PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Thursday, November 16, 2017
.
Number of inspections:
19
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
MIS17-00387
ESC-Conference
11/16/2017
11/16/2017
11/21/2017 10:17:37 AM
P
DONE
Stockpiling by SC Construction @ 3454 - 3476 Anderson. Investigation pending to get proper permits and BMPs in place. See MIS17-00396
ESC16-01475
Aging Inspection
11/16/2017
11/16/2017
11/17/2017 4:02:24 PM
CANC
ESC17-00023
Aging Inspection
11/16/2017
11/16/2017
11/17/2017 3:25:05 PM
CANC
ESC16-01652
Aging Inspection
11/16/2017
11/16/2017
11/17/2017 3:24:31 PM
CANC
ESC17-00235
General Inspection
11/16/2017
11/16/2017
11/17/2017 3:24:08 PM
CANC
ESC16-00225
General Inspection
11/16/2017
11/16/2017
11/17/2017 8:10:38 AM
CANC
ESC15-00306
Site Preparation
11/15/2017
11/16/2017
11/16/2017 1:59:05 PM
A
PASS
9:30 walk through of BMPs for river bank repairs.
Site inspection and SWPPP binder review completed with McMillen project team, RP on permit Olivia W. coordinated conference/inspection.
Superintendant on site is Ralph Behrens. Multiple river bank repair sites between ESP and Veteran's Mem. Parkway (VMP).
BMPs include:
-Heavy duty rock construction entrances installed at both access points (Esther Simplot Park (ESP) and Stilson off VMP)
- Sediment control wattles and silt fence installed properly at low points and sensitive boundaries of each repair zone.
- Site to be inspected daily by onsite crew and also frequently by office staff.
- Stockpile areas and construction access routes have been designated to prevent excess disturbance or increase potential risk of sediment runoff from stockpiles during rain events.
- Permit signage posted at each end of project. SWPPP info located at entrance in ESP.
- significant earthwork to begin next week. Follow up inspection scheduled.
Approved for construction, BMPs approved.
ESC17-00076
Aging Inspection
11/16/2017
11/16/2017
11/16/2017 1:49:40 PM
PASS
ESC16-00406
General Inspection
11/16/2017
11/16/2017
11/16/2017 1:49:06 PM
P
PASS
Erosion and sediment controls installed are working well. No new erosion rills or evidence of sediment runoff from slopes and graded parcels. 1 SFH in progress. No violations observed. RP Clayton on-site.
Two corrections needed before next inspection:
- new concrete washout facility (existing is full)
- repair wattle next to CC Golf Course golf cart path. Watch out for any increase in rills on this slope.
ESC17-01457
Site Preparation
11/16/2017
11/16/2017
11/16/2017 11:58:39 AM
A
PASS
WIP, previously approved for construction. Foundations poured, concrete washout utilized. ESC permit signs posted around perimeter of Idaho Street townhomes project. No trackout or discharges
ESC17-01464
Site Preparation
11/16/2017
11/16/2017
11/16/2017 11:58:26 AM
A
PASS
WIP, previously approved for construction. Foundations poured, concrete washout utilized. ESC permit signs posted around perimeter of Idaho Street townhomes project. No trackout or discharges
ESC17-01132
Random Inspection
11/16/2017
11/16/2017
11/16/2017 11:57:32 AM
P
PASS
First phase permit ESC17-00992 has been finaled. All remaining covered under this permit.
Perimeter controls, inlet protection and construction entrance is installed.
Beniton RP Chase Coooper ###-####
ESC17-00992
Random Inspection
11/16/2017
11/16/2017
11/16/2017 11:54:09 AM
P
PASS
First phase of project covered under this permit is complete. New grading and building permits have been issued, ESC covered under ESC17-01132. Beniton is operator and same RP Chase is on duty.
ESC17-00992
DOC - Permit Finaled
11/16/2017
11/16/2017
11/16/2017 11:52:45 AM
P
PASS
ESC15-00976
General Inspection
11/16/2017
11/16/2017
11/16/2017 11:50:56 AM
PASS
Idaho Street townhome project is back in progress. 6 townhomes on east side of block now have active permits. Foundations have been poured, concrete wahout pit has been utilized. Permit signs posted around perimeter. No trackout or discharges.
ESC17-00221
General Inspection
11/16/2017
11/16/2017
11/16/2017 8:21:45 AM
PASS
ESC17-00221
DOC - Permit Finaled
11/16/2017
11/16/2017
11/16/2017 8:21:36 AM
P
PASS
ESC16-01414
DOC - Permit Finaled
11/16/2017
11/16/2017
11/16/2017 8:07:29 AM
P
PASS
ESC17-00032
DOC - Permit Finaled
11/16/2017
11/16/2017
11/16/2017 7:53:03 AM
P
PASS