Inspections for the day of: Tuesday, November 15, 2016.
Number of inspections: 37
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00541 General Inspection11/15/201611/15/201611/17/2016 4:45:33 PM PASS
ESC16-00948 General Inspection11/15/201611/15/201611/16/2016 2:55:28 PMPCANC
rescheduled
ESC16-00706 General Inspection11/15/201611/15/201611/16/2016 11:19:57 AMAPART
No site preparation inspection requested. No inlet protection installed.

Permit sign posted, no trackout or discharges. Clear to waive DI protection due to overflow potential from large drainage area from both directions of Hill Road.

Notified RP that Site Prep inspections are required for new SFHs regardless of location.
ESC15-01420 Conference11/15/201611/15/201611/16/2016 10:17:51 AMPPEND
follow up

Notified RP of issue with drainage pipe and erosion fill pipe with mud....awaiting schedule. Notified concerned party that the issue is in process of being resolved.
ESC16-01546 Site Preparation11/14/201611/15/201611/15/2016 3:28:24 PMPPASS
Permit sign posted. Housekeeping main BMP. Approved for construction
ESC16-00372 Aging Inspection11/15/201611/15/201611/15/2016 3:20:09 PM PASS
ESC16-00372 DOC - Permit Finaled11/15/201611/15/201611/15/2016 3:20:01 PMPPASS
ESC16-00592 DOC - Permit Finaled11/15/201611/15/201611/15/2016 3:19:07 PMPPASS
ESC13-00193 General Inspection11/15/201611/15/201611/15/2016 3:11:46 PM PEND
No issues on culdesac lots. Temporary access to backyards of Painter Rock homes still needs erosion and sediment controls installed. Home below access is not yet complete and backyard not yet landscaped...
ESC15-01256 General Inspection11/15/201611/15/201611/15/2016 3:07:51 PM PASS
Home complete, landscaped and occupied. BLD finaled. No ESC corrections needed, temporary BMPs in Somerset Village to remain while active construction on other lots is ongoing.
ESC15-01256 DOC - Permit Finaled11/15/201611/15/201611/15/2016 3:06:56 PMPPASS
ESC16-00614 DOC - Permit Finaled11/15/201611/15/201611/15/2016 3:02:48 PMPPASS
ESC15-00862 General Inspection11/15/201611/15/201611/15/2016 2:57:51 PM PEND
revegetation...no changes since prior inspeciton
ESC16-00936 Site Preparation11/14/201611/15/201611/15/2016 2:50:56 PMPPASS
2:00 PM Cleve Cushing ###-####

Approved for construction. Perimeter silt fence installed properly at bottom of lot. Permit sign and ESC plan on site. First phase will be to demolish/remove old concrete slab tennis court, then provide stabilized entrance.

Note: no DI protection to be installed to prevent clogs or unintentional re-routing of stormwater.

ESC15-01210 General Inspection11/15/201611/15/201611/15/2016 2:48:30 PM PASS
No activity. Erosion controls working well, no rills observed, no sediment leaving site. No corrections. NO SFH activity yet

ESC16-00935 Site Preparation11/14/201611/15/201611/15/2016 2:47:09 PMPPASS
2:00 PM Cleve Cushing ###-####

First phase of construction is to install permanent heavy duty fencing and stormwater swale at bottom of lot for drainage. Perimeter silt fence has been installed properly per ESC plan.

No DI protection to be installed due to slope of road and catchment area for storm drain. Do not want to overwhelm or clog inlets which could send stormwater over the hillside or onto existing property. RP Cleve to increase gutter and street sweeping frequency.

Approved for construction.
ESC16-00625 General Inspection11/15/201611/15/201611/15/2016 1:48:46 PMPPASS
No activity, site currently on hold due to natural seep/spring. Plans being developed to manage the water. Silt fence installed at bottom of lot, permit sign posted.
ESC15-01138 General Inspection11/15/201611/15/201611/15/2016 1:46:03 PMPPASS
WIP on framing and roof. Retaining walls have been installed. No erosion or sediment leaving bottom of site. No vehicle trackout or discharges to street. NO corrections at this time.
ESC15-00556 General Inspection11/15/201611/15/201611/15/2016 11:39:46 AM PASS
No new subdivsion devlopment activity. Lots in new phase have had drainage control earthen berms installed with intention to retain runoff on site. All inlets have sediment protection installed.
Tahoe Homes utilizing lined concrete washout pit.

