Inspections for the day of: Tuesday, November 1, 2016.
Number of inspections: 27
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC16-00290 Aging Inspection11/1/201611/1/201611/3/2016 10:01:56 AM CANC
ESC15-00378 General Inspection11/1/201611/1/201611/2/2016 9:45:49 AM CANC
hillside revegetation occuring. BLD finaled, home occupied. No inspection
ESC16-00168 General Inspection11/1/201611/1/201611/2/2016 9:34:58 AM CANC
ESC16-00285 Aging Inspection11/1/201611/1/201611/2/2016 9:21:28 AM CANC
ESC16-00203 Aging Inspection11/1/201611/1/201611/2/2016 8:05:28 AM CANC
ESC16-01457 BMP Violation11/1/201611/1/201611/1/2016 12:41:30 PMPFAIL
Corrections requested:

Sweep up loose sediment and sand on sidewalk.

Install sediment control wattle along base of road

Post yellow permit sign provided during site preparation inspeciton.


MIS16-00269 ESC-Conference11/1/201611/1/201611/1/2016 12:31:09 PMPDONE
ground work being done without a permit

ESC permit issued. Corrections issued under this permit, see ESC16-01457
ESC16-00159 General Inspection11/1/201611/1/201611/1/2016 11:59:25 AM PART
Multiple SFHs active at once. DIs have sediment protection and

Corrections needed:

- remove plastic sheeting used in Warm Springs Creek south of Parkcenter Blvd
- close access to Parkckenter from unfinished portion of Millbrook. Causing trackout on both sides sob.
ESC16-00185 Aging Inspection11/1/201611/1/201611/1/2016 11:43:19 AM PASS
Home complete, landscaped and occupied. No corrections needed. BLD finaled. No temp BMP removal due to active construction in RH#6
ESC16-00185 DOC - Permit Finaled11/1/201611/1/201611/1/2016 11:42:40 AMPPASS
ESC16-00958 Random Inspection11/1/201611/1/201611/1/2016 11:37:25 AMAPASS
WIP on frame and interior. Sidewalk and street are very clean, no trackout or sediment runoff. Trash and materials contained. No corrections.
ESC16-00841 Random Inspection11/1/201611/1/201611/1/2016 11:36:34 AMAPASS
WIP on foundation. No activity at time of inspection. No significant trackout. Wattles along bottom of site installed, permit posted.
ESC15-00729 General Inspection11/1/201611/1/201611/1/2016 11:25:33 AM PASS
No grading or earthwork occuring. No SFHs yet in Harris North.

No significant hillside erosion observed or reported by site SWPPP team. No sediment runoff issues found on roads or at storm water facilities. Council Spring Creek BMPs in good condition. No surface flow.

No corrections at this time, site BMPs and hillside stabilization has held up during the recent precipitation and is allow vegetation to grow.
ESC16-00286 Aging Inspection11/1/201611/1/201611/1/2016 11:12:46 AM CANC
ESC16-01308 Site Preparation11/1/201611/1/201611/1/2016 11:07:17 AMPPASS
Brett Phone #: ###-####


Peppermill BMPs installed. RP requested new concrete washout for upcoming concrete and foundation work. Subdivision to be inspected 11/2. Approved to start
ESC16-01008 Site Preparation11/1/201611/1/201611/1/2016 11:06:55 AMPPASS
Brett Phone #: ###-####

Peppermill BMPs installed. RP requested new concrete washout for upcoming concrete and foundation work. Subdivision to be inspected 11/2. Approved to start
ESC16-01218 Site Preparation11/1/201611/1/201611/1/2016 11:05:19 AMPPASS
Tracey Phone #: ###-####

Subdivision BMPs for Dropzone installed. No onsite inspeciton conducted at this time. Approved for construction.
ESC15-01391 General Inspection11/1/201611/1/201611/1/2016 11:04:14 AM PASS
ESC16-00288 General Inspection11/1/201611/1/201611/1/2016 11:00:42 AMAPASS
WIP. ESC foreman on site sweeping regularly and checking BMPs. Perimeter wattle installed, rock construction entrance provided. Approved.
ESC16-00990 General Inspection11/1/201611/1/201611/1/2016 10:58:56 AMAPASS
Permit sign posted. No activity for home construction, driveway footprint and rock installed. No sediment runoff from site. No erosion rills observed on upper portion below previously disturbed area. No corrections at this time.
ESC14-00787 General Inspection11/1/201611/1/201611/1/2016 10:18:37 AM PASS
City Center Plaza structure complete. Final ESC corrections (remove DI bag on Main & 8th, sweep and clean Capitol sidewalk and garage apron) requested and covered under main site ESC permit ESC14-00296. This permit finaled.
ESC16-01354 Site Preparation10/31/201611/1/201611/1/2016 10:06:10 AMAPASS
Robert Phone #: ###-####

Initial BMPs installed including new MS4 inlet protection and perimeter wattle. ESC permit sign posted on 11th Street entrance. Extra signage provided for 13th Street.

Employee parking and Alta staging area in process of being set up and will have gravel rock base to keep mud down.

RP Robert stated that working on building a stabilized access road through site for loading and concrete truck traffic. Exit on 13th will have rock trackout pad and/or rumble. Exit to be graded to not slope out to street as it currently is. Lined concrete washout pit will also be installed prior to any concrete work.

RP to call for follow inspection for stabilized construction entrance(s) and washout facility. Water from the pit will be sucked out and put into Eco-Pans for appropriate disposal.

Dewatering not scheduled to occur till Spring per Robert, will continue to monitor.

CGP tracking # IDR12AW61, active status
ESC14-00544 Site Final11/1/201611/1/201611/1/2016 9:56:52 AMPPASS
Staging area materials removed. New construction site now active and covered under ESC16-01354
ESC15-00453 General Inspection11/1/201611/1/201611/1/2016 8:10:48 AM CANC
ESC15-01343 General Inspection11/1/201611/1/201611/1/2016 8:05:47 AM CANC
ESC14-00432 General Inspection11/1/201611/1/201611/1/2016 8:05:03 AM CANC
ESC15-01296 DOC - Permit Finaled11/1/201611/1/201611/1/2016 8:03:14 AMPPASS