PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Wednesday, November 1, 2017
.
Number of inspections:
8
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC15-00729
General Inspection
11/1/2017
11/1/2017
11/3/2017 4:24:08 PM
CANC
ESC16-00225
General Inspection
10/31/2017
11/1/2017
11/2/2017 4:30:00 PM
A
PEND
No new subdivision activity. Slopes are vegetatated, permanent stormwater facilities are installed and operational.
Need to address stockpiles east of Trent and to install erosion controls on slope above the new stormwater basin below Trent Point.
ESC16-00242
General Inspection
10/30/2017
11/1/2017
11/2/2017 3:06:41 PM
P
CANC
ESC16-01453
Aging Inspection
11/1/2017
11/1/2017
11/2/2017 3:06:18 PM
CANC
ESC16-01447
Aging Inspection
11/1/2017
11/1/2017
11/1/2017 3:28:34 PM
CANC
ESC15-00541
General Inspection
11/1/2017
11/1/2017
11/1/2017 2:52:41 PM
CANC
ESC16-01027
Complaint Inspection
11/1/2017
11/1/2017
11/1/2017 12:22:50 PM
P
FAIL
dust complaints received about the Cottage @ White Clouds
Check for water truck and confirm RP's presence and role for project.
No earthwork or dust at time of inspection. Other ESC corrections needed:
- post City of Boise ESC signs, one at east and west entrances or in clear visible location
- need new concrete washout, clean up old washout area
- sweep all gutters and aprons
ESC17-00426
General Inspection
11/1/2017
11/1/2017
11/1/2017 11:44:56 AM
A
PEND
Dewatering still ongoing for sewer installation.
System modification on Tuesday 10/31 did not work due to outlet manhole being at higher elevation that other irrigation line outlets.
Outlet pipe is blocked and pump has been inserted in manhole to suck water out and discharge to Millwell phase II stormwater infiltration pond.
Some turbid discharges still occuring at outlet to Spoil Banks Canal. Turbidity testing directly at outlet had 260 NTU.
Once pump started, flow out of outlet nearly stopped completely, water is being discharged to pond was clear, but does have occassional high turbidity levels due to activity in trench and in onsite ditch/settling area.
Do not think further discharges will occur due to capacity of pond.