MIS18-00346
| ESC-Conference | 9/27/2018 | 10/4/2018 | 10/12/2018 3:48:08 PM | A | CANC |
|
|
contact parcel owner or realtor
|
ESC17-01488
| Tracking Control | 10/4/2018 | 10/4/2018 | 10/8/2018 4:09:41 PM | P | CANC |
|
|
|
ESC18-00659
| Tracking Control | 10/3/2018 | 10/4/2018 | 10/5/2018 11:45:33 AM | P | PEND |
|
|
|
ESC17-00771
| Aging Inspection | 10/4/2018 | 10/4/2018 | 10/5/2018 11:45:21 AM | | CANC |
|
|
|
ESC17-01157
| General Inspection | 10/4/2018 | 10/4/2018 | 10/4/2018 3:41:18 PM | | CANC |
|
|
rescheduled
|
ESC17-01759
| General Inspection | 10/4/2018 | 10/4/2018 | 10/4/2018 3:32:44 PM | | CANC |
|
|
|
ESC17-01342
| Aging Inspection | 10/4/2018 | 10/4/2018 | 10/4/2018 3:04:30 PM | | CANC |
|
|
|
ESC17-01758
| General Inspection | 10/4/2018 | 10/4/2018 | 10/4/2018 3:04:19 PM | | CANC |
|
|
|
ESC18-01012
| General Inspection | 10/4/2018 | 10/4/2018 | 10/4/2018 2:48:39 PM | P | PASS |
|
|
WIP on foundation. No sediment runoff from site. Trash contained. Permit posted. Will follow up for inlet protection on receiving storm drain.
|
ESC18-01266
| General Inspection | 10/2/2018 | 10/4/2018 | 10/4/2018 2:23:06 PM | P | PASS |
|
|
follow up inspection
Trash picked up and placed in new trash bin as requested. No inlet protection yet on Emerald, site is below grade of sidewalk and Harding, no muddy runoff occuring during rain. No crew on site today.
|
ESC17-00227
| General Inspection | 10/4/2018 | 10/4/2018 | 10/4/2018 1:44:05 PM | | CANC |
|
|
rescheduled for site final
|
ESC18-01005
| General Inspection | 10/2/2018 | 10/4/2018 | 10/4/2018 1:08:00 PM | A | PASS |
|
|
9 AM wth Brian Terry and Susan Beesley, Micron environmental compliance division. Inspection conducted by ESC Inspectors Long and Zawacki
Micron SWPPP inspection of all construction projects with earth disturbance and use of staging and laydown areas. The CUP, Nitrogen plant, and B37 are under construction. B37 parking lots should be paved before end of month. Interior work is still occuring on Fab 51. Pathway is in progress around perimeter of site. Parking lot expansion at the MASK building on Columbia.
SWPPP inspections are conducted weekly by Micron stormwater team as well as contractors (Air Products, ESI, Stock, Warner) . SWPPP binders, site maps, and inspection reports were available for review and are well organized and complete.
Light rain and wind at time of inspection.
BMPs installed: - construction trackout control with rock and rumble bars for both access points (B37 and laydown/employee parking) - parking and laydown area access route has certain areas with rock and geotextile berms to prevent runoff from leaving the construction area into Micron employee parking. - storm drain inlet protection on all receiving inlets. Stormwater is retained onsite at Micron. - lined concrete washouts - large covered dumpsters - containers for material and equipment storage prevent exposure to rain - spill kits located in various locations around site. - water trucks onsite to keep down dust.
No violations observed. Site is clean, BMPs are installed correctly, site is inpsected regularly. No correction requests at this time, Micron projects are currently in compliance.
|
ESC16-00242
| General Inspection | 10/2/2018 | 10/4/2018 | 10/4/2018 1:07:42 PM | A | PASS |
|
|
9 AM wth Brian Terry and Susan Beesley, Micron environmental compliance division. Inspection conducted by ESC Inspectors Long and Zawacki
Micron SWPPP inspection of all construction projects with earth disturbance and use of staging and laydown areas. The CUP, Nitrogen plant, and B37 are under construction. B37 parking lots should be paved before end of month. Interior work is still occuring on Fab 51. Pathway is in progress around perimeter of site. Parking lot expansion at the MASK building on Columbia.
SWPPP inspections are conducted weekly by Micron stormwater team as well as contractors (Air Products, ESI, Stock, Warner) . SWPPP binders, site maps, and inspection reports were available for review and are well organized and complete.
Light rain and wind at time of inspection.
BMPs installed: - construction trackout control with rock and rumble bars for both access points (B37 and laydown/employee parking) - parking and laydown area access route has certain areas with rock and geotextile berms to prevent runoff from leaving the construction area into Micron employee parking. - storm drain inlet protection on all receiving inlets. Stormwater is retained onsite at Micron. - lined concrete washouts - large covered dumpsters - containers for material and equipment storage prevent exposure to rain - spill kits located in various locations around site. - water trucks onsite to keep down dust.
No violations observed. Site is clean, BMPs are installed correctly, site is inpsected regularly. No correction requests at this time, Micron projects are currently in compliance.
|
ESC18-00006
| General Inspection | 10/2/2018 | 10/4/2018 | 10/4/2018 1:07:24 PM | A | PASS |
|
|
9 AM wth Brian Terry and Susan Beesley, Micron environmental compliance division. Inspection conducted by ESC Inspectors Long and Zawacki
Micron SWPPP inspection of all construction projects with earth disturbance and use of staging and laydown areas. The CUP, Nitrogen plant, and B37 are under construction. B37 parking lots should be paved before end of month. Interior work is still occuring on Fab 51. Pathway is in progress around perimeter of site. Parking lot expansion at the MASK building on Columbia.
