Inspections for the day of: Wednesday, November 19, 2014.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-01083 Site Preparation11/19/201411/19/201411/19/2014 4:04:00 PMAPASS
Met RP Danial of Brighton Corp. onsite to review plans and BMP installations for Barber Valley townhome sub. Site is surrounded security fencing to delineate area of disturbance, control access. Permit and NOI info posted at entrance. Wattles have been placed on the south perimeter of the site (between swales and river) and are trenched in. The offsite power trench BMPs will be installed prior to disturbance and inspected seperately.

Discussed future dewatering and instructed that Boise Parks and Rec will be involved because they own the swales and pond that treated water will be discharged to.

Approved for construction.
ESC14-00157 General Inspection11/19/201411/19/201411/19/2014 2:08:03 PM PASS
Working on frame. No trackout or discharges.
ESC13-00230 General Inspection11/19/201411/19/201411/19/2014 12:33:35 PM PASS
ESC14-00144 General Inspection11/19/201411/19/201411/19/2014 11:57:52 AM PASS
Limited activity. SFH homes in progress by Tahoe Homes. No runoff issues yet, still froxen.
ESC14-00045 General Inspection11/18/201411/19/201411/19/2014 11:39:35 AMAPASS
WIP. Sediment and materials contained on site. No discharge or sediment runoff occuring. Permit is posted.
ESC14-00160 Aging Inspection11/19/201411/19/201411/19/2014 11:20:38 AM PASS
Exterior work complete. Trash contained, permit is posted. Tianna Park sub and Sunrise Homes projects are currently in compliance.
ESC14-01002 Site Preparation11/18/201411/19/201411/19/2014 10:52:20 AMAPASS
RP Hans called to schedule discuss requirements. Inspection requested for 10:30 # ###-####

Onsite inspection with RP-GC Hans completed. Wattles at low end of site are in position but will be trenched when ground thaws. Stabilized construction entrance/tracking pad has been installed. Will use plastic container washout. Permit posted on fence. For downstream gutter sediment capture, a gravel bag at an angle will be used.

Approved for excavation.
ESC14-00240 General Inspection11/19/201411/19/201411/19/2014 10:22:36 AM PASS
Airport paving project completed in July. Site stabilization by new tarmac/asphalt. ESC conditions satisified.
ESC14-00240 DOC - Permit Finaled11/19/201411/19/201411/19/2014 10:18:32 AMPPASS
ESC13-01290 Aging Inspection11/19/201411/19/201411/19/2014 8:44:26 AM PASS
Pinetree Village townhome building in progress (multiple units w/ seperate permits). No spills, uncontained trash, trackout, or non-stormwater discharges observed. No runoff as temp is still below freezing.
ESC13-01289 Aging Inspection11/19/201411/19/201411/19/2014 8:42:30 AM PASS
ESC13-01292 Aging Inspection11/19/201411/19/201411/19/2014 8:42:18 AM PASS
ESC13-01291 Aging Inspection11/19/201411/19/201411/19/2014 8:42:05 AM PASS