PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Wednesday, November 16, 2016
.
Number of inspections:
25
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC16-00556
General Inspection
11/3/2016
11/16/2016
11/21/2016 1:11:54 PM
P
CANC
ESC16-00288
General Inspection
11/16/2016
11/16/2016
11/18/2016 2:21:52 PM
PART
Active grading and earth work in progress. No discharges, permit posted.
Corrections needed next week:
- sweep up sidewalk and gutter.
- check inlet sediment control for maintenance
- re-install perimeter wattles removed for machinery access.
ESC16-00159
General Inspection
11/16/2016
11/16/2016
11/18/2016 1:24:44 PM
PART
No violations within subdvision.
Correction request to remove plastic sheeting from Warm Springs creek south of Parkcenter has still not fulfillied. Reinspection fees will start being applied.
ESC16-00538
Aging Inspection
11/16/2016
11/16/2016
11/17/2016 1:56:33 PM
CANC
ESC15-00729
General Inspection
11/16/2016
11/16/2016
11/17/2016 1:56:22 PM
CANC
rescheduled
ESC16-00363
Aging Inspection
11/16/2016
11/16/2016
11/17/2016 11:40:47 AM
CANC
ESC16-01287
Site Preparation
11/16/2016
11/16/2016
11/16/2016 4:04:47 PM
P
PASS
tracy Phone #: ###-####
Subdivision BMPs installed. RP onsite. Approved for construction
ESC15-01050
Conference
11/16/2016
11/16/2016
11/16/2016 2:54:10 PM
P
PASS
Approved plans for parking lot and swale were included with initial plan submittal with BLD15-02824.
Approved for construction.
ESC15-01050
General Inspection
11/16/2016
11/16/2016
11/16/2016 2:48:37 PM
P
CANC
ESC15-01391
General Inspection
11/16/2016
11/16/2016
11/16/2016 2:40:54 PM
CANC
ESC16-01279
Site Preparation
11/16/2016
11/16/2016
11/16/2016 12:41:40 PM
P
PASS
Joel- Phone #: ###-####
ESC16-00168
General Inspection
11/16/2016
11/16/2016
11/16/2016 12:22:43 PM
CANC
ESC15-00378
General Inspection
11/16/2016
11/16/2016
11/16/2016 11:47:12 AM
PASS
BLD finaled. Hillside areas around home have been recently hydroseeded, grass not yet established. Driveway installed, no sediment runoff to 26th.
ESC14-00432
General Inspection
11/16/2016
11/16/2016
11/16/2016 11:39:08 AM
CANC
ESC16-00380
Aging Inspection
11/16/2016
11/16/2016
11/16/2016 11:38:20 AM
CANC
ESC16-01460
Site Preparation
11/15/2016
11/16/2016
11/16/2016 11:35:08 AM
P
PASS
Andrina Phone #: ###-####
Infill lot. Main BMP is daily housekeeping inluding sweeping and trash containment. Posted permit sign for project.
ESC16-00299
Site Final
11/16/2016
11/16/2016
11/16/2016 11:24:24 AM
A
PASS
Project complete. No disturbed area, consruction materials or temporary BMPs remaining. ESC conditions satisfied.
ESC16-00362
Aging Inspection
11/16/2016
11/16/2016
11/16/2016 10:53:12 AM
PASS
No recent changes, old gas station still onsite. No issues/corrections. All permits open
ESC15-00453
General Inspection
11/16/2016
11/16/2016
11/16/2016 10:45:54 AM
PASS
Home complete but not yet occupied. Revegetation/stabilization still establishing. No issues or offsite sediment discharges observed.
ESC16-00770
General Inspection
11/16/2016
11/16/2016
11/16/2016 10:38:13 AM
A
PASS
New home frame and building footprint are now complete. WIP on interior and yard and driveway not yet installed. Silt fence is damaged in some areas but has done well to keep sediment onsite. No erosion or sediment deposition observed below silt fence. Once gutters & downspouts are installed , SF shall be removed by landscape crew.
Downstream inlet on culdesac has sediment protection. Permit sign posted, trash container in good conditions. No significant trackout. No corrections requested at this time. Approved.
ESC16-00788
General Inspection
11/16/2016
11/16/2016
11/16/2016 10:25:15 AM
A
PASS
Foundation has been poured. Permit sign posted and perimeter wattles are installed. No trackout, discharges or erosion issues observed. Need to monitor the roof top stormwater outfall on back slope once project is at that phase. No corrections needed.
ESC16-00578
General Inspection
11/16/2016
11/16/2016
11/16/2016 9:49:33 AM
A
PASS
Frame and footprint of building complete. Work occuring for site improvements and exterior. No discharges or trackout. Staging area is clean. Excavated dirt hauled offsite to prevent stockpile buildup. No corrections requested.
ESC16-00349
General Inspection
11/16/2016
11/16/2016
11/16/2016 9:06:18 AM
PEND
WIP on landscaping and interior work. Correction request previously issued to stabilize equipment access path behind home from Somerset #3 and reinstall silt fence and/or wattles. This is to be completed after landscaping and fence is installed.
ESC16-00291
Aging Inspection
11/16/2016
11/16/2016
11/16/2016 8:28:25 AM
PASS
SFH complete. ESC conditions satisfied. Temporary BMPs to remain for ongoing East Valley Construction. All permits finaled.
ESC16-00291
DOC - Permit Finaled
11/16/2016
11/16/2016
11/16/2016 8:27:27 AM
P
PASS