ESC16-00327
| General Inspection | 11/15/2016 | 11/17/2016 | 11/23/2016 8:58:11 AM | A | CANC |
|
|
|
ESC16-01373
| General Inspection | 11/8/2016 | 11/17/2016 | 11/21/2016 1:18:21 PM | P | DEFR |
|
|
to be inspected by BLD inspector
|
ESC14-00719
| General Inspection | 11/17/2016 | 11/17/2016 | 11/21/2016 1:17:05 PM | | CANC |
|
|
|
ESC16-00502
| Aging Inspection | 11/17/2016 | 11/17/2016 | 11/18/2016 3:28:16 PM | | CANC |
|
|
rescheduled 11/22
|
ESC15-01060
| General Inspection | 11/17/2016 | 11/17/2016 | 11/18/2016 2:54:04 PM | | CANC |
|
|
|
ESC16-00271
| Aging Inspection | 11/17/2016 | 11/17/2016 | 11/18/2016 2:51:29 PM | | PASS |
|
|
SFH near completion. No violations observed. Yard not yet fullly landscaped /stabilized.
|
ESC16-00088
| General Inspection | 11/17/2016 | 11/17/2016 | 11/18/2016 2:35:47 PM | | PASS |
|
|
WIP on interior. Driveway is being prepped for paver installation. No trackout, no work occuring below retaining wall. No discharges. Permit sign posted at entrance.
|
ESC16-01394
| General Inspection | 11/4/2016 | 11/17/2016 | 11/18/2016 1:49:33 PM | A | PASS |
|
|
|
ESC14-00588
| General Inspection | 11/17/2016 | 11/17/2016 | 11/18/2016 12:53:56 PM | | PASS |
|
|
Both entrances now paved, no trackout to Parkcenter and interior surfaces and drainages to the permeable pavers have been swept and not dirt stockpiles. WIP on southwest corner of project including landscaping. Silt fence along Loggers Creek has been removed where landscaping/stabilization has been installed behind condo units. No corrections requested at this time.
|
ESC16-00344
| Complaint Inspection | 11/17/2016 | 11/17/2016 | 11/18/2016 9:31:32 AM | A | DONE |
|
|
investigate drainage issue
Public Works handling case. This is a minor land division, not a subdivision and therefore there was no storm water drainage review. Not an issue regarding BCC 8-17
|
ESC16-00406
| General Inspection | 11/17/2016 | 11/17/2016 | 11/17/2016 4:58:21 PM | P | PEND |
|
|
WIP on installing hillside erosion controls, including slope intercepting wattles, horizontal tracking, hydromulch application, and erosion control blankets.
Wattles are staked down, but in some areas were not trenched in, potentially due to frozen ground or rough/steep terrain. Some tenting of the ECB is observable but it is staked down and should prevent raindrop erosion.
Construction entrance has been lengthened and sand bag sediment check dams installed to trap dirt on the side of the development.
Extensive amount of labor and materials utilized, will monitor performance during next precipitation to identify any issues.
Request to prohibit fence crew and ESC installation crew from driving on grass off Sunset Peak Rd. Verbal request
|
ESC13-00524
| General Inspection | 11/17/2016 | 11/17/2016 | 11/17/2016 4:45:48 PM | | PASS |
|
|
No hillside erosion issues observed in common areas. Individual SFHs have seperate ESC permits . No activity yet on next phase across Bogus Basin Road. No corrections at this time.
|
ESC15-00468
| General Inspection | 11/17/2016 | 11/17/2016 | 11/17/2016 4:40:49 PM | | PASS |
|
|
Home occupied and yard is landscaped. Grass on slopes is establishing well. Hillside bond issued. No outstanding ESC violations or corrections needed. ESC permit conditions satisfied.
|
ESC13-00707
| DOC - Permit Finaled | 11/17/2016 | 11/17/2016 | 11/17/2016 4:38:25 PM | P | PASS |
|
|
|
ESC15-00468
| DOC - Permit Finaled | 11/17/2016 | 11/17/2016 | 11/17/2016 4:12:10 PM | P | PASS |
|
|
|
ESC16-01142
| Site Preparation | 11/17/2016 | 11/17/2016 | 11/17/2016 2:20:01 PM | P | PASS |
|
|
Clint Phone #: ###-####
Subdivsion BMPs installed. Permit posted. Approved for construction.
|
ESC16-00265
| Aging Inspection | 11/17/2016 | 11/17/2016 | 11/17/2016 2:19:20 PM | | CANC |
|
|
|
ESC15-01466
| Aging Inspection | 11/17/2016 | 11/17/2016 | 11/17/2016 2:19:07 PM | | CANC |
|
|
|
ESC15-01308
| General Inspection | 11/17/2016 | 11/17/2016 | 11/17/2016 2:06:44 PM | | CANC |
|
|
rescheduled for site final
|
ESC16-00610
| Aging Inspection | 11/17/2016 | 11/17/2016 | 11/17/2016 2:05:31 PM | | PASS |
|
|
Corrections from previous inspections completed. Construction complete, all permits finaled. ESC conditions satisfied.
