PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, November 19, 2019
.
Number of inspections:
20
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Andy J. Long
Title
EROSION INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC18-01022
Conference
11/5/2019
11/19/2019
11/21/2019 2:21:37 PM
A
DONE
winterization conference 1:30; conducted Tuesday 11/19
Will install large lined berm at bottom of road to direct all runoff into the retention pond. Pond overflow to be capped and pond level monitored.
Additional lot soil roughening and berms to be added on lots along Eyrie. Upper area should remain undisturbed other than some stormwater volume and velocity controls
RP had wattles installed around the disturbed area from recent utility work and will be hydroseeded.
Lots above Arrow Villa should not hold water close to the ridge above existing homes, but should allow water to flow towards the unfinished road for storage and infiltration there.
No violations observed, RP requested curbing crew to demand concrete truck drivers use lined washout facility for all washout activiities.
ESC18-01767
General Inspection
11/19/2019
11/19/2019
11/21/2019 2:00:43 PM
CANC
rescheduled
ESC18-00928
Site Final
11/7/2019
11/19/2019
11/21/2019 2:00:05 PM
A
CANC
ESC18-01447
General Inspection
11/19/2019
11/19/2019
11/21/2019 1:59:23 PM
CANC
ESC19-00396
General Inspection
11/19/2019
11/19/2019
11/21/2019 1:58:43 PM
P
CANC
rescheduled
ESC18-00925
Site Final
11/15/2019
11/19/2019
11/20/2019 10:26:45 AM
P
CANC
ESC19-00994
General Inspection
11/19/2019
11/19/2019
11/20/2019 8:33:27 AM
P
PASS
Slopes have been tracked, installed with wattle, and a double application of hydroseed with tacifying mulch. Road mix/gravel walking path has been installed between Hackberry Ranch and Hackberry Ridge. Grading and lot prep is complete, some minor concrete work for shoulder work is occuring.
ESC19-00589
General Inspection
11/19/2019
11/19/2019
11/19/2019 1:34:02 PM
P
PASS
ESC19-00601
General Inspection
11/19/2019
11/19/2019
11/19/2019 11:37:24 AM
P
PASS
?WIP on installing irrigation lines. Roof top gutters are connected to subdivision stub ins. Will follow up for sweep of loose dirt from the irrigation lines.
ESC16-00406
General Inspection
11/19/2019
11/19/2019
11/19/2019 11:14:36 AM
PART
Subdivision BMPs installed.
Correction request to install slope diversion berms on lot 7 block 2 (owned by Conner Construction) due some runoff causing erosion damage around the rock retaining walls installed.
ESC19-01341
General Inspection
11/19/2019
11/19/2019
11/19/2019 11:02:50 AM
P
PASS
*online test"
ESC19-01341
General Inspection
11/19/2019
11/19/2019
11/19/2019 10:43:24 AM
P
PASS
*test of PDS online notification system*
ESC19-01341
Site Preparation
11/18/2019
11/19/2019
11/19/2019 10:34:26 AM
A
PASS
9:30 AM
Met with GC Walt for site walk-through inspection.
ESC permit sign posted, construction access installed. Vegetation along the Highland View perimeter has been preserved. Low spot has the subdivsion infiltration swale already installed and some boulders are being stored there.
Washout will be provided prior to any foundation work. After excavation, additional road mix employee parking area will be installed.
Rear slope will be regraded and tracked after removing trees and old fence. The parcel has a vegetated lower area that will be undisturbed and act as vegetative buffer. Follow up inspection scheduled after excavation/earh work is to be completed.
ESC19-00927
General Inspection
11/19/2019
11/19/2019
11/19/2019 10:29:29 AM
P
PASS
Existing vegetation preserved around utiliities and new driveway access. No trackout or discharges. No corrections at this time. New SFH has started on one of the lots and is permitted seperately
ESC19-01205
General Inspection
11/19/2019
11/19/2019
11/19/2019 10:20:11 AM
P
PART
No permit sign posted. No site preparation inspeciton was requested.
No trackout,.spills, or discharges observed. Posted ESC permit sign on trash box.
ESC18-01620
General Inspection
11/19/2019
11/19/2019
11/19/2019 10:16:34 AM
CANC
ESC18-01620
Site Final
11/19/2019
11/19/2019
11/19/2019 10:16:29 AM
P
PASS
HOme complete and landscaped. Adjacent lot used by builder is now a new project. No ESC correction requests . ESC permit finaled.
ESC18-00878
Aging Inspection
11/19/2019
11/19/2019
11/19/2019 8:27:14 AM
DEFR
ESC18-01702
General Inspection
11/19/2019
11/19/2019
11/19/2019 8:01:20 AM
CANC
ESC18-01702
DOC - Permit Finaled
11/19/2019
11/19/2019
11/19/2019 8:01:12 AM
P
PASS