PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, November 13, 2018
.
Number of inspections:
17
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC18-00998
General Inspection
11/13/2018
11/13/2018
11/15/2018 11:33:34 AM
P
PASS
washout cleaned up. Sediment protection installed on storm drain. No new corrections needed. Site is back in compliance.
ESC17-01693
General Inspection
11/13/2018
11/13/2018
11/14/2018 2:40:04 PM
CANC
ESC17-00013
General Inspection
11/13/2018
11/13/2018
11/14/2018 2:39:50 PM
CANC
ESC17-01491
General Inspection
11/13/2018
11/13/2018
11/14/2018 2:38:20 PM
PEND
ESC18-01114
BMP Violation
11/13/2018
11/13/2018
11/14/2018 10:02:32 AM
P
PEND
excavator Angel
Carmen c Bellman
Sunroc
ESC17-00190
Site Preparation
11/8/2018
11/13/2018
11/14/2018 8:14:26 AM
A
CANC
ESC18-01063
Conference
11/13/2018
11/13/2018
11/13/2018 4:25:54 PM
P
PEND
Will either re-issue the original ESC permit for Crescent Rim bldg #1 (ESC06-01306) or add the new permit fee to this permit and transfer into ESI's name.
GRD18-00083
GRD-Other
11/13/2018
11/13/2018
11/13/2018 3:24:31 PM
P
PASS
Requesting ESC inspection with Andy Long at 3pm Phone #: ###-#### Inspection requested via web by Jared Waggoner
See ESC18-01466 for ESC site prep inspection
ESC18-01466
Site Preparation
11/13/2018
11/13/2018
11/13/2018 3:24:03 PM
P
PASS
Jared RP 3:00 PM site walk through
Construction entrance installed with lining and thick layer of rock. Some of it is not angular, reviewed construction specs with RP. Will refresh as needed.
Sediment protection installed on east side of Benjamin in front of site. Site appears to have positive slopes back into center of site, so no silt fence or wattle is required at this time. RP stated they will utilize an Ecopan washout when they are ready for foundation work.
This ESC permit can cover the GRD and forthcoming BLD permit for this project.
ESC17-01409
Aging Inspection
11/13/2018
11/13/2018
11/13/2018 1:40:16 PM
CANC
No activity on BLD for over 11 months. Check to close ESC permit scheduled
ESC18-01266
General Inspection
11/13/2018
11/13/2018
11/13/2018 11:31:58 AM
A
PASS
Trash contained, permit posted. No trackout or discharges. Approved.
ESC17-01688
General Inspection
11/13/2018
11/13/2018
11/13/2018 11:29:58 AM
PASS
WIP on vertical construction for condos. Site imporovements and new sidewalks going in on ROW on Ash and River. Storm drains have sediment protection. No trackout or discharges observed.
ESC17-01687
General Inspection
11/13/2018
11/13/2018
11/13/2018 11:29:38 AM
PASS
WIP on vertical construction for condos. Site imporovements and new sidewalks going in on ROW on Ash and River. Storm drains have sediment protection. No trackout or discharges observed.
ESC18-01106
Random Inspection
11/13/2018
11/13/2018
11/13/2018 10:55:37 AM
P
PASS
WIP on new detached garage and studio in alley. Permit posted in alley. Site contained
ESC18-00106
Random Inspection
11/13/2018
11/13/2018
11/13/2018 10:55:01 AM
P
PASS
ESC18-00754
General Inspection
11/13/2018
11/13/2018
11/13/2018 10:23:44 AM
P
PASS
No new work. Permit is posted on fence, silt fence installed to contain stockpiles stored on lot, there is a irrgation lateral behind fence. Construction entrance installed. No SFH permit package submitted yet. No corrections
ESC18-00492
General Inspection
11/13/2018
11/13/2018
11/13/2018 10:12:16 AM
A
PASS
WIP on frame. No trackout, permit posted. Storm drain to west of entrance on Rose Hill and storm drain south of site on Franklin have sediment protection installed. Perimeter barricades and wattles keeping site contained.