Inspections for the day of: Friday, November 20, 2015.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00035 General Inspection11/20/201511/20/201511/20/2015 4:39:28 PM PASS
Construction complete and roundabout has been in use for several months. Permit open to monitoring re-vegetation of disturbed areas that have been hydroseeded. Silt fence installation is still at the south east end of project area.

No violations or issues observed. Townhomes are now being built on both side of the new stretch of Parkcenter.
ESC15-00553 General Inspection11/20/201511/20/201511/20/2015 3:55:06 PM PASS
ESC15-01210 General Inspection11/20/201511/20/201511/20/2015 3:31:44 PMPPASS
Grading in progress. Construction entrance installed as well as wattles along the bottom of the project area. No trackout or discharges. No complaints received by ESC division.
ESC15-01101 General Inspection11/20/201511/20/201511/20/2015 2:09:57 PMPPASS
ESC permit sign posted clearly. Wattles installed at toe of slope at bottom property line. No litter or debris around site. No activity at time of inspection.

No trackout, illicit discharges or othe violations occuring at site. In compliance.
ESC15-00703 Aging Inspection11/20/201511/20/201511/20/2015 2:06:35 PM PASS
Project complete. ESC permit conditions satisfied. All permits closed out.
ESC15-00703 DOC - Permit Finaled11/20/201511/20/201511/20/2015 2:05:59 PMPPASS
ESC14-00892 Site Final11/17/201511/20/201511/20/2015 1:41:48 PMPNR
rescheduled
ESC15-00024 General Inspection11/20/201511/20/201511/20/2015 1:21:06 PM PASS
Construction near complete. Yard is not yet landscaped/stabilized. Perimeter wattles installed and driveway is paved. No trackout or sediment runoff. Sidewalks and employee parking area on street have been swept. No corrections at this time.
ESC15-00177 Random Inspection11/20/201511/20/201511/20/2015 11:50:12 AMAPASS
Work is occuring on exterior finishes and interior. No trackout, no earth work occuring. DI bag is installed and has remaining capacity.

Disturbed area between silt fence and home has been hydroseed for stabilization.

No corrections at this time.
ESC15-01287 Site Preparation11/19/201511/20/201511/20/2015 11:42:13 AMAPART
WIP. Wattles on site and ready to be installed. Entrance is not yet built. Area of excavation is surrounded by preserved perimeter vegetation..

Need to post yellow sign - requested issued to RP-GC. No sediment leaving site. Will check for BMPs early next week.
ESC15-00627 General Inspection11/20/201511/20/201511/20/2015 11:17:27 AM PASS
ESC15-00776 General Inspection11/20/201511/20/201511/20/2015 11:05:49 AMPPART
No erosion or sediment runoff, but significant amount of trash and building material wrappings has blown offsite and stuck in bushes below silt fence.

Correction request to RP Bobby Silva to have litter pick up conducted weekly.
ESC15-00862 General Inspection11/20/201511/20/201511/20/2015 11:02:18 AMAPASS
WIP. Permit sign posted, stabilized entrance/loading area installed, and perimeter straw wattles are staked in and containing sediment. Rear hillside has been tracked horizontally to prevent erosion rills. Soil is very sand and infiltrates well.

No violations, no corrections.
ESC14-00488 Site Final11/20/201511/20/201511/20/2015 11:00:12 AMPPASS
Home construction complete. Yard is landscaped and stabilized, silt fence BMP has been removed.

No further ESC inspections needed. Adjacent project by Jayo is in progress. BLD is open. ESC finaled.
ESC15-00711 Aging Inspection11/20/201511/20/201511/20/2015 10:38:05 AM PASS
Residential addition complete. Disturbed area stabilized and construction materials cleaned. All permits finaled.
ESC15-00711 DOC - Permit Finaled11/20/201511/20/201511/20/2015 10:10:12 AMPPASS
ESC15-00258 Aging Inspection11/20/201511/20/201511/20/2015 9:40:57 AM PASS
ESC15-00257 Aging Inspection11/20/201511/20/201511/20/2015 9:40:47 AM PASS
ESC15-00623 General Inspection11/20/201511/20/201511/20/2015 8:50:11 AM PASS
Perimeter fiber wattles installed and staked down properly. Rock construction entrance and tracking pad is effectively controlling trackout. Downstream DI has sediment filter bags.

No corrections at this time.
ESC14-00572 General Inspection11/20/201511/20/201511/20/2015 8:49:10 AM PASS
Home complete and occupied. Rear hillside is still revegetating and straw wattles installed.

Will continue to monitor. Hackberry Ranch owner menioned another application of hydroseed will be conducted in areas below the parcel.