No corrections requested.
ESC16-00120 Aging Inspection11/15/201611/15/201611/15/2016 11:35:35 AM PASS
ESC16-00267 Aging Inspection11/15/201611/15/201611/15/2016 11:34:10 AM PASS
Home complete, landscaped and construction materials and equipment removed. BLD finaled. No final ESC requests, permit conditions satisfied.
ESC16-00267 DOC - Permit Finaled11/15/201611/15/201611/15/2016 11:33:23 AMPPASS
ESC14-00657 Site Final11/15/201611/15/201611/15/2016 11:28:43 AMPNR
Corrections needed before ESC final:

1. Remove DI bags on Signal Rock at both intersections with Playwright
2. Sweep up concrete dust and loose sediment where the concrete wasshout pan was placed

3. Pick up wind blown construction and employee waste on south side of Warm Springs.



Note: all DI bags except the two on Playwright on both sides of the active SFHs by Alturas should remain.
ESC16-00810 Site Preparation11/14/201611/15/201611/15/2016 10:41:33 AMAPASS
Clint Phone #: ###-####


Project already active and near completion. Contractor intended for Public Works drainage inspection.

Provided PW Inspection # ###-####

No ESC issues. Approved.
ESC15-01224 General Inspection11/15/201611/15/201611/15/2016 10:14:30 AM PASS
WIP on Bown Library! branch. Site parking areas and pavers are installed. Impervious surfaces free of loose dirt/trackout. Liquid waste washout pans onsite. No ESC corrections neeeded
ESC15-01004 General Inspection11/15/201611/15/201611/15/2016 10:02:16 AMAPASS
Vertical construction in progress. Concrete washout/liquid waste containment pans utilized. Myrtle Street staging lane has been cleaned. No discharges. Permit sign /SWPPP info posted on Broad Street.
ESC15-01004 Site Final11/15/201611/15/201611/15/2016 9:59:11 AMPCANC
data entry error. WIP
ESC15-01193 Site Final11/15/201611/15/201611/15/2016 9:51:11 AMAPASS
Construction activity complete. Yard has been landscaped and hydroseeded. Home occupied. All permits finaled.
ESC15-01050 Site Preparation11/14/201611/15/201611/15/2016 9:41:48 AMAPEND
Tommy// please call before Phone #: ###-####

John ###-####

Need to check for approved plans for parking lot area at 11020 Joplin...
ESC07-00101 DOC - Permit Finaled11/15/201611/15/201611/15/2016 8:54:26 AMPPASS
old expired permit, no inspection
ESC03-00819 DOC - Permit Finaled11/15/201611/15/201611/15/2016 8:54:07 AMPPASS
old expired permit, no inspection
ESC04-01518 DOC - Permit Finaled11/15/201611/15/201611/15/2016 7:36:08 AMPPASS
old expired permit, no inspection
ESC16-00364 Aging Inspection11/15/201611/15/201611/15/2016 7:32:32 AM DEFR
to be finaled by BLD inspector
ESC16-00233 General Inspection11/15/201611/15/201611/15/2016 7:29:17 AM CANC
ESC15-00957 General Inspection11/15/201611/15/201611/15/2016 7:28:56 AM CANC
ESC16-00368 Aging Inspection11/15/201611/15/201611/15/2016 7:23:17 AM CANC
ESC15-00504 General Inspection11/10/201611/15/201611/14/2016 11:09:10 AMAPART
Vertical construction in progress on apartment buildings on the east and west ends of Kensington. No trackout outside of site to Saxton, State or Gary. Silt fence perimeter BMP installed on northern property limts. Onsite drop inlets have sediment protection. Trash containment provided throughout site. No major windblown trash issues observed.

Correction request:
- sweep up lanes surrounding the unprotected permeable pavers to prevent clogging/failure. Prohibit / conduct training to works to park in designated areas and to not store stockpiles on impervious parking surfaces that drain to the pavers.

Notified Barry with Bach.