|
ESC16-00610
| DOC - Permit Finaled | 11/17/2016 | 11/17/2016 | 11/17/2016 2:02:29 PM | P | PASS |
|
|
|
ESC16-00950
| Site Final | 11/17/2016 | 11/17/2016 | 11/17/2016 1:58:34 PM | P | PASS |
|
|
Demolition complete. Lot stabilized. No debris or stockpiles left behind. All permits finaled.
|
ESC16-00624
| Site Final | 11/17/2016 | 11/17/2016 | 11/17/2016 1:06:10 PM | P | PASS |
|
|
Multifamily apartment building structure complete, permanent onsite storm water management installed. Final landscaping, clean up, and temp BMP removal to be inspected with Site Final on Towne Point main site permit ESC15-00871, this permit finaled.
|
ESC16-00623
| Site Final | 11/17/2016 | 11/17/2016 | 11/17/2016 1:05:51 PM | P | PASS |
|
|
Multifamily apartment building structure complete, permanent onsite storm water management installed. Final landscaping, clean up, and temp BMP removal to be inspected with Site Final on Towne Point main site permit ESC15-00871, this permit finaled.
|
ESC16-00622
| Site Final | 11/17/2016 | 11/17/2016 | 11/17/2016 1:05:36 PM | P | PASS |
|
|
Multifamily apartment building structure complete, permanent onsite storm water management installed. Final landscaping, clean up, and temp BMP removal to be inspected with Site Final on Towne Point main site permit ESC15-00871, this permit finaled.
|
ESC16-00621
| Site Final | 11/17/2016 | 11/17/2016 | 11/17/2016 1:05:18 PM | P | PASS |
|
|
Multifamily apartment building structure complete, permanent onsite storm water management installed. Final landscaping, clean up, and temp BMP removal to be inspected with Site Final on Towne Point main site permit ESC15-00871, this permit finaled.
|
ESC16-00620
| Site Final | 11/17/2016 | 11/17/2016 | 11/17/2016 1:05:00 PM | P | PASS |
|
|
Multifamily apartment building structure complete, permanent onsite storm water management installed. Final landscaping, clean up, and temp BMP removal to be inspected with Site Final on Towne Point main site permit ESC15-00871, this permit finaled.
|
ESC16-00619
| Site Final | 11/17/2016 | 11/17/2016 | 11/17/2016 1:04:46 PM | P | PASS |
|
|
Multifamily apartment building structure complete, permanent onsite storm water management installed. Final landscaping, clean up, and temp BMP removal to be inspected with Site Final on Towne Point main site permit ESC15-00871, this permit finaled.
|
ESC15-00871
| General Inspection | 11/17/2016 | 11/17/2016 | 11/17/2016 12:58:50 PM | | PASS |
|
|
All multifamily buildings now complete. Final site improvements of landscaping and clean up are in progress. Onsite drainage facilities are installed, cleaned, and stabilized.
RP onsite, will call for Site Final inspection in December. Note , the 6 seperate ESC permits have been finaled.
|
ESC16-01370
| Site Preparation | 11/17/2016 | 11/17/2016 | 11/17/2016 12:51:21 PM | A | PASS |
|
|
Silt fence installed on back of lot, permit sign posted. Down gradient storm drain has sediment filter bag installed. Will install wattles as needed along edge of pavement once foundation excavation is complete. Approved for construction.
|
ESC15-00306
| Conference | 11/17/2016 | 11/17/2016 | 11/17/2016 12:49:29 PM | A | DONE |
|
|
Conference with park developers regarding next phase of Whitewater Park conducted 11/16.
Project tentatively set to begin October 2017. Seperate ESC permits and SWPPP to be submitted.
All construction of Esther Simplot Park is complete. This ESC permit to remain open to monitor the unfinished area between parking lot, River and canal intake structure. Area may require additional stabilization or ground cover but currently is compacted earth and river rock. Hydroseeding did not establish. Water could potentially flow out of this area by the intake structure, currently a sediment control wattle has been installed.
No other corrections needed, all temporary BMPs have been removed and other disturbed areas stabilized.
|
ESC15-01483
| General Inspection | 11/17/2016 | 11/17/2016 | 11/17/2016 11:53:12 AM | | FAIL |
|
|
No cleanup or sweeping on Bannock performed within site fencing. Cementitious materials, mud, and loose sediment in gutter. No DI bag on Bannock and 11th that receives runoff from the dirty area.
Verbal Correction Request to RP Kent. Stated he will have it cleaned today.
Will check tomorrow. Inspeciton scheduled for PM
|
ESC16-01189
| BMP Violation | 11/17/2016 | 11/17/2016 | 11/17/2016 11:39:52 AM | A | FAIL |
|
|
No trackout or discharges, but improper permit and project start-up procedures:
- no site preparation inspection requested as required - RP Ken Scaggs is listed but is not directly associated or in control of project - SWPPP & eNOI filed by Granite Excavation, they should have RP - No inspection reports filled out in SWPPP binder - No permit or contact information on yellow permit sign (I provided permint # and Granite contact Dusty Hibbard)
|
ESC16-01257
| General Inspection | 11/10/2016 | 11/17/2016 | 11/17/2016 10:01:14 AM | A | PASS |
|
|
WIP on foundation excavation. Permit sign(s) for both homes (adjacent) are posted. No MS4 on street. Regular sweeping required and trash containment
|