ESC14-01063
| General Inspection | 11/16/2018 | 11/16/2018 | 11/19/2018 2:01:08 PM | | PASS |
|
|
|
ESC17-00837
| General Inspection | 11/16/2018 | 11/16/2018 | 11/19/2018 1:29:57 PM | | CANC |
|
|
|
ESC17-00111
| General Inspection | 11/13/2018 | 11/16/2018 | 11/19/2018 11:38:04 AM | P | PASS |
|
|
check to see if SFHs on Pocono are ready for final. Note: the carports will be covered under this permit.
WIP on interior. Need to finish the final cleaning of the parking lot and permeable pavers.
|
ESC18-01121
| General Inspection | 11/16/2018 | 11/16/2018 | 11/16/2018 5:17:32 PM | P | PASS |
|
|
Inspection to check turbidity. Fill work occuring in Veteran's Pond to build new greenbelt pathway created some turbid water within the lake, as noted on Wednesday. (28 NTU wednesday 11/14, 44 NTU friday 11/16)
Upstream from project by Garden City pedestrian brings, sampled at 2.48 NTU
Sample at confluence of Farmer's Union (Boise River Diversion) at confluence of outflow of Vet's Pond was 4.2 NTU. Only a change of less than 2 NTU within the background, well under the 50 NTU limit.
To ensure turbidity in the lake did not cause a discharge, fill work was halted to allow settling and skimming of floating debris within the turbidity curtain zone.
Project is sampling turbidity daily and monitoring discharges. Approved.
|
ESC17-01612
| General Inspection | 11/13/2018 | 11/16/2018 | 11/16/2018 5:04:36 PM | P | PASS |
|
|
see ESC17-00111 for remaining ESC inspection. Townhome near completion. No violations.
|
ESC17-01612
| DOC - Permit Finaled | 11/16/2018 | 11/16/2018 | 11/16/2018 5:04:29 PM | P | PASS |
|
|
|
ESC17-01588
| Site Final | 11/13/2018 | 11/16/2018 | 11/16/2018 5:04:22 PM | P | PASS |
|
|
see ESC17-00111 for remaining ESC inspection. Townhome near completion. No violations.
|
ESC17-01623
| Aging Inspection | 11/16/2018 | 11/16/2018 | 11/16/2018 5:04:09 PM | | PASS |
|
|
see ESC17-00111 for remaining ESC inspection. Townhome near completion. No violations.
|
ESC17-01623
| DOC - Permit Finaled | 11/16/2018 | 11/16/2018 | 11/16/2018 5:04:00 PM | P | PASS |
|
|
|
ESC17-01624
| Aging Inspection | 11/16/2018 | 11/16/2018 | 11/16/2018 5:03:52 PM | | PASS |
|
|
see ESC17-00111 for remaining ESC inspection. Townhome near completion. No violations.
|
ESC17-01624
| DOC - Permit Finaled | 11/16/2018 | 11/16/2018 | 11/16/2018 5:02:49 PM | P | PASS |
|
|
|
ESC17-01625
| Aging Inspection | 11/16/2018 | 11/16/2018 | 11/16/2018 5:02:43 PM | | PASS |
|
|
see ESC17-00111 for remaining ESC inspection. Townhome near completion. No violations.
|
ESC17-01625
| DOC - Permit Finaled | 11/16/2018 | 11/16/2018 | 11/16/2018 5:02:37 PM | P | PASS |
|
|
|
ESC17-01626
| Aging Inspection | 11/16/2018 | 11/16/2018 | 11/16/2018 5:02:22 PM | | PASS |
|
|
|
ESC17-01626
| DOC - Permit Finaled | 11/16/2018 | 11/16/2018 | 11/16/2018 5:02:09 PM | P | PASS |
|
|
see ESC17-00111 for remaining ESC inspection. Townhome near completion. No violations.
|
ESC17-01620
| Aging Inspection | 11/16/2018 | 11/16/2018 | 11/16/2018 5:01:25 PM | | PASS |
|
|
|
ESC17-01620
| DOC - Permit Finaled | 11/16/2018 | 11/16/2018 | 11/16/2018 5:01:16 PM | P | PASS |
|
|
see ESC17-00111 for remaining inspections
|
ESC16-00625
| Random Inspection | 11/16/2018 | 11/16/2018 | 11/16/2018 10:24:45 AM | P | PASS |
|
|
WIP on installing new sidewalk in front of home. Concrete washout container on site, no concrete poured yet. No discharges or trackout.
|
ESC18-00633
| Site Final | 11/16/2018 | 11/16/2018 | 11/16/2018 9:25:19 AM | P | PASS |
|
|
Home complete and occupied. Front yard landscaped. BLD finaled. Temp. BMPs of Diamante subdivsion to remain installed for ongoing construciton.
|
ESC18-00632
| Site Final | 11/16/2018 | 11/16/2018 | 11/16/2018 9:20:59 AM | P | PASS |
|
|
Home complete and occupied. Front yard landscaped. BLD finaled. Temp. BMPs of Diamante subdivsion to remain installed for ongoing construciton.
|
ESC17-01515
| Site Final | 11/16/2018 | 11/16/2018 | 11/16/2018 9:19:11 AM | P | PASS |
|
|
Home complete and occupied. Front yard landscaped. BLD finaled. Temp. BMPs of Diamante subdivsion to remain installed for ongoing construciton.
|
ESC17-01641
| Site Final | 11/16/2018 | 11/16/2018 | 11/16/2018 9:18:49 AM | P | PASS |
|
|
Home complete and occupied. Front yard landscaped. BLD finaled. Temp. BMPs of Diamante subdivsion to remain installed for ongoing construciton.
|
ESC18-01130
| Conference | 11/15/2018 | 11/16/2018 | 11/16/2018 9:04:55 AM | A | PASS |
|
|
8:30 w/ Chad and John Low
ESC plan review and site walk through conducted. ESC permit sign posted on job trailer.
Construction entrances are installed on Franklin, no access to Cloverdale for haul trucks. Concrete has been poured, Ecopan washouts are onsite. One for truck chutes, and a low clearance one for pump trucks. Storm drain on Franklin west of entrance has filter fabric installed. Site has uneven surface, so ponding will occur. Road mix has already been spread around site so should help reduce mud. Silt fence perimeter is trenched in at potential low spots and is combined with a chain link fence. Large dumpster onsite.
Approved. Site has filed a LEW for CGP 2017 requirements.
|