ESC16-00708
| General Inspection | 10/4/2016 | 10/6/2016 | 10/7/2016 3:52:38 PM | P | PASS |
|
|
Permit posted on Ada. Stockpile within vegetated flat yard and gravel parking area. RP familiaer with ESC condtions. No DI bag requested at this time
|
ESC13-00707
| General Inspection | 10/6/2016 | 10/6/2016 | 10/7/2016 3:36:01 PM | | PASS |
|
|
|
ESC16-00305
| Aging Inspection | 10/6/2016 | 10/6/2016 | 10/7/2016 12:04:13 PM | | PASS |
|
|
Project in final stages of completion. Additional site work may remain, ESC can be finaled with BLD
|
ESC15-00699
| General Inspection | 10/6/2016 | 10/6/2016 | 10/7/2016 11:43:24 AM | | PASS |
|
|
Pool is installed and surrounding area patio and landscaping installed. BLD open pending safety final requests. No further construction on pool, apartment building work is still in progress and covered under main ESC permit ESC15-00504
|
ESC15-00893
| General Inspection | 10/6/2016 | 10/6/2016 | 10/7/2016 11:36:27 AM | | PASS |
|
|
Retail center complete and surrounding area is lanscaped and stabilized. New storm drains for the Kensington/North Pointe complex has sediment filters installed due to active residential construction. BLD finaled, no further ESC actions required..
|
ESC16-00344
| Aging Inspection | 10/6/2016 | 10/6/2016 | 10/7/2016 11:25:06 AM | | PASS |
|
|
WIP. NO trackout to Pierce Park. No discharges or spills observed. Trash and materials contained on site.
|
ESC16-00444
| Aging Inspection | 10/6/2016 | 10/6/2016 | 10/7/2016 10:40:36 AM | | CANC |
|
|
|
ESC15-01629
| General Inspection | 10/6/2016 | 10/6/2016 | 10/6/2016 4:10:21 PM | | CANC |
|
|
|
ESC16-00440
| Aging Inspection | 10/6/2016 | 10/6/2016 | 10/6/2016 4:09:36 PM | | DONE |
|
|
Project completed in June, not finaled with BLD finaled. No ESC issues
|
ESC16-00440
| DOC - Permit Finaled | 10/6/2016 | 10/6/2016 | 10/6/2016 4:08:39 PM | P | PASS |
|
|
|
ESC16-00042
| Aging Inspection | 10/6/2016 | 10/6/2016 | 10/6/2016 4:08:09 PM | | CANC |
|
|
|
ESC16-00793
| Conference | 10/6/2016 | 10/6/2016 | 10/6/2016 3:52:02 PM | P | PASS |
|
|
Parks and Rec crew cheif Levi provided project update that a field renovation project is in progreess at Willow Lane Sports Complex. BMPs wiill include inlet protection on receiving storm drains within park. Temporary stockpiles will be hauled away and swept up at close of project.
phone ###-####
|
ESC15-01288
| General Inspection | 10/6/2016 | 10/6/2016 | 10/6/2016 1:21:55 PM | | PASS |
|
|
Roads and infrastructure are now installed. WIP on prepping areas for SFH parcels. No hydroseed or tackifier on central drainage area. RP stated that stabilization, erosion controls are to be implemented over the next few weeks. Will continue to monitor, no corrections at this time.
|
ESC16-00561
| General Inspection | 10/4/2016 | 10/6/2016 | 10/6/2016 12:36:49 PM | P | PEND |
|
|
No fugitive dust occuring at time of inspection. Street , sidewalk and gutter are free of loose sediment or trackout.
Silt fence installation at around the lower edges of site has not yet been accomplished.
|
ESC15-00094
| General Inspection | 10/6/2016 | 10/6/2016 | 10/6/2016 12:30:23 PM | | PASS |
|
|
No new subdivision activity on this phase. No hillside erosion or runoff issues occuring. Unbuilt lots have vegetative stabilization. Several SFHs active at top of Windsong & Echo Ct as BH phase # 6 construction.
|
ESC16-00683
| General Inspection | 10/6/2016 | 10/6/2016 | 10/6/2016 11:57:13 AM | A | PART |
|
|
WIP on roof. Down hill silt fence and slope undisturbed. Permit posted and trash contained. Correction request: - sweep gutter, install new filter mat or DI bag on storm drain - install rain gutter down spouts asap to prevent concentrated runoff.
Verbal request to RP and site walk around with site supervisor.
|
ESC15-01091
| General Inspection | 10/6/2016 | 10/6/2016 | 10/6/2016 11:45:05 AM | | PASS |
|
|
No activity at site. Foundation has been built but no other work. Perimeter wattle installed and no sediment running off site.
|
ESC16-00329
| General Inspection | 10/6/2016 | 10/6/2016 | 10/6/2016 11:36:07 AM | | PASS |
|
|
|
ESC16-00853
| Site Preparation | 10/5/2016 | 10/6/2016 | 10/6/2016 11:29:15 AM | A | PASS |
|
|
Onsite inspection with RP Justin. Permit sign posted, site plan available. Perimeter wattle and vegetative buffer to remain installed throughout construction to the south, New wattle to be installed on east side to treat any sheet flow that may occur. Lot is below grade of sidewalk.
Construction entrance to be installed after foundation excavation. Requested that backfill stockpile be flattened to reduce wind blown dust.
DI sediment mat installed, requesting maintenance from active project ESC16-00683
|
ESC15-01552
| General Inspection | 10/6/2016 | 10/6/2016 | 10/6/2016 9:04:42 AM | | PASS |
|
|
WIP on interior. Exterior, parking lot paving and landscaping are installed and disturbed area stabilized. Interior work and ongoing equipment and material stagiing is occuring. No violations observed at time of inspection.
|
ESC16-00305
| DOC - Permit Finaled | 10/6/2016 | 10/6/2016 | 10/6/2016 8:33:22 AM | P | PASS |
|
|
(This activity was added in error so we have changed the case status back to Issued.)
|