containers for material and equipment storage prevent exposure to rain
- spill kits located in various locations around site.
- water trucks onsite to keep down dust.

No violations observed. Site is clean, BMPs are installed correctly, site is inpsected regularly. No correction requests at this time, Micron projects are currently in compliance.
ESC18-00006 General Inspection10/2/201810/4/201810/4/2018 1:07:24 PMAPASS
9 AM wth Brian Terry and Susan Beesley, Micron environmental compliance division. Inspection conducted by ESC Inspectors Long and Zawacki

Micron SWPPP inspection of all construction projects with earth disturbance and use of staging and laydown areas. The CUP, Nitrogen plant, and B37 are under construction. B37 parking lots should be paved before end of month. Interior work is still occuring on Fab 51. Pathway is in progress around perimeter of site. Parking lot expansion at the MASK building on Columbia.

SWPPP inspections are conducted weekly by Micron stormwater team as well as contractors (Air Products, ESI, Stock, Warner) . SWPPP binders, site maps, and inspection reports were available for review and are well organized and complete.

Light rain and wind at time of inspection.

BMPs installed:
- construction trackout control with rock and rumble bars for both access points (B37 and laydown/employee parking)
- parking and laydown area access route has certain areas with rock and geotextile berms to prevent runoff from leaving the construction area into Micron employee parking.
- storm drain inlet protection on all receiving inlets. Stormwater is retained onsite at Micron.
- lined concrete washouts
- large covered dumpsters
- containers for material and equipment storage prevent exposure to rain
- spill kits located in various locations around site.
- water trucks onsite to keep down dust.

No violations observed. Site is clean, BMPs are installed correctly, site is inpsected regularly. No correction requests at this time, Micron projects are currently in compliance.
ESC18-00251 General Inspection10/2/201810/4/201810/4/2018 1:07:06 PMAPASS
9 AM wth Brian Terry and Susan Beesley, Micron environmental compliance division. Inspection conducted by ESC Inspectors Long and Zawacki

Micron SWPPP inspection of all construction projects with earth disturbance and use of staging and laydown areas. The CUP, Nitrogen plant, and B37 are under construction. B37 parking lots should be paved before end of month. Interior work is still occuring on Fab 51. Pathway is in progress around perimeter of site. Parking lot expansion at the MASK building on Columbia.

SWPPP inspections are conducted weekly by Micron stormwater team as well as contractors (Air Products, ESI, Stock, Warner) . SWPPP binders, site maps, and inspection reports were available for review and are well organized and complete.

Light rain and wind at time of inspection.

BMPs installed:
- construction trackout control with rock and rumble bars for both access points (B37 and laydown/employee parking)
- parking and laydown area access route has certain areas with rock and geotextile berms to prevent runoff from leaving the construction area into Micron employee parking.
- storm drain inlet protection on all receiving inlets. Stormwater is retained onsite at Micron.
- lined concrete washouts
- large covered dumpsters
- containers for material and equipment storage prevent exposure to rain
- spill kits located in various locations around site.
- water trucks onsite to keep down dust.

No violations observed. Site is clean, BMPs are installed correctly, site is inpsected regularly. No correction requests at this time, Micron projects are currently in compliance.
ESC18-00616 General Inspection10/2/201810/4/201810/4/2018 1:06:50 PMAPASS
9 AM wth Brian Terry and Susan Beesley, Micron environmental compliance division. Inspection conducted by ESC Inspectors Long and Zawacki

Micron SWPPP inspection of all construction projects with earth disturbance and use of staging and laydown areas. The CUP, Nitrogen plant, and B37 are under construction. B37 parking lots should be paved before end of month. Interior work is still occuring on Fab 51. Pathway is in progress around perimeter of site. Parking lot expansion at the MASK building on Columbia.

SWPPP inspections are conducted weekly by Micron stormwater team as well as contractors (Air Products, ESI, Stock, Warner) . SWPPP binders, site maps, and inspection reports were available for review and are well organized and complete.

Light rain and wind at time of inspection.

BMPs installed:
- construction trackout control with rock and rumble bars for both access points (B37 and laydown/employee parking)
- parking and laydown area access route has certain areas with rock and geotextile berms to prevent runoff from leaving the construction area into Micron employee parking.
- storm drain inlet protection on all receiving inlets. Stormwater is retained onsite at Micron.
- lined concrete washouts
- large covered dumpsters
- containers for material and equipment storage prevent exposure to rain
- spill kits located in various locations around site.
- water trucks onsite to keep down dust.

No violations observed. Site is clean, BMPs are installed correctly, site is inpsected regularly. No correction requests at this time, Micron projects are currently in compliance.
ESC17-01488 BMP Violation10/4/201810/4/201810/4/2018 12:34:32 PMAFAIL
No construction entrance or designated access for deliveries or employee parking. Need to designate a parking area and location for heavy duty construction entrance. Currenly parking in dirt/mud along shoulder of road.
ESC18-00896 General Inspection10/2/201810/4/201810/4/2018 12:29:33 PMAPASS
Bike shelter is complete. ESC permit finaled.
ESC18-00896 DOC - Permit Finaled10/4/201810/4/201810/4/2018 12:29:10 PMPPASS
ESC16-01472 General Inspection10/4/201810/4/201810/4/2018 10:47:17 AMAPASS
Rainfall inspection.

No runoff from site to Logan. BMPs installed, no trackout.
ESC17-01384 Aging Inspection10/4/201810/4/201810/4/2018 10:19:37 AM PASS
ESC17-01384 DOC - Permit Finaled10/4/201810/4/201810/4/2018 10:19:30 AMPPASS
ESC18-00659 General Inspection10/1/201810/4/201810/3/2018 8:08:16 AMACANC