Inspections for the day of: Monday, October 8, 2018.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00508 Aging Inspection10/8/201810/8/201810/9/2018 4:02:14 PM CANC
ESC16-01706 General Inspection10/8/201810/8/201810/9/2018 3:52:15 PM PASS
No trackout or discharges from site. Parking lot paved, frontage landscaping has been initiated.
ESC16-01650 General Inspection10/8/201810/8/201810/9/2018 1:24:09 PM PASS
ESC13-01279 General Inspection10/8/201810/8/201810/9/2018 11:58:33 AM PASS
WIP on NW corner units. No trackout or muddy runoff occuring during rain event.
ESC17-00078 General Inspection10/8/201810/8/201810/9/2018 10:55:35 AM FAIL
Significant amount of soil being eroded into subdivision storm drain, many inlets are over whelmed and sediment bags unable to treat water. No perimeter BMPs or water diversions.

Need to determine location of discharge from large borrow ditch.

Verbal correction to Syman and BlackRock Homes
ESC17-01488 Tracking Control10/8/201810/8/201810/8/2018 4:09:13 PMPPEND
No trackout at site. Did entrance inspection with project supervisor Bryce. Reviewed installation specifications and noted they will need to consider location for employees to park without causing trackout. Temporary 3/4 mix placed at the southeast/east entrance onto Federal Way.

Site is to supposed to be paved before the end of the month. Will follow up this week after rainfall.
ESC17-01632 General Inspection10/5/201810/8/201810/8/2018 2:59:47 PMAPART
follow up

No trackout or discharges, permit posted and RP on dust. Some fugitive dust is being kicked up on haul road. Construction entrance is getting packed in.

Correction request:
- apply water to haul road to reduce dust
- roughen up consruction entrance and/or add more rock.
- Need to install rock at any access point where vehicles exit the site.

Verbal
ESC17-01196 BMP Violation10/8/201810/8/201810/8/2018 2:41:44 PMPFAIL
Silt fence BMP needs maintenance. Some areas have fallen over, been undercut, and some are no longer trenched.

Correction request to remove damaged silt fence, clean up area where some dirt has accumulated in the gutter, and install alternative BMPs in this area, ie erosion control blankets, perimeter wattle, and/or gravel check bags in gutter on Santa Maria.

Verbal correction to RP-GC Matt
ESC18-00946 Conference10/8/201810/8/201810/8/2018 2:38:22 PMPDONE
Onsite conference with RP GC to discuss ESC plan and site inspections during rainfall. The receiving water for this project is Crane Creek, a tributary to the Boise River in addition to being a hillside site with steep slopes.

Corrections:
- RP to add additional gravel snake bags in gutter in front of site
- noted that the wattle will need to be re-installed after the excavator can complete earthwork on slope below driveway. Wattles must be trenched in at a minimum 2-3 ", staked every 5 ft, and have overlapping ends. Slope interupting wattle will be installed mid slope between driveway and toe of slope.
- berm to prevent water flowing over the steep slope
- RP to conduct site inspections during rainfall.

Site is currently well swept, no discharges or trackout. Will need to continue to work on wattle installations.
ESC18-00521 Random Inspection10/8/201810/8/201810/8/2018 11:58:45 AMPPASS
ESC16-00938 Random Inspection10/8/201810/8/201810/8/2018 11:58:21 AMPPASS
No sediment runoff on sidewalk. Wattles installed at bottom of slope that was disturbed. No corrections.
ESC18-00363 General Inspection10/8/201810/8/201810/8/2018 11:57:37 AMPPASS
WIP. Site fenced in, perimeter vegetation preserved. No trackout, discharges, or loose trash
ESC17-01464 Site Final10/8/201810/8/201810/8/2018 10:52:27 AMAPASS
All Idaho Street Townhomes are complete. Site is cleaned, landscaped, and no temporary BMPs or consruction materials left on site or in receivin storm drains. ESC permit conditions satisfied.
ESC17-00491 General Inspection10/8/201810/8/201810/8/2018 8:14:14 AM CANC
ESC17-00454 General Inspection10/8/201810/8/201810/8/2018 8:10:00 AM CANC
ESC17-00455 General Inspection10/8/201810/8/201810/8/2018 8:08:50 AM CANC