Inspections for the day of: Wednesday, November 13, 2019.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC17-00842 Complaint Inspection11/13/201911/13/201911/21/2019 2:39:41 PMPPEND
potential fuel spill/unauthorized work reported

work was for geotechnical exploration.
ESC19-00324 Conference11/13/201911/13/201911/18/2019 8:43:34 AMPDONE
Site walk through and winter stabilization conference conducted. Site is planning to complete paving with curb and gutter before Thanksgiving. Mass grading is complete, slopes have been tracked and top soil spread back on slopes

Action items/correction requests

- repair/re-install perimeter silt fence.
- extend silt fence below disturbed slope next to Teresa (up hill from subdivsion entrance)
- hydroseeding and mulch cover should be applied to all slopes ASAP. Request to order materials and seed mix to be ready
- install slope diversion berm at the top of slopes to prevent runoff from flowing over the slope
- once road is paved, and silt fence re-installed Teresa needs to be swept and the storm drain sediment bag removed to prevent clogging

Follow up on site after road paving for additional winterization controls
ESC18-00925 Aging Inspection11/13/201911/13/201911/15/2019 4:28:03 PM CANC
ESC18-01002 General Inspection11/13/201911/13/201911/14/2019 1:30:56 PM PEND
No material leaving site.

Inquuired with RP Doug as to fate of lot and permit. Construction has been halted.

Request to remove pile of discard styrofoam forms and notified that there is a large pallet of unused wattles on the site, and an RV with a Code Enforcement notice on it.
ESC19-00995 Site Final11/13/201911/13/201911/14/2019 8:24:45 AMPCANC
ESC18-00866 Site Final11/12/201911/13/201911/13/2019 3:09:24 PMPPASS
send email to Mark to verify permit is closed

Temporary BMP storm drain sediment bag on Targee has been removed as requested. ESC permit finaled. Okay for BLD final when requested.
ESC19-00181 General Inspection11/13/201911/13/201911/13/2019 2:35:58 PMPFAIL
No trackout, concrete washout pan is being utilized. RP on duty. Stockpiles are actiive. North end of site access roads are pit run; south side will be completed next week .

Corrections needed:

- need to stabilize employee parking lot ASAP, before wet season
- need to remove leaking hoist parked at the entrance and do spill clean-up
ESC19-00186 General Inspection11/13/201911/13/201911/13/2019 2:33:08 PM PASS
See ESC19-00181 for site details and correction requests
ESC19-00185 General Inspection11/13/201911/13/201911/13/2019 2:32:59 PM PASS
See ESC19-00181 for site details and correction requests
ESC19-00184 General Inspection11/13/201911/13/201911/13/2019 2:32:49 PM PASS
See ESC19-00181 for site details and correction requests
ESC19-00183 General Inspection11/13/201911/13/201911/13/2019 2:32:39 PM PASS
See ESC19-00181 for site details and correction requests
ESC19-00182 General Inspection11/13/201911/13/201911/13/2019 2:32:28 PM PASS
See ESC19-00181 for site details and correction requests
ESC18-01213 DOC - Permit Finaled11/13/201911/13/201911/13/2019 11:27:05 AMPPASS
ESC18-01442 Aging Inspection11/13/201911/13/201911/13/2019 8:15:39 AM CANC
ESC18-01442 DOC - Permit Finaled11/13/201911/13/201911/13/2019 8:15:28 AMPPASS
ESC18-01730 General Inspection11/13/201911/13/201911/13/2019 8:13:58 AM CANC