Inspections for the day of: Friday, November 15, 2019.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC19-00041 General Inspection10/30/201911/15/201911/21/2019 2:00:50 PMACANC
ESC18-01451 General Inspection11/15/201911/15/201911/18/2019 8:08:56 AM DONE
Permits expired. Site stabilized. ESC permit closed.
ESC19-00932 Random Inspection11/15/201911/15/201911/15/2019 4:31:42 PMPFAIL
Dirt in gutter, no BMPs installed, no permit sign visible from road
ESC19-00082 General Inspection11/14/201911/15/201911/15/2019 4:29:57 PMAPART
No trackout, concrete washout pan being utilized on site.

Large stockpile on site is not stabilized and does not have any perimeter sediment controls.

Investigating possibility of taking material from this site and dumping on City property at the end of Warm Springs, need to get proof of dump location and/or chain of custody.
ESC18-01455 General Inspection11/15/201911/15/201911/15/2019 4:27:29 PM PASS
ESC18-01558 General Inspection11/15/201911/15/201911/15/2019 4:27:12 PM CANC
rescheduled for site final
ESC19-00402 BMP Violation11/15/201911/15/201911/15/2019 4:23:18 PMPFAIL
No clean up of street & gutter conducted as requested. No washout pan onsite, evidence of spilled/dumped washout on street, flowing down hill. No stabilized construction entrance.

No perimeter sediment controls installed.

Corrections:
- clean up site, sweep gutter, sweep up dried spilled material
- install sediment control wattle and/or other BMPs on the downhill corner
- pay $55 re-inspection fee
- schedule inspection with ESC inspector

Parcel hold placed on site until corrections complete
ESC18-01768 Site Final10/29/201911/15/201911/14/2019 8:36:40 AMPCANC