Inspections for the day of: Thursday, November 14, 2019.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00995 General Inspection11/14/201911/14/201911/21/2019 4:37:06 PMPPASS
WIP on park improvements. Disturbed areas around pathways have been hydroseeded.

Turbidity curtain silt fence is installed and appears to be working, though there is no in-water activity and water is clear. No trackout from construction entrance/access

No corrections requested.
ESC18-01121 General Inspection11/14/201911/14/201911/18/2019 2:46:40 PM PASS
ESC18-00164 Conference11/13/201911/14/201911/18/2019 1:52:46 PMPDONE
Site walk through to plan for winterization and site stabilization.

Corrections needed:
- new rock construction entrances for winter access
- site will use some of the stockpile on site, reduce its height and have it sprayed with tacifier & mulch. May need additional perimeter sediment control around the pile.
- need to apply hydroseed/mulch mix to the finished slope on the east side of site as well as the rest of the slope areas within site (not all of it is tracked yet)
- Will put road mix down on roads and utilize the sites terraces to retain water on site. May open up access to the site's large seepage swale.
- install berms at top of any slopes to prevent runoff from going over disturbed slopes.

Follow up at site at end of week as work progresses.
ESC16-01560 General Inspection11/14/201911/14/201911/15/2019 4:27:40 PM CANC
ESC18-00760 General Inspection11/14/201911/14/201911/14/2019 1:57:08 PM CANC
ESC18-01644 BMP Violation11/14/201911/14/201911/14/2019 1:56:55 PMPFAIL
Dumped concrete washout.

Notified Chris, new GC on project, that re-inspection fee must be paid and washout dumped cleaned up. Parcel hold placed on lot until completed.
MIS19-00378 ESC-Conference11/14/201911/14/201911/14/2019 1:05:35 PMPCANC
ESC16-01457 General Inspection11/14/201911/14/201911/14/2019 12:04:01 PM PASS
ESC18-01235 BMP Violation11/14/201911/14/201911/14/2019 11:39:25 AMPFAIL
Corrections needed at site:

- pick up all loose trash around trash bin, across the street, and around the hillside below the home
- install perimeter wattle
- no construction entrance installed
- washout is obstructed and near full

Corrections need to be completed by next Wednesday PM

Notified superintendant Joey w/ Northern Construction.
ESC19-01166 General Inspection11/13/201911/14/201911/14/2019 8:35:30 AMPPEND
fees not yet paid. Parcel hold still in effect until re-inspection fee for dumped concrete washout is settled
ESC19-00189 General Inspection11/14/201911/14/201911/14/2019 8:34:15 AM PASS
see ESC19-00181 for Village East inspection notes and correction requests
ESC19-00188 General Inspection11/14/201911/14/201911/14/2019 8:34:01 AM PASS
see ESC19-00181 for Village East inspection notes and correction requests
ESC19-00187 General Inspection11/14/201911/14/201911/14/2019 8:33:48 AM PASS
see ESC19-00181 for Village East inspection notes and correction requests