SWPPP inspections are conducted weekly by Micron stormwater team as well as contractors (Air Products, ESI, Stock, Warner) . SWPPP binders, site maps, and inspection reports were available for review and are well organized and complete.
Light rain and wind at time of inspection.
BMPs installed: - construction trackout control with rock and rumble bars for both access points (B37 and laydown/employee parking) - parking and laydown area access route has certain areas with rock and geotextile berms to prevent runoff from leaving the construction area into Micron employee parking. - storm drain inlet protection on all receiving inlets. Stormwater is retained onsite at Micron. - lined concrete washouts - large covered dumpsters - containers for material and equipment storage prevent exposure to rain - spill kits located in various locations around site. - water trucks onsite to keep down dust.
No violations observed. Site is clean, BMPs are installed correctly, site is inpsected regularly. No correction requests at this time, Micron projects are currently in compliance.
|
ESC18-00251
| General Inspection | 10/2/2018 | 10/4/2018 | 10/4/2018 1:07:06 PM | A | PASS |
|
|
9 AM wth Brian Terry and Susan Beesley, Micron environmental compliance division. Inspection conducted by ESC Inspectors Long and Zawacki
Micron SWPPP inspection of all construction projects with earth disturbance and use of staging and laydown areas. The CUP, Nitrogen plant, and B37 are under construction. B37 parking lots should be paved before end of month. Interior work is still occuring on Fab 51. Pathway is in progress around perimeter of site. Parking lot expansion at the MASK building on Columbia.
SWPPP inspections are conducted weekly by Micron stormwater team as well as contractors (Air Products, ESI, Stock, Warner) . SWPPP binders, site maps, and inspection reports were available for review and are well organized and complete.
Light rain and wind at time of inspection.
BMPs installed: - construction trackout control with rock and rumble bars for both access points (B37 and laydown/employee parking) - parking and laydown area access route has certain areas with rock and geotextile berms to prevent runoff from leaving the construction area into Micron employee parking. - storm drain inlet protection on all receiving inlets. Stormwater is retained onsite at Micron. - lined concrete washouts - large covered dumpsters - containers for material and equipment storage prevent exposure to rain - spill kits located in various locations around site. - water trucks onsite to keep down dust.
No violations observed. Site is clean, BMPs are installed correctly, site is inpsected regularly. No correction requests at this time, Micron projects are currently in compliance.
|
ESC18-00616
| General Inspection | 10/2/2018 | 10/4/2018 | 10/4/2018 1:06:50 PM | A | PASS |
|
|
9 AM wth Brian Terry and Susan Beesley, Micron environmental compliance division. Inspection conducted by ESC Inspectors Long and Zawacki
Micron SWPPP inspection of all construction projects with earth disturbance and use of staging and laydown areas. The CUP, Nitrogen plant, and B37 are under construction. B37 parking lots should be paved before end of month. Interior work is still occuring on Fab 51. Pathway is in progress around perimeter of site. Parking lot expansion at the MASK building on Columbia.
SWPPP inspections are conducted weekly by Micron stormwater team as well as contractors (Air Products, ESI, Stock, Warner) . SWPPP binders, site maps, and inspection reports were available for review and are well organized and complete.
Light rain and wind at time of inspection.
BMPs installed: - construction trackout control with rock and rumble bars for both access points (B37 and laydown/employee parking) - parking and laydown area access route has certain areas with rock and geotextile berms to prevent runoff from leaving the construction area into Micron employee parking. - storm drain inlet protection on all receiving inlets. Stormwater is retained onsite at Micron. - lined concrete washouts - large covered dumpsters - containers for material and equipment storage prevent exposure to rain - spill kits located in various locations around site. - water trucks onsite to keep down dust.
No violations observed. Site is clean, BMPs are installed correctly, site is inpsected regularly. No correction requests at this time, Micron projects are currently in compliance.
|
ESC17-01488
| BMP Violation | 10/4/2018 | 10/4/2018 | 10/4/2018 12:34:32 PM | A | FAIL |
|
|
No construction entrance or designated access for deliveries or employee parking. Need to designate a parking area and location for heavy duty construction entrance. Currenly parking in dirt/mud along shoulder of road.
|
ESC18-00896
| General Inspection | 10/2/2018 | 10/4/2018 | 10/4/2018 12:29:33 PM | A | PASS |
|
|
Bike shelter is complete. ESC permit finaled.
|
ESC18-00896
| DOC - Permit Finaled | 10/4/2018 | 10/4/2018 | 10/4/2018 12:29:10 PM | P | PASS |
|
|
|
ESC16-01472
| General Inspection | 10/4/2018 | 10/4/2018 | 10/4/2018 10:47:17 AM | A | PASS |
|
|
Rainfall inspection.
No runoff from site to Logan. BMPs installed, no trackout.
|
ESC17-01384
| Aging Inspection | 10/4/2018 | 10/4/2018 | 10/4/2018 10:19:37 AM | | PASS |
|
|
|
ESC17-01384
| DOC - Permit Finaled | 10/4/2018 | 10/4/2018 | 10/4/2018 10:19:30 AM | P | PASS |
|
|
|
ESC18-00659