ESC16-01088
| General Inspection | 9/20/2016 | 10/5/2016 | 10/7/2016 3:23:56 PM | A | CANC |
|
|
|
ESC16-00414
| General Inspection | 10/5/2016 | 10/5/2016 | 10/7/2016 10:39:59 AM | | PASS |
|
|
Fraing in progress. No trackout, no discharges or runoff occuring. Approved.
|
ESC16-00406
| General Inspection | 10/5/2016 | 10/5/2016 | 10/6/2016 4:11:05 PM | | CANC |
|
|
|
ESC15-01643
| Aging Inspection | 10/5/2016 | 10/5/2016 | 10/6/2016 4:10:48 PM | | CANC |
|
|
|
ESC16-00225
| General Inspection | 10/4/2016 | 10/5/2016 | 10/6/2016 12:33:12 PM | P | PEND |
|
|
Active work on preparation to pave road. No hills controls installed at this time but crews rushing to finish paving and connection to storm water infrastructure.
Verbal correction request to sweep entrances at Trent Point and Windsong. RP out of town, follow up inspeciton scheduled for early next week.
|
ESC16-00288
| General Inspection | 10/5/2016 | 10/5/2016 | 10/6/2016 11:43:54 AM | | PART |
|
|
Permit sign posted, down hill MS4 inlet on Windsong has sediment filter bags installed. Sidewalk, street and gutter have been swept though stain from concrete truck is visible. Needs further sweeping.
Perimeter control wattles installed at edge of pavement and on down hill side of lot. Concrete washout was utilized.
Correction request: sweep up sediment and rocks in gutter, work on spill clean up.
|
ESC16-00438
| Aging Inspection | 10/5/2016 | 10/5/2016 | 10/6/2016 8:30:23 AM | | CANC |
|
|
|
ESC16-00332
| Aging Inspection | 10/5/2016 | 10/5/2016 | 10/6/2016 8:30:10 AM | | CANC |
|
|
|
ESC16-00426
| General Inspection | 10/5/2016 | 10/5/2016 | 10/5/2016 12:04:20 PM | | PASS |
|
|
Tenant improvement complete. Building materials cleaned up, no temp BMPs remaining. All permits finaled.
|
ESC16-00082
| DOC - Permit Finaled | 10/5/2016 | 10/5/2016 | 10/5/2016 11:51:05 AM | P | PASS |
|
|
|
ESC13-01279
| General Inspection | 10/5/2016 | 10/5/2016 | 10/5/2016 11:03:34 AM | | PASS |
|
|
WIP on central SFHs. BMPS installed. Trash and materials are contained. A new washout facility has been provided as requested since the old washout is now full. This washout is used for HH projects in DHE as well.
No trackout, fugitive dust, or other issues. WIP. Approved.
|
ESC16-00276
| General Inspection | 10/5/2016 | 10/5/2016 | 10/5/2016 10:27:52 AM | | CANC |
|
|
|
ESC16-00384
| General Inspection | 10/5/2016 | 10/5/2016 | 10/5/2016 10:25:36 AM | | PASS |
|
|
Access lanes are now paved. Working on apron entrance in ROW on Victory. No fugitive dust, discharges or trackout. No corrections requested, WIP
|
ESC16-00422
| Aging Inspection | 10/5/2016 | 10/5/2016 | 10/5/2016 9:38:10 AM | | PASS |
|
|
Project complete. ESC conditions satisfied.
|
ESC16-00422
| DOC - Permit Finaled | 10/5/2016 | 10/5/2016 | 10/5/2016 9:37:48 AM | P | PASS |
|
|
|
ESC16-00427
| General Inspection | 10/5/2016 | 10/5/2016 | 10/5/2016 9:35:09 AM | | PASS |
|
|
Bridge construction complete. Walking path also installed. Permit open for re-vegetation and final stabilization. Silt fence needs to be removed. Project associated to ESC16-00156 for Peppermill Estates phase II.
|
ESC16-00169
| Aging Inspection | 10/5/2016 | 10/5/2016 | 10/5/2016 9:14:26 AM | | CANC |
|
|
|