ESC14-01059
| Tracking Control | 11/18/2015 | 11/18/2015 | 11/19/2015 11:57:32 AM | P | PART |
|
|
No significant trackout occuring at time of inspection.
Correction request issued via phone to RP Buzz Baker to clean up the paved entrance area of loose mud and sediment. Suggested a designated parking area for workers in a clean area. RP will work on cleaning and organizing the staging area.
Will check pack next week.
|
ESC15-00586
| Site Preparation | 11/17/2015 | 11/18/2015 | 11/18/2015 4:25:53 PM | A | NR |
|
|
Project site not yet prepared for construction. No activity, no staging....will check for projected start.
|
ESC15-00065
| General Inspection | 11/18/2015 | 11/18/2015 | 11/18/2015 3:22:35 PM | | PASS |
|
|
Home near completion. Trash container has been serviced recently, no debris or material around site. No significant trackout, no erosion occuring on graded hillside yard area. No corrections.
|
ESC15-00288
| Random Inspection | 11/18/2015 | 11/18/2015 | 11/18/2015 2:32:03 PM | P | PASS |
|
|
WIP on townhome. Near completion, yard not yet landscaped/stabilized but no trackout or sediment leaving site. Clean site, 3 homes in a row by same builder. Approved.
|
ESC15-00277
| Random Inspection | 11/18/2015 | 11/18/2015 | 11/18/2015 2:31:44 PM | P | PASS |
|
|
WIP on townhome. Near completion, yard not yet landscaped/stabilized but no trackout or sediment leaving site. Clean site, 3 homes in a row by same builder. Approved.
|
ESC15-00281
| Aging Inspection | 11/18/2015 | 11/18/2015 | 11/18/2015 2:31:12 PM | | PASS |
|
|
WIP on townhome. Near completion, yard not yet landscaped/stabilized but no trackout or sediment leaving site. Clean site, 3 homes in a row by same builder. Approved.
|
ESC15-01004
| General Inspection | 11/18/2015 | 11/18/2015 | 11/18/2015 2:17:07 PM | P | PASS |
|
|
No activity currently at downtown Residence Inn project. Surrounding streets were swept after demolition of old structure and excavation for initial foundation work. Site surrounded by security fencing. No sediment runoff issues observed. No corrections.
|
ESC14-01083
| General Inspection | 11/18/2015 | 11/18/2015 | 11/18/2015 12:39:38 PM | P | PASS |
|
|
Street sweeping and housekeeping was conducted and has improved since issuing correction to sweep up cement/stucco fines in gutters as well pick up/contain litter & material wrappings on 11/12.
Brighton Homes and Brighton Co. responded to correction. No new violations, no corrections. WIP on townhomes and housekeeping sweeping should occur at end of each day.
|
ESC15-00361
| Aging Inspection | 11/18/2015 | 11/18/2015 | 11/18/2015 12:24:44 PM | | PASS |
|
|
Construction complete and yard has been landscaped. Projects on both side of home are active and subdivision temporary BMPs shall remain installed. BLD finaled, no further ESC inspections on this permit. Conditions satisfied.
|
ESC15-01168
| Site Preparation | 11/18/2015 | 11/18/2015 | 11/18/2015 12:14:11 PM | P | PASS |
|
|
New SFH in Harris Crossing approved for excavation/construction. BMPs in subdivision installed. RP onsite.
|
ESC15-01167
| Site Preparation | 11/17/2015 | 11/18/2015 | 11/18/2015 12:12:07 PM | A | PASS |
|
|
I need to get 21-1 HC site prep inspected also I didn''t see it on the list. Address: 3862 Caddis pl BLD#15-03278 Phone #: ###-#### Inspection requested via web by Weston Wagner
Approved for construction, BMPs installed in Harris Crossing and new silt fence installed to protect the new home construciton on the east side of Caddis. New lined concrete washout installed. DI bags with remaining capacity.
Minor corrections: - stake down all four corners of concrete washout lining - continue to have periodic scheduled street sweep. Once every 2 weeks or as necessary to control trackout.
|
ESC14-00657
| Random Inspection | 11/18/2015 | 11/18/2015 | 11/18/2015 12:01:16 PM | P | PART |
|
|
No offsite discharges of sediment or other materials, no trackout. BMPs with subdivision area installed. High amount of activity on all streets and very crowded, street sweeping should occur on weekends...
Correction: - pick up wind blown trash and construction wrappings that have blown down Signal Rock and accumulated in the weeds along the south side of Warm Springs (river side). This trash pick up should occur regularly (1x week) because the wind whips down the hill and blows everything in that area.
|
ESC15-01385
| Site Preparation | 11/18/2015 | 11/18/2015 | 11/18/2015 11:57:47 AM | P | PART |
|
|
Yellow card on site Inspection requested via web by Erby Gonzales
ESC permit sign posted. Multiple projects in progress by Brighton on Signal Rock. Street needs to be swept at end of each week.
Correction for Brighton Homes/River Heights #7
- pick up windblown trash from construction sites that has accumulated on the south side (river side) of Warm Springs.
Approved to start, will issue correction also on RH #6 permit ESC14-00657.
|
ESC15-00297
| Aging Inspection | 11/18/2015 | 11/18/2015 | 11/18/2015 11:42:06 AM | | PASS |
|
|
Work complete. BLD finaled. Yard is landscaped and stabilized. No temp. BMP removal due to SFHs on Sky Bar in progress. Permit closed.
|
ESC15-00297
| DOC - Permit Finaled | 11/18/2015 | 11/18/2015 | 11/18/2015 11:40:43 AM | P | PASS |
|
|
|
ESC15-01405
| Site Preparation | 11/18/2015 | 11/18/2015 | 11/18/2015 11:20:22 AM | P | PASS |
|
|
Yellow card on site Inspection requested via web by Erby Gonzales
SFH parcel in Mill District Square is ready for construciton. BMPs include storm drain sediment protection, lined concrete washout, and no offstreet parking. Current project by Brighton Homes in MDS are in compliance. Approved.
|
ESC15-01409
| Site Preparation | 11/18/2015 | 11/18/2015 | 11/18/2015 11:19:59 AM | P | PASS |
|
|
Yellow card on site Inspection requested via web by Erby Gonzales
SFH parcel in Mill District Square is ready for construciton. BMPs include storm drain sediment protection, lined concrete washout, and no offstreet parking. Current project by Brighton Homes in MDS are in compliance. Approved.
|
ESC15-00408
| Aging Inspection | 11/18/2015 | 11/18/2015 | 11/18/2015 10:50:25 AM | | PASS |
|
|
Revegetation of disturbed area is complete. No loose sediment or construction at site. ESC permit conditions satisfied.
|
ESC15-00408
| DOC - Permit Finaled | 11/18/2015 | 11/18/2015 | 11/18/2015 10:48:58 AM | P | PASS |
|
|
|
ESC15-00403
| General Inspection | 11/18/2015 | 11/18/2015 | 11/18/2015 10:34:33 AM | | PASS |
|
|
No construction activity at time of inpsection. Foundation was recently poured and a lined concrete washout box (Outpack) was utilized. No spills or leaks.
Site staging/parking area is utilizing existing paved area so no trackout issues. Silt fence installed along Bown Street is keeping west side of project contained. No activity in the swale overflow channel area next to Greenbelt with no loose sediment or disturbed area in channel. Site utilities are now installed so dewatering phase is complete and frack tank has been removed.
Permit sign posted, no corrections at this time.
|
ESC15-00602
| General Inspection | 11/18/2015 | 11/18/2015 | 11/18/2015 10:14:51 AM | | PASS |
|
|
Assembly building/temple is complete. WIP on the multi-purpose building with dwelling units. See inspection activity for under ESC14-01059
|
ESC15-00602
| DOC - Permit Finaled | 11/18/2015 | 11/18/2015 | 11/18/2015 10:13:17 AM | P | PASS |
|
|
|
ESC15-00318
| Aging Inspection | 11/18/2015 | 11/18/2015 | 11/18/2015 9:06:57 AM | | PASS |
|
|
|
ESC15-00314
| General Inspection | 11/18/2015 | 11/18/2015 | 11/18/2015 8:34:54 AM | | PASS |
|
|
Tenant improvement of loading dock area is complete. Construction area is clean with no materials, disturbed area, or temporary BMPs remaining.
Permit finaled.
|
ESC15-00314
| DOC - Permit Finaled | 11/18/2015 | 11/18/2015 | 11/18/2015 8:33:53 AM | P | PASS |
|
|
|
ESC13-00213
| Site Final | 11/12/2015 | 11/18/2015 | 11/17/2015 3:37:06 PM | A | CANC |
|
|
|