ESC18-00069
| Site Final | 11/8/2018 | 11/14/2018 | 11/15/2018 2:24:05 PM | P | PASS |
|
|
Work complete. No temporary sediment controls left in work areas along 8th Street, Freak Alley, Union Alley, and Capitol Blvd. ESC permit finaled
|
ESC18-01121
| General Inspection | 11/14/2018 | 11/14/2018 | 11/14/2018 4:23:04 PM | P | PASS |
|
|
WIP on compaction and preparation for foundations in dewatered river channel between cofferdams. River bottom material and concrete chunks have been removed. Water returning to the River from diversion pipe and well heads in channel is clear and was not churning up sediment at discharge point.
At upriver end of project the future channel to establish the habitat island is starting to be excavated. The material is then being hauled for fill into Veterans Pond along the canal side & future pathway route.
The area of fill at Veterans Pond has a turbidity curtain containment. A slight murkiness of the water leaving the pond and joining the diverted river water in Farmers Union was observed. Turbidity test at 12:45 today showed 28.4. Turbidity log was availalbe upon request. The result is above background levels but not above the 50 NTU limit. Samples taken in previous days were below 5.0 NTU. No visible plume was seen with the river water in Farmer's Union.
Other BMPs observed were secondary spill containment areas in staging yard and water truck working the haul routes to keep dust down.
|
ESC17-01285
| Aging Inspection | 11/14/2018 | 11/14/2018 | 11/14/2018 2:39:19 PM | | CANC |
|
|
rescheduled for site final
|
ESC17-00836
| General Inspection | 11/14/2018 | 11/14/2018 | 11/14/2018 2:38:40 PM | | CANC |
|
|
|
ESC17-01720
| General Inspection | 11/14/2018 | 11/14/2018 | 11/14/2018 10:17:12 AM | | PASS |
|
|
All permits finaled. No disturbed area or temp BMPs remaining. No corrections.
|
ESC17-01720
| DOC - Permit Finaled | 11/14/2018 | 11/14/2018 | 11/14/2018 9:42:55 AM | P | PASS |
|
|
|
ESC18-00280
| General Inspection | 11/14/2018 | 11/14/2018 | 11/14/2018 9:40:15 AM | P | PART |
|
|
Site is currently inactive. No trackout, discharges, or wind blown dust observed. No crews or equipment at site. Utilty and site work is complete, Silt fence perimeter along Ridenbaugh Canal is installed and in tact.
Correction needed: - pick up and contain loose trash scattered around the site. - update SWPPP inspection book
|
ESC18-00792
| General Inspection | 10/29/2018 | 11/14/2018 | 11/14/2018 9:36:58 AM | A | PASS |
|
|
Silt fence perimeter installed. No trackout to Dentron, stabilized entrance installed. Lined washout pit is nearby entrance/exit at corner of Curtis and Denton. Storm drains have sediment protection. No fugitive dust observed. WIP on foundations. No corrections requested